The 90 mm pipe that has been pressurized recently is a sub-mainline pipe buried at a depth of 70 to 80 cm at most. It is not a lateral line, and it has no fittings except for valves.
-
It is challenging to re-pressurize the lateral pipes installed at a depth of 40 cm after being perforated with saddles and hoses, as this may cause the pipes to crack or get damaged.
-
If there is any problem or breakage in the lateral pipes, it will appear on the soil surface. Please note that the valves operate for specific durations according to the soil's watering needs.
-
If required to pressurize the valves per the specifications and standards, the valves are to be pressurized at operating pressure for 25 minutes, which is indeed done during on-site operation.
-
- Assistant
Here is a corrected and clarified version of the text:
-
The 90 mm pipe that has been recently pressurized is a sub-mainline pipe, buried at a depth of 70 to 80 cm. It is not a lateral line and has no fittings other than valves.
-
It is challenging to re-pressurize the lateral pipes, which are installed at a depth of 40 cm, after being perforated with saddles and hoses. Doing so may cause the pipes to crack or become damaged.
-
If there is any problem or breakage in the lateral pipes, it will be evident on the soil surface. Please note that the valves operate for specific durations, determined by the soil's watering needs.
-
When required to pressurize the valves according to the specifications and standards, the valves should be pressurized at the operating pressure for 25 minutes, as is done during on-site operation.
-