Please correct the report summary: This report marks 32 weeks into the construction of…
- User
Please correct the report summary: This report marks 32 weeks into the construction of H428. Current progress shows delay in completing the remaining primary and secondary structures in the superstructures and forepeak, as well as delays in electrical cabling installation and termination in the engine room, and SFP cladding. The fabrication have been working overtime to complete the bulwarks and secondary structures that would impact the painting and launching. With the upcoming vessel launch and OEM commissioning, Electrical team also implemented night shift to cope with their schedule on vessel power up and to commission the refrigeration system, fire detection system, and bilge system before launch. On the other side, Commissioning team have been preparing the AC watercooling for the refrigeration system operational test. HVAC and piping almost reaching now for completion, with reinstatement and main engine exhaust installation underway. Underwater machineries including sterntube, V-bracket, rudder, shaft line, V-bracket, Bobbin Shaft, Coupling, Shaft Seal, and Bearing have been installed now ready for launch. Painting will about to complete with the remaining hull antifouling application and fwd bulwark painting before the WASP arrival on October 28,2024 for vinyl wrap and logo installation. Few OEM are coming on yard before launch for the operational testing of refrigeration system, fire detection system. AMSA accredited surveyor will also come to witness the operational test, deck crane load test, and propeller and Shaft contact test. Logistic challenge on shipment delivery for all critical items for launch have now been resolved. Current under monitoring is the delivery of plastic hatch for the bonnet and rescue boat.
- Assistant
Report Summary:
This report marks 32 weeks into the construction of H428. Current progress indicates delays in completing the primary and secondary structures of the superstructures and forepeak, as well as setbacks in electrical cabling installation and termination in the engine room and SFP cladding. The fabrication team has been working overtime to complete the bulwarks and secondary structures, which are critical for the painting and launching processes.
In preparation for the upcoming vessel launch and OEM commissioning, the electrical team has implemented a night shift to meet their schedule for vessel power-up and to commission the refrigeration system, fire detection system, and bilge system before the launch. Meanwhile, the commissioning team is preparing the AC water cooling system for the operational testing of the refrigeration system. HVAC and piping installation are nearing completion, with reinstatement and main engine exhaust installation currently underway.
Underwater machinery, including the sterntube, V-bracket, rudder, shaft line, Bobbin Shaft, coupling, shaft seal, and bearings, have been installed and are now ready for launch. Painting is close to completion, with only the remaining hull antifouling application and forward bulwark painting left to be done before the WASP arrival on October 28, 2024, for vinyl wrap and logo installation.
Several OEM representatives will come to the yard before the launch for operational testing of the refrigeration and fire detection systems. An AMSA accredited surveyor will also be present to witness the operational test, deck crane load test, and propeller and shaft contact test.
Logistical challenges regarding the shipment delivery of all critical items for the launch have now been resolved. Currently, we are monitoring the delivery of the plastic hatch for the bonnet and the rescue boat.
- User
Please correct: Currently, the delivery of plastic hatch for the bonnet and rescue boat are under closed monitoring.
- Assistant
Currently, the delivery of the plastic hatch for the bonnet and the rescue boat is under close monitoring.
- User
Please correct: Currently, what is left for launch items are the delivery of plastic hatch for the bonnet and rescue boat which is being monitored closely.
- Assistant
Currently, the remaining items for the launch are the deliveries of the plastic hatch for the bonnet and the rescue boat, which are being monitored closely.