Please improve the report: Description of Condition: As supplementary to the condition…
Jump to turn (6)
- 1Please improve the report: Description of Condition: As supplementary to the con
- 2Please provide recommendation: Description of Condition: As supplementary to the
- 3Please correct: Description of Condition: This report serves as a supplementary
- 4Please correct: Enclosed is the the gouging report.
- 5Please correct: Recommendation: • To prevent further degradation, standard repla
- 6Please correct: • Structural reinforcement is needed to minimize vibration and p
- User
Please improve the report: Description of Condition:
As supplementary to the condition found report No. 4, the reported surface cracks found on bow thruster tunnel around flange base connecting motor and tunnel was gouged to evaluate the depth of penetration. Result found that crack section is extended significantly in length and depth. - Assistant
Report on Condition Assessment of Bow Thruster Tunnel
Description of Condition:
This report serves as a supplementary analysis to Condition Report No. 4. During our evaluation, we identified surface cracks located on the flange base where the motor connects to the bow thruster tunnel.
To assess the severity of these cracks, we performed a gouging procedure to investigate the depth of penetration. Our findings reveal that the cracks have significantly extended both in length and depth, indicating a concerning level of deterioration.