Thanks for your time with our team in providing the walkthrough of the report and…
- User
Thanks for your time with our team in providing the walkthrough of the report and sharing the minutes.
To add to these, below observations were noted in the report during our discussion:
• Asset inventory count was mismatching (Mac devices were missing from the list) • In end user asset report, Device ageing data count was not matching the inventory. • Arcon PAM IP needs to be validated (Already mentioned in MoM)
It is also discussed and agreed that we shall be connecting on Monthly basis (First week of each month) for report walkthrough. And Sify team shall be connecting with Sattrix team on weekly basis to bridge the current observed gaps.
Rewrite this in more better and presentable manner
- Assistant
Thank you for taking the time to provide our team with a walkthrough of the report and for sharing the minutes of the meeting. During our discussion, we identified the following observations in the report:
- The asset inventory count is inconsistent, with missing Mac devices.
- The device aging data in the end-user asset report does not align with the inventory.
- The IP address for Arcon PAM needs validation (as previously noted in the meeting minutes).
We also agreed to establish a regular connection for a monthly report walkthrough during the first week of each month. Additionally, the Sify and Sattrix teams will engage in weekly meetings to address and bridge the currently observed gaps.