Assistant:
User: this is unformatted version of the doc embedded within tags.
You are a student who is about to submit this assignment, the wordings are dont but only formatting of the contents is left.
change formatting and make proper use of formatting styles wherever required to create a final output.
make sure the workings dont change .
use proper but might not everything from Font styles (bold, italic, underline), font types (arial), font sizes, text colors, highlighting, superscript, subscript, strikethrough, all caps, small caps, paragraph alignment (left, right, center, justified), line spacing, paragraph spacing, indentation (first line, hanging), page margins, headers and footers, page numbers, section breaks, columns, bullet points, numbered lists, multilevel lists, tables (with various border styles and cell shading), table of contents, index, footnotes, endnotes, captions for figures and tables, cross-references, hyperlinks, bookmarks, track changes, comments, watermarks, page borders, text boxes, pullquotes, sidebars, drop caps, styles (heading styles, normal text, quote, etc.
), cover pages, bibliographies, citations, appendices, page orientation (portrait, landscape), custom page sizes, background colors or images, text wrapping around images or objects, equations (using equation editor), symbols, language settings for spell-check and hyphenation, kerning, ligatures, stylistic sets (for fonts that support them), text effects (shadow, outline, glow, etc.
)
based on this generate me a complete latex code and make sure you dont miss out anything.
ensure proper spacing too.
like equal spacing between bullet points and other type for paragraph or similar and so on. keep in mind the spacing between similar type of objects should be 1 pt. for eg, between two bullet points or a single paragraph it should be 1 pt. while between 2 different paragraphs or text after bullet points, it should be 1.15pt. also between 2 main sections it should be 1.5pt for eg when start of a new section like introduction , it should be 1.5pt.
just give me the complete latex code without anything else. make sure the code should compile properly. Read the text properly, and make adjustments as per your needs proper line breaks, starting new sentences or section on new lines and so on. amke sure the alignments of each relevent sections matches. all the tables should have complete all borders with bold heading and light blue background in headers.
BLDG 6851 | Final Report Group 9
BLDG 6851 / BCEE 464: Project Cost Estimating
Mid-Term Report
Group 09
Last Name First Name Student ID
Karbhari Meet 40274215
Gajera Sajani ben
Pravinbhai 40255830
Kumar Anmol 40262329
Patel Shivam 40270919
Pimparkar Suchita 40254828
Ahmed Faizaan 40293762
Soni Sahil 40292702
Instructor
Prof. Po -Han Chen
Department of Building, Civil & Environmental Engineering
Concordia University
Fall 2024
BLDG 6851 | Final Report Group 9
2 | P a g e
Table of Contents
List of figures
Figure 1 : RS Means data for sample project ................................ ................................ .................. 5
Figure 2 : RS Means data for sample project ................................ ................................ .................. 5
Figure 3: Historical Cost Indexes ................................ .................. Error! Bookmark not defined. BLDG 6851 | Final Report Group 9
3 | P a g e
Figure 4 : Level differences in the basement area ................................ ................................ .......... 9
Figure 5: Wall arrangement assumption and Main floor plan ................................ ...................... 11
Figure 6: EW assumptions ................................ ................................ ................................ ............ 13
List of Tables
Table 1 : Conceptual Cost Estimation data ................................ ................................ ..................... 5
Table 2 : Excavation level from the NGL ................................ ................................ ....................... 8
Table 3: Quantity for Exterior Wall - Basement Floor ................................ ................................ . 10
Table 4: Quantity for Exterior Wall - Main Floor ................................ ................................ ........ 13
BLDG 6851 | Final Report Group 9
4 | P a g e
Introduction (Suchita, Shivam)
This report provides a comprehensive assessment of the cost estimation methodology applied to a
residential construction project located in North York, Toronto. The report focuses on key aspects
such as conceptual cost estimation, quantity takeoff, elemental cost estimation, equipment pricing,
and material pricing, ensuring that each element is analyzed and estimated with precision to meet
the project’s current financial goals. The primary objective of this analysis is to offer a thorough
and well -documente d projection of the project’s costs while aligning with industry standards and
market conditions.
This project is a residential development in North York, Toronto, designed as building type,
“Residential – Detached” (2 Storey residential + basement and garage ) with a total project area of
5,532 square feet and a livable space of 1,718.65 square feet.
Methodology (Anmol, Faizaan, Sahil)
In the following section with the different methods of cost estimation , methodology will be
discussed. Mainly there are three methods which are Conceptual cost estimation, Elemental cost
estimation and Quantity take -offs. Additionally, all assumptions made during the estimation
process are outlined, accompanied by justifications that provide reasonable explanations for their
inclusion.
In the very beginning stages of a project, conceptual cost estimation was derived because it allows
to generate an approximate cost range early in the planning phase, even in the absence of detailed
information.
After this , a hierarchy structure called WBS was created according to Uniformat to perform
elemental cost estimation because it provides a structured and detailed approach to estimating the
costs of individual components, such as the superstructure, foundations, finishing, and services.
This method allows us to break down the project into its core elements, giving us a c learer
understanding of how costs are distributed across different areas.
Additionally , we are utilizing quantity take -offs including the RS Means database to ensure a
precise and detailed assessment of the materials, components, and labour required for construction.
The decision to use quantity take -offs, rather than relying on rough estimates or generalized
assumptions, is driven by the need for accuracy and control. Accurate quantity take -offs enable us
to anticipate the exact amount of materials required, avoiding potential shortages or excesses that
could lead to delays or cost overruns.
Software such as Bluebeam Revu and Microsoft Excel were used for cost estimation. These tools
allowed us to perform detailed quantity takeoffs, budgeting, and cost analysis with precision and
efficiency.
BLDG 6851 | Final Report Group 9
5 | P a g e
Figure 1 : RS Means data for sample project Figure 2 : RS Means data for sample project Assumption s/Justifications (Team)
The following are the basic assumptions for the project. More detailed assumptions will be
discussed throughout the study.
• The project has already been awarded following the bidding phase and will be delivered
using the Design -Bid-Build method.
• These drawings contain architectural and structural plans. The Owner's project scope also
includes site preparation and landscaping.
• The services work package is not incorporated into the WBS due to the absence of MEP -
related drawings .
• The Services work package is not considered for the calculation of Elemental estimation
and Quantity Takeoff.
• The applied year is 20 24 considering the inflation rate for Q4 of 20 14.
• The capacity ratio exponent is assumed as 1.00
Conceptual Cost Estimation (Suchita, Sahil, Faizaan, Shivam)
For Conceptual cost estimation, the sample project from RS Means database is considered for
reference purposes. Following shows the comparison between proposed and reference building
data:
Table 1 : Conceptual Cost Estimation data
Data Reference Project Proposed Project
Location Toronto, Ontario Toronto, Ontario
Year 2018 2024
Building
Type 2 Story Residential with Furnished
Basement + Garage 2 Story Residential with Furnished
Basement + Garage
Total Area 4400 Sq. ft 5534.37 Sq. ft
Total Cost $601,935.82 854130.4151 BLDG 6851 | Final Report Group 9
6 | P a g e
Area breakdown for proposed project:
Basement Area: 1338.84 Sq. ft
Main Floor Area: 1826.52 Sq. ft
Second Floor Area: 1759.36 Sq. ft Garage Area: 422.28 Sq. ft
Front Yard: 158.19 Sq. ft
Porch: 29.18 Sq. ft
Total Area = 1338.84 + 1826.52 + 1759.36 + 422.28 + 158.19 + 29.18 = 5534.37 Sq ft
To calculate the final cost, adjustments must be done for time and size, as projects vary in these
areas.
Time Adjustment :
Since the sample project is from 2018, a time adjustment for 2024 is required based on the
annualized rate of return. The annualized rate of return calculation is given below.
i = (FV/ PV) ^ (1/n) – 1 (Estimating Construction Costs” by R.L. Peurifoy and G.D. Oberlender,
Sixth Edition, McGrawHill, 2013.)
FV = Index for
2018 = 215.8 PV = Index for
2009 = 180.1 n = 9 Years i = annualized
rate of return
Figure 3 : Historical Cost Indexe s
Therefore, i = (215.8 / 180.1) ^ (1/9) - 1 = 0.0202965
Time Adjustment = Index for 2024 / Index of 2018= 243.45 / 215.8 = 1.1281282
BLDG 6851 | Final Report Group 9
Size Adjustment :
Since the area of reference project and proposed project are different, size /capacity adjustment is
required to adjust the final cost . This adjustment is based on the capacity ratio exponent. In this
case, the exponent is assumed as 1.00, which implies the cost would grow linearly with the size.
When the exponent is less than 1, the cost increases more slowly than the size .
Size Adjustment = (Area of Proposed building / Area of Reference Project) ^ 1.00
= (5534.37 /4400) ^ 1.00
= 1.257811364
The above value means that the proposed project (which is larger than the reference project in
terms of area) results in a cost adjustment factor of 1.257. With t his factor the cost adjustment
would be linear , meaning the cost would increase directly in proportion to the size of the project.
Using the cost of reference project and all the adjustment factors, final cost can be calculated as
follows:
Final Cost = Total Cost of Reference Project × Time Adjustment × Size Adjustment
= 601935.82∗1.128128277∗1.257811364= 854130.4151
The conceptual cost for the proposed project is estimated as $ 854130.4151
Work Breakdown Structure (Sajani, Meet)
As Work Breakdown Structure (WBS) is a straightforward method for cost estimation, it organizes
the project's deliverables and work components into smaller, more manageable units known as
work packages, providing a clearer understanding of the work to be pe rformed. (Sérgio Sequeira,
In this report, WBS (Work Breakdown Structure) was determined based on the Uniformat system
for proper understanding of the work packages. The following WBS built according to the
CSI/CSC Uniformat system . (CSI, 2024) (refer Appendix A )
Elemental Cost Estimation (Sajani, Meet, Anmol)
Most elements are defined through the WBS, and elemental cost estimation is performed by
comparing in -house data from previous projects with the projected costs of the proposed project.
The proposed project was compared with a similar one in terms of funct ion, design, and location.
Although the referenced project is slightly smaller, the derived prices were adjusted to a Unit/SQ.
FT basis to accurately reflect costs during the cost calculation.
The Elemental cost estimation was performed in two phases. In Phase 1, the reference project was
analyzed, compiling the final actual cost and deriving prices for each element on a Unit/SQ. FT
basis. In Phase 2, using the cost data from Phase 1, the final cost of the proposed project was
calculated for each element. The information is presented in the table for each phase, structured
according to the CSI/CSC Uniformat system (CSI, 2024)
BLDG 6851 | Final Report Group 9
8 | P a g e
Phase 1: In house date from previous projects (Elemental Analysis of a previous Project)
For Phase 1 elemental cost estimation, the used reference project has 2421.87 SF, gross floor area
and it was built in February 2021, the final total cost of the project was 372,222.Atthispoint,wecalculatedtheratio(Quantity/GFA),unitrate(Subto795,898.68, before time adjustment. Since the reference project was
built in 2021, a time adjustment was necessary, bringing the final project cost to $859,619.24 (Refer
Appendix C)
Quantity Takeoff
Given the time -consuming nature of manually extracting quantities from project drawings and
specifications, two methods were employed for the quantity takeoff (QTO). A portion of the
takeoff was conducted manually, while the remainder was measured using th e estimating software
Bluebeam Revu 2.0 , (Bluebeam, 2024) which significantly improved the accuracy of the quantity
measurements .
After performing both manual and automated QTOs, with the results compiled into an Excel table
(refer Appendix D). The table was structured according to the Master Format system, categorizing
quantities based on material requirements. Selected manual calculations are detailed in the
following sections, with a demonstration of the software provided in Appendix E.
Excavation (Meet):
The structure has an 8" thick mat foundation across the 20 15 ft² built -up area, including footings
outside the basement. Excavation was done for the entire area, with calculations performed in
Bluebeam . The foundation is not parallel to the ground surface due to slight deviations in the soil
profile, preventing alignment. Table 2 shows levels from NGL. The foundation and excavation
have a step -down level of 174.53 and a step -up level of 174.33, connected by a 24" x 24" step
concrete. Figure 4 illustrates the level variations and areas of the lower and step -down base ments.
Average Level of excavation (m) 175.755
Lowest level (step down) (m) 174.53
Lowest level (step -up) (m) 174.33
Table 2 : Excavation level from the NGL BLDG 6851 | Final Report Group 9
9 | P a g e
Figure 4 : Level differences in the basement area
The 3" offset in the drawings was calculated as extra area and added to the total excavation area
of the foundations. The excavation quantity for the strip footing, basement area, and columns
outside the basement, based on the depths from NGL in Table 2, was calculated to be area*depth
= 2015 Sq. ft * 4.674ft = 9418.11 cubic feet as equal to 348.8188 Cubic Yard
Foundation (Shivam):
The foundation is made up strip footing, isolated footing, combined footing, step footing and the
offsets in the strip footing, each having precise measurements . For the footings, the estimated total
concrete volume is 491 ft3. Using the following footing types, this volume is calculated: a square
footing (F1) of 48 inches by 48 inches and 10 inches deep; a rectangular footing (F3) of 32 inches
by 60 inches and 8 inches deep; and a strip footing measuring 18 inches by 8 inches.
We deduct the volume of concrete from the total volume of excavation to get the backfill volume
needed for the project. 491 ft3 make up the concrete volume, which includes the foundations. The
entire excavation volume, which reflects the space excavated ou t for the footings, amounts to
8915.44 ft3. Based on our computation, the backfill volume comes out to be 8424.44 ft3. This
volume represents the quantity of material required to restore the site and make it ready for further
work after the concrete has be en poured and set in the excavated regions surrounding the
foundations.
Since it was anticipated that the concrete would only cure at the top face of the footings, the area
of concrete was estimated as l x b. As a result, the total quantity of curing was determined to be
737 ft2, and the total cost of curing was determined by RS methods per 100 sq. ft. The entire cure
cost came to $ 206.77.
Slab on grade
According to drawings, the basement floor will be prepared with a 4" concrete slab over a 3" gravel
layer. For accurate quantity takeoff, a part -to-whole approach was used, dividing the drawing into
smaller sections.
For the 3" thick gravel layer, the quantity is calculated using the formula: Length * Width *
Thickness, yielding 442.02 ft³.
For the 4" thick, 20 MPA (~3000 PSI) concrete slab, the same formula is applied to calculate the
volume.
The Concrete quantity on the slab on grade for 4” thick is 603.9 ft³ and for curing quantity refer
Table 5 for detailed breakdown.
BLDG 6851 | Final Report Group 9
10 | P a g e
Floor (ft) Length (ft) Width (ft) Thickness (ft) Volume ( ft³)
Basement 43.25 39.9 0.33 517.7
3.67 6.3 0.33 6.93
8 1.64 0.33 3.94
2.16 2.86 0.33 1.85
19 12 0.33 68.4
3.54 4.83 0.33 5.07
Total Quantity( ft³) 603.9
Walls (Suchita, Sahil)
A. Exterior Walls (Suchita)
The basement wall assembly comprises a concrete foundation wall extending 4.13 feet in height,
topped by a concrete block wall rising to a total height of 10 feet. The interior of the wall is finished
with a stud wall lining. For quantity takeoff purposes, the walls are designated as North, South,
West, and East.
Wall L (Ft) H (Ft) Deduction Total Area (Sq.ft)
South wall 38.67 10 108.00 278.67
West Wall 40.52 10 0.00 405.21
North Wall 58.67 10 45.60 541.07
East Wall 20.35 10 0.00 203.54
Table 3: Quantity for Exterior Wall - Basement Floor
For the concrete portion of the wall, formwork, concrete quantity and waterproofing for the
interior and exterior was considered. For the stud wall portion, it consists of components such as
top and bottom plates, wall studs, gypsum board sheathing, interior insulation, exterior rigid
insulati on, and headers and trimmers for wall openings. BLDG 6851 | Final Report Group 9
11 | P a g e
Figure 5: Wall arrangement assumption and Main floor plan
Sample Calculation of Basement wall: South Wall
Concrete Wall - Assuming C25 Concrete Mix (1:1:2)
a. Formwork Calculations
Total surface area = Length of wall * height of wall
= 38.67 * 4.13 = 159.70 Sq. Ft.
b. Quantity of Concrete=Length x width x height
=38.67 * 0.83 * 4.13
=132.55 Cubic Foot
2. Concrete Blockwork
Number of Blocks = Surface area of wall / Surface area of one block
= 278.67 / ((8/12) (24/12)) = 208 Nos
(Assuming solid 4''x 8'' x 24'' concrete block including mortar)
3. Waterproofing interior and exterior:
Surface area of wall = 38.674.13
= 159.35 SF
For exterior waterproofing, a Type A Bitumen membrane is chosen to act as barrier protection
for the structure. For interior waterproofing, a Type C membrane has been considered.
4. Studs Calculation (Assuming spacing=1.33’)
No. of studs required = (Length of the wall / Spacing of studs) + 1
= (38.67 / 1.33) +1 = 30 Nos
Quantity in Board feet = No of studs x ((2 x 4) / 12) x 10
= 30 x ((2 x 4) / 12) x 10 = 200 BF
(Assuming 2''x4'' lumber, 2 extra studs per corner and 2 studs for each wall opening, Length of the
stud is 10 ft)
5. Top and bottom plates
BLDG 6851 | Final Report Group 9
12 | P a g e
Length in linear feet = Length of wall x 2
= 38.67 x 2 = 77.33 LF
Length in board feet = Length in LF x ((2 x 4) / 12)
= 77.2 x (2 x 4) / 12)
= 51.56 BF
(Assuming 2'' x 4'' lumber and since it is a non -loading bearing wall, one top and one
bottom plates are considered.)
6. Gypsum Board
Total SF of gypsum board required = Length of wall x height of wall
= 38.67 x 10 = 386.67 SF
No of gypsum board required = (Length / 8’) + (Height / 4’)
= (38.6 / 8) + (10 / 4) = 7 Nos
(Assuming a gypsum board of size 4’ x 8’)
7. Interior insulation
Insulation quantity = (Length x Height) - (deducting openings for W08 two times)
= (38.67 x 10) - (2 x (9 x 6))
= 278.67 SF (Assuming 3.5’’ cavity insulation (R15))
8. Exterior Rigid Insulation
Insulation quantity = (Length x Height) - (deducting openings for W08 two times)
= (38.67 x 10) - (2 x (9 x 6))
= 278.67 SF (Assuming 1’’ fiberglass insulation)
9. Headers (Quantity of Headers) = (Length of opening + 7’’ spacing) x 2
= (9+(7/12)) * 2= 38 BF
The south wall has two W09 windows. (Assuming 2'' x 12'' lumber and 7'' extra space for windows
and two headers per opening.
Sill = (Length of opening + 7’’) x 2
= (9+(7/12)) * 2 = 19.17 LF
= 19.17 * (2*4/12) = 38.33 BF
(Assuming 2' 'x 4'' lumber and 7'' extra space for windows and two sills per opening).
Trimmer (Length of Trimmers) = (Sill height + height of opening) x 2
= (2 + 6) x 2 = 17 LF
= 16 * ((4 X 6) / 12) = 32 BF
(Height of W08 is 6’ and Sill height is 2’)
Main Floor Exterior Wall
The first -floor exterior wall is a wooden stud wall 10’ height with exterior brick veneer cladding.
The dimensions of exterior walls are calculated using Bluebeam software and required details of
windows, doors etc. are taken from schedule provided in the drawings .
Wall L (Ft) B (Ft) H (Ft) Deduction Total
South wall 38.60 0.83 10.00 108.00 278.04
West Wall 43.31 0.83 10.00 66.00 367.13
North Wall 42.71 0.83 10.00 92.00 335.08 BLDG 6851 | Final Report Group 9
13 | P a g e
East Wall 43.17 0.83 10.00 60.00 371.67
Table 4: Quantity for Exterior Wall - Main Floor
Sample Calculation of First floor wall: South Wall
Studs Calculation (Assuming spacing=1.33’)
No. of studs required = (Length of the wall / Spacing of studs) + 1
= (38.67 / 1.33) +1 = 30 Nos
Quantity in Board feet = No of studs x ((2 x 4) / 12) x 10
= 30 x ((2 x 4) / 12) x 10 = 200 BF
(Assuming 2''x4'' lumber, 2 extra studs per corner and 2 studs for
each wall opening, Length of the stud is 10 ft)
Top and bottom plates
Length in linear feet = Length of wall x 2
= 38.67 x 2 = 77. 21LF
Length in board feet = Length in LF x ((2 x 6) / 12)
= 77.2 1 x (2 x 6) / 12)
= 77.21 BF
(Assuming 2'' x 6'' lumber and since it is a non -loading bearing wall,
one top and one bottom plates are considered.)
Gypsum Board
Total SF of gypsum board required = Length of wall x height of wall
= 38.67 x 10 = 386.67 SF
No of gypsum board required = (Length / 8’) + (Height / 4’)
= (38.6 7 / 8) + (10 / 4) = 7 Nos
(Assuming a gypsum board of size 4’ x 8’)
Interior insulation
Insulation quantity = (Length x Height) - (deducting openings for W08 2Nos. )
= (38.67 x 10) - (108 Sq.ft. )
= 278. 04 SF (Assuming 3.5’’ cavity insulation (R15))
Exterior Rigid Insulation
Insulation quantity = (Length x Height) - (deducting openings for W08 2Nos. )
= (38.67 x 10) - (108 Sq.ft. )
= 278. 04 SF (Assuming 1’’ fiberglass insulation)
Headers (Quantity of Headers) = (Length of opening + 7’’ spacing) x 2
= (9+(7/12)) * 2 = 38 BF
The south wall has two W0 8 windows. (Assuming 2'' x 12'' lumber and 7'' extra space for windows
and two headers per opening.
Sill = (Length of opening + 7’’) x 2
= (9+(7/12)) * 2 = 19.17 LF
= 19.17 * (2* 6/12) = 19.17 BF
(Assuming 2' 'x 6'' lumber and 7'' extra space for windows and two sills per opening).
Trimmer (Length of Trimmers) = (Sill height + height of opening) x 2
= (2 + 6) x 2 = 1 6 LF
= 16 * ((4 X 6) / 12) = 3 2 BF
Figure 6: EW assumptions
Assistant:
latex
\documentclass[12pt]{report}
\usepackage[left=1in, right=1in, top=1in, bottom=1in]{geometry}
\usepackage{graphicx}
\usepackage{color}
\usepackage{titlesec}
\usepackage{hyperref}
\usepackage{fancyhdr}
\usepackage{setspace}
\usepackage{booktabs}
\usepackage{caption}
\definecolor{lightblue}{rgb}{0.8,0.85,1}
\pagestyle{fancy}
\fancyhf{}
%\graphicspath{{images/}}
% Footer and header settings
\fancyhead[L]{BLDG 6851 | Final Report}
\fancyhead[R]{Group 9}
\fancyfoot[C]{\thepage}
% Spacing settings
\setlength{\parindent}{0.5in}
\setlength{\parskip}{1.15pt}
\titleformat{\section}{\bfseries\LARGE\color{black}}{\thesection}{1em}{}
\titlespacing*{\section}{0pt}{1.5pt}{1.5pt}
% Table settings
\newcommand{\lightblueheading}[1]{\rowcolor{lightblue} #1}
% Begin document
\begin{document}
\begin{center}
\textbf{\Huge{BLDG 6851 | Final Report}}\\
\textbf{\Large{Group 9}}\\
\vspace{0.5in}
\end{center}
\begin{center}
\textbf{\Large{BLDG 6851 / BCEE 464: Project Cost Estimating}}\\
\textbf{\Large{Mid-Term Report}}\\
\vspace{0.3in}
\end{center}
\textbf{Group 09}\\
\begin{spacing}{1.15}
\begin{tabbing}
Last Name \quad \= First Name \quad \= Student ID\\
Karbhari \quad \= Meet \quad \= 40274215\\
Gajera \quad \= Sajani ben \quad \= Pravinbhai 40255830\\
Kumar \quad \= Anmol \quad \= 40262329\\
Patel \quad \= Shivam \quad \= 40270919\\
Pimparkar \quad \= Suchita \quad \= 40254828\\
Ahmed \quad \= Faizaan \quad \= 40293762\\
Soni \quad \= Sahil \quad \= 40292702\\
\end{tabbing}
\end{spacing}
\begin{flushleft}
\textbf{Instructor}\\
Prof. Po-Han Chen\\
Department of Building, Civil \& Environmental Engineering\\
Concordia University\\
Fall 2024\\
\end{flushleft}
\vspace{1.5pt}
\tableofcontents
\newpage
\listoffigures
\newpage
\listoftables
\newpage
\section{Introduction (Suchita, Shivam)}
\begin{onehalfspace}
This report provides a comprehensive assessment of the cost estimation methodology applied to a residential construction project located in North York, Toronto. The report focuses on key aspects such as conceptual cost estimation, quantity takeoff, elemental cost estimation, equipment pricing, and material pricing, ensuring that each element is analyzed and estimated with precision to meet the project’s current financial goals. The primary objective of this analysis is to offer a thorough and well-documented projection of the project’s costs while aligning with industry standards and market conditions.
This project is a residential development in North York, Toronto, designed as building type, “Residential – Detached” (2 Storey residential + basement and garage) with a total project area of 5,532 square feet and a livable space of 1,718.65 square feet.
\end{onehalfspace}
\section{Methodology (Anmol, Faizaan, Sahil)}
\begin{onehalfspace}
In the following section with the different methods of cost estimation, methodology will be discussed. Mainly there are three methods which are Conceptual cost estimation, Elemental cost estimation and Quantity take-offs. Additionally, all assumptions made during the estimation process are outlined, accompanied by justifications that provide reasonable explanations for their inclusion.
In the very beginning stages of a project, conceptual cost estimation was derived because it allows to generate an approximate cost range early in the planning phase, even in the absence of detailed information.
After this, a hierarchy structure called WBS was created according to Uniformat to perform elemental cost estimation because it provides a structured and detailed approach to estimating the costs of individual components, such as the superstructure, foundations, finishing, and services. This method allows us to break down the project into its core elements, giving us a clearer understanding of how costs are distributed across different areas.
Additionally, we are utilizing quantity take-offs including the RS Means database to ensure a precise and detailed assessment of the materials, components, and labour required for construction. The decision to use quantity take-offs, rather than relying on rough estimates or generalized assumptions, is driven by the need for accuracy and control. Accurate quantity take-offs enable us to anticipate the exact amount of materials required, avoiding potential shortages or excesses that could lead to delays or cost overruns.
Software such as Bluebeam Revu and Microsoft Excel were used for cost estimation. These tools allowed us to perform detailed quantity takeoffs, budgeting, and cost analysis with precision and efficiency.
\end{onehalfspace}
\begin{figure}[!h]
\centering
\includegraphics[width=0.5\textwidth]{fig1.jpg}
\caption{RS Means data for sample project}
\end{figure}
\begin{figure}[!h]
\centering
\includegraphics[width=0.5\textwidth]{fig2.jpg}
\caption{RS Means data for sample project}
\end{figure}
\section{Assumptions/Justifications (Team)}
\begin{onehalfspace}
The following are the basic assumptions for the project. More detailed assumptions will be discussed throughout the study.
\begin{itemize}
\item The project has already been awarded following the bidding phase and will be delivered using the Design-Bid-Build method.
\item These drawings contain architectural and structural plans. The Owner's project scope also includes site preparation and landscaping.
\item The services work package is not incorporated into the WBS due to the absence of MEP-related drawings.
\item The Services work package is not considered for the calculation of Elemental estimation and Quantity Takeoff.
\item The applied year is 2024 considering the inflation rate for Q4 of 2014.
\item The capacity ratio exponent is assumed as 1.00.
\end{itemize}
\end{onehalfspace}
\section{Conceptual Cost Estimation (Suchita, Sahil, Faizaan, Shivam)}
\begin{onehalfspace}
For Conceptual cost estimation, the sample project from RS Means database is considered for reference purposes. Following shows the comparison between proposed and reference building data:
\end{onehalfspace}
\begin{table}[h]
\centering
\caption{Conceptual Cost Estimation data}
\begin{tabular}{|l|l|l|}
\hline
\lightblueheading{Data} & \lightblueheading{Reference Project} & \lightblueheading{Proposed Project} \\ \hline
Location & Toronto, Ontario & Toronto, Ontario \\ \hline
Year & 2018 & 2024 \\ \hline
Building Type & 2 Story Residential with Furnished Basement + Garage & 2 Story Residential with Furnished Basement + Garage \\ \hline
Total Area & 4400 Sq. ft & 5534.37 Sq. ft \\ \hline
Total Cost & \$601,935.82 & \$854130.4151 \\ \hline
\end{tabular}
\end{table}
\begin{onehalfspace}
\noindent 1. Area breakdown for proposed project:
\begin{itemize}
\item Basement Area: 1338.84 Sq. ft
\item Main Floor Area: 1826.52 Sq. ft
\item Second Floor Area: 1759.36 Sq. ft
\item Garage Area: 422.28 Sq. ft
\item Front Yard: 158.19 Sq. ft
\item Porch: 29.18 Sq. ft
\end{itemize}
\noindent Total Area = 1338.84 + 1826.52 + 1759.36 + 422.28 + 158.19 + 29.18 = 5534.37 Sq ft
\noindent To calculate the final cost, adjustments must be made for time and size, as projects vary in these areas.
\noindent 2. Time Adjustment :
Since the sample project is from 2018, a time adjustment for 2024 is required based on the annualized rate of return. The annualized rate of return calculation is given below.
\[ i = \left(\frac{\text{FV}}{\text{PV}}\right)^{1/n} - 1 \]
(Estimating Construction Costs” by R.L. Peurifoy and G.D. Oberlender, Sixth Edition, McGrawHill, 2013.)
\begin{itemize}
\item FV = Index for 2018 = 215.8
\item PV = Index for 2009 = 180.1
\item n = 9 Years
\item i = annualized rate of return
\end{itemize}
\begin{figure}[h]
\centering
\includegraphics[width=0.5\textwidth]{fig3.jpg}
\caption{Historical Cost Indexes}
\end{figure}
Therefore, \( i = \left(\frac{215.8}{180.1}\right)^{1/9} - 1 = 0.0202965 \)
\noindent Time Adjustment = Index for 2024 / Index of 2018 = 243.45 / 215.8 = 1.1281282
\noindent 3. Size Adjustment:
Since the area of reference project and proposed project are different, size /capacity adjustment is required to adjust the final cost. This adjustment is based on the capacity ratio exponent. In this case, the exponent is assumed as 1.00, which implies the cost would grow linearly with the size. When the exponent is less than 1, the cost increases more slowly than the size.
\[ \text{Size Adjustment} = \left(\frac{\text{Area of Proposed building}}{\text{Area of Reference Project}}\right)^{1.00} = \left(\frac{5534.37}{4400}\right)^{1.00} = 1.257811364 \]
The above value means that the proposed project (which is larger than the reference project in terms of area) results in a cost adjustment factor of 1.257. With this factor, the cost adjustment would be linear, meaning the cost would increase directly in proportion to the size of the project. Using the cost of reference project and all the adjustment factors, final cost can be calculated as follows:
\[ \text{Final Cost} = \text{Total Cost of Reference Project} \times \text{Time Adjustment} \times \text{Size Adjustment} \]
\[ = \$601935.82 \times 1.128128277 \times 1.257811364 = \$854130.4151 \]
The conceptual cost for the proposed project is estimated as \$ 854130.4151.
\end{onehalfspace}
\section{Work Breakdown Structure (Sajani, Meet)}
\begin{onehalfspace}
As Work Breakdown Structure (WBS) is a straightforward method for cost estimation, it organizes the project's deliverables and work components into smaller, more manageable units known as work packages, providing a clearer understanding of the work to be performed. (Sérgio Sequeira, 2015)
In this report, WBS (Work Breakdown Structure) was determined based on the Uniformat system for proper understanding of the work packages. The following WBS built according to the CSI/CSC Uniformat system. (CSI, 2024) (refer Appendix A)
\end{onehalfspace}
\section{Elemental Cost Estimation (Sajani, Meet, Anmol)}
\begin{onehalfspace}
Most elements are defined through the WBS, and elemental cost estimation is performed by comparing in-house data from previous projects with the projected costs of the proposed project. The proposed project was compared with a similar one in terms of function, design, and location. Although the referenced project is slightly smaller, the derived prices were adjusted to a Unit/SQ. FT basis to accurately reflect costs during the cost calculation.
The Elemental cost estimation was performed in two phases. In Phase 1, the reference project was analyzed, compiling the final actual cost and deriving prices for each element on a Unit/SQ. FT basis. In Phase 2, using the cost data from Phase 1, the final cost of the proposed project was calculated for each element. The information is presented in the table for each phase, structured according to the CSI/CSC Uniformat system (CSI, 2024)
\subsection*{Phase 1: In-house data from previous projects (Elemental Analysis of a previous Project)}
For Phase 1 elemental cost estimation, the used reference project has 2421.87 SF, gross floor area and it was built in February 2021, the final total cost of the project was \$372,222. At this point, we calculated the ratio (Quantity/GFA), unit rate (Subtotal/Quantity), total cost for each section (Sum of section components), and the percentage distribution of each section. (refer Appendix B)
\subsection*{Phase 2: Projected Costs of the proposed projects (Elemental Estimate for the cost of the future project)}
In Phase 2, the elemental cost summary from Phase 1 was used. By multiplying the unit cost by the quantity of each element and summing the costs of the components within each element, the elemental cost estimate for the project was calculated. At this stage, a contingency percentage was added before determining the final project cost. Since soil conditions had not yet been inspected and to protect the budget against unforeseen circumstances such as inflation, project delays, and fluctuations in labor and material costs, a 10\% contingency was applied, especially as 100\% Construction Drawings (CD) were already available (Rabbet, 2024). The estimated final cost of the proposed project was \$795,898.68, before time adjustment. Since the reference project was built in 2021, a time adjustment was necessary, bringing the final project cost to \$859,619.24 (Refer Appendix C)
\end{onehalfspace}
\section{Quantity Takeoff}
\begin{onehalfspace}
Given the time-consuming nature of manually extracting quantities from project drawings and specifications, two methods were employed for the quantity takeoff (QTO). A portion of the takeoff was conducted manually, while the remainder was measured using the estimating software Bluebeam Revu 2.0, (Bluebeam, 2024) which significantly improved the accuracy of the quantity measurements.
After performing both manual and automated QTOs, with the results compiled into an Excel table (refer Appendix D). The table was structured according to the Master Format system, categorizing quantities based on material requirements. Selected manual calculations are detailed in the following sections, with a demonstration of the software provided in Appendix E.
\end{onehalfspace}
\subsection{Excavation (Meet):}
\begin{onehalfspace}
The structure has an 8" thick mat foundation across the 2015 ft² built-up area, including footings outside the basement. Excavation was done for the entire area, with calculations performed in Bluebeam. The foundation is not parallel to the ground surface due to slight deviations in the soil profile, preventing alignment. Table 2 shows levels from NGL. The foundation and excavation have a step-down level of 174.53 and a step-up level of 174.33, connected by a 24" x 24" step concrete. Figure 4 illustrates the level variations and areas of the lower and step-down basements.
\noindent Average Level of excavation (m) 175.755
\noindent Lowest level (step down) (m) 174.53
\noindent Lowest level (step-up) (m) 174.33
\end{onehalfspace}
\begin{table}[h]
\centering
\caption{Excavation level from the NGL}
\begin{tabular}{|l|l|}
\hline
\lightblueheading{Description} & \lightblueheading{Value (m)} \\ \hline
Average Level of excavation & 175.755 \\ \hline
Lowest level (step down) & 174.53 \\ \hline
Lowest level (step-up) & 174.33 \\ \hline
\end{tabular}
\end{table}
\begin{figure}[h]
\centering
\includegraphics[width=0.5\textwidth]{fig4.jpg}
\caption{Level differences in the basement area}
\end{figure}
\begin{onehalfspace}
The 3" offset in the drawings was calculated as extra area and added to the total excavation area of the foundations. The excavation quantity for the strip footing, basement area, and columns outside the basement, based on the depths from NGL in Table 2, was calculated to be area*depth = 2015 Sq. ft * 4.674ft = 9418.11 cubic feet, equivalent to 348.8188 Cubic Yard.
\end{onehalfspace}
\subsection{Foundation (Shivam):}
\begin{onehalfspace}
The foundation is made up of strip footing, isolated footing, combined footing, step footing and the offsets in the strip footing, each having precise measurements. For the footings, the estimated total concrete volume is 491 ft³. Using the following footing types, this volume is calculated: a square footing (F1) of 48 inches by 48 inches and 10 inches deep; a rectangular footing (F3) of 32 inches by 60 inches and 8 inches deep; and a strip footing measuring 18 inches by 8 inches.
We deduct the volume of concrete from the total volume of excavation to get the backfill volume needed for the project. 491 ft³ make up the concrete volume, which includes the foundations. The entire excavation volume, which reflects the space excavated out for the footings, amounts to 8915.44 ft³. Based on our computation, the backfill volume comes out to be 8424.44 ft³. This volume represents the quantity of material required to restore the site and make it ready for further work after the concrete has been poured and set in the excavated regions surrounding the foundations.
Since it was anticipated that the concrete would only cure at the top face of the footings, the area of concrete was estimated as l x b. As a result, the total quantity of curing was determined to be 737 ft², and the total cost of curing was determined by RS methods per 100 sq. ft. The entire cure cost came to \$206.77.
\end{onehalfspace}
\subsection{Slab on grade}
\begin{onehalfspace}
According to drawings, the basement floor will be prepared with a 4" concrete slab over a 3" gravel layer. For accurate quantity takeoff, a part-to-whole approach was used, dividing the drawing into smaller sections.
For the 3" thick gravel layer, the quantity is calculated using the formula: Length x Width x Thickness, yielding 442.02 ft³.
For the 4" thick, 20 MPA (~3000 PSI) concrete slab, the same formula is applied to calculate the volume. The Concrete quantity on the slab on grade for 4” thick is 603.9 ft³ and for curing quantity refer Table 5 for detailed breakdown.
\end{onehalfspace}
\begin{table}[h]
\centering
\caption{Quantity of Slab on Grade}
\begin{tabular}{|l|l|l|l|l|}
\hline
\lightblueheading{Floor (ft)} & \lightblueheading{Length (ft)} & \lightblueheading{Width (ft)} & \lightblueheading{Thickness (ft)} & \lightblueheading{Volume (ft³)} \\ \hline
Basement & 43.25 & 39.9 & 0.33 & 517.7 \\ \hline
& 3.67 & 6.3 & 0.33 & 6.93 \\ \hline
& 8 & 1.64 & 0.33 & 3.94 \\ \hline
& 2.16 & 2.86 & 0.33 & 1.85 \\ \hline
& 19 & 12 & 0.33 & 68.4 \\ \hline
& 3.54 & 4.83 & 0.33 & 5.07 \\ \hline
\multicolumn{4}{|r|}{Total Quantity(ft³)} & 603.9 \\ \hline
\end{tabular}
\end{table}
\subsection{Walls (Suchita, Sahil)}
\subsubsection{Exterior Walls (Suchita)}
\begin{onehalfspace}
The basement wall assembly comprises a concrete foundation wall extending 4.13 feet in height, topped by a concrete block wall rising to a total height of 10 feet. The interior of the wall is finished with a stud wall lining. For quantity takeoff purposes, the walls are designated as North, South, West, and East.
\begin{table}[h]
\centering
\caption{Quantity for Exterior Wall - Basement Floor}
\begin{tabular}{|l|l|l|l|}
\hline
\lightblueheading{Wall} & \lightblueheading{L (Ft)} & \lightblueheading{H (Ft)} & \lightblueheading{Deduction} & \lightblueheading{Total Area (Sq.ft)} \\ \hline
South wall & 38.67 & 10 & 108.00 & 278.67 \\ \hline
West Wall & 40.52 & 10 & 0.00 & 405.21 \\ \hline
North Wall & 58.67 & 10 & 45.60 & 541.07 \\ \hline
East Wall & 20.35 & 10 & 0.00 & 203.54 \\ \hline
\end{tabular}
\end{table}
\end{onehalfspace}
\begin{onehalfspace}
For the concrete portion of the wall, formwork, concrete quantity and waterproofing for the interior and exterior were considered. For the stud wall portion, it consists of components such as top and bottom plates, wall studs, gypsum board sheathing, interior insulation, exterior rigid insulation, and headers and trimmers for wall openings.
\end{onehalfspace}
\begin{figure}[h]
\centering
\includegraphics[width=0.5\textwidth]{wall-arrangement.jpg}
\caption{Wall arrangement assumption and Main floor plan}
\end{figure}
\begin{onehalfspace}
\noindent Sample Calculation of Basement wall: South Wall
\begin{enumerate}
\item Concrete Wall - Assuming C25 Concrete Mix (1:1:2)
\begin{itemize}
\item \textbf{Formwork Calculations}
\begin{itemize}
\item Total surface area = Length of wall x Height of wall = 38.67 x 4.13 = 159.70 Sq. Ft.
\end{itemize}
\item \textbf{Quantity of Concrete = Length x Width x Height} = 38.67 x 0.83 x 4.13 = 132.55 Cubic Foot
\end{itemize}
\item Concrete Blockwork
\begin{itemize}
\item Number of Blocks = Surface area of wall / Surface area of one block = 278.67 / ((8/12) x (24/12)) = 208 Nos
\begin{itemize}
\item (Assuming solid 4''x 8'' x 24'' concrete block including mortar)
\end{itemize}
\end{itemize}
\item Waterproofing interior and exterior:
\begin{itemize}
\item Surface area of wall = Length x Height = 38.67*4.13 = 159.35 SF
\item For exterior waterproofing, a Type A Bitumen membrane is chosen to act as barrier protection for the structure. For interior waterproofing, a Type C membrane has been considered.
\end{itemize}
\item Studs Calculation (Assuming spacing=1.33’)
\begin{itemize}
\item No. of studs required = (Length of the wall / Spacing of studs) + 1 = (38.67 / 1.33) +1 = 30 Nos
\item Quantity in Board feet = No of studs x ((2 x 4) / 12) x 10 = 30 x ((2 x 4) / 12) x 10 = 200 BF
\item (Assuming 2''x4'' lumber, 2 extra studs per corner and 2 studs for each wall opening, Length of the stud is 10 ft)
\end{itemize}
\item Top and bottom plates
\begin{itemize}
\item Length in linear feet = Length of wall x 2 = 38.67 x 2 = 77.33 LF
\item Length in board feet = Length in LF x ((2 x 4) / 12) = 77.2 x (2 x 4) / 12) = 51.56 BF
\item (Assuming 2'' x 4'' lumber and since it is a non-loading bearing wall, one top and one bottom plates are considered.)
\end{itemize}
\item Gypsum Board
\begin{itemize}
\item Total SF of gypsum board required = Length of wall x Height = 38.67 x 10 = 386.67 SF
\item No of gypsum board required = (Length / 8’) + (Height / 4’) = (38.6 / 8) + (10 / 4) = 7 Nos
\item (Assuming a gypsum board of size 4’ x 8’)
\end{itemize}
\item Interior insulation
\begin{itemize}
\item Insulation quantity = (Length x Height) - (deducting openings for W08 two times) = (38.67 x 10) - (2 x (9 x 6)) = 278.67 SF
\item (Assuming 3.5’’ cavity insulation (R15))
\end{itemize}
\item Exterior Rigid Insulation
\begin{itemize}
\item Insulation quantity = (Length x Height) - (deducting openings for W08 two times) = (38.67 x 10) - (2 x (9 x 6)) = 278.67 SF
\item (Assuming 1’’ fiberglass insulation)
\end{itemize}
\item Headers (Quantity of Headers) = (Length of opening + 7’’ spacing) x 2 = (9+(7/12)) x 2 = 38 BF
\begin{itemize}
\item The south wall has two W09 windows. (Assuming 2'' x 12'' lumber and 7'' extra space for windows and two headers per opening.)
\end{itemize}
\item Sill = (Length of opening + 7’’) x 2 = (9+(7/12)) x 2 = 19.17 LF = 19.17 x (2x4/12) = 38.33 BF
\begin{itemize}
\item (Assuming 2''x 4'' lumber and 7'' extra space for windows and two sills per opening).
\end{itemize}
\item Trimmer (Length of Trimmers) = (Sill height + height of opening) x 2 = (2 + 6) x 2 = 17 LF = 16 x ((4 x 6) / 12) = 32 BF
\begin{itemize}
\item (Height of W08 is 6’ and Sill height is 2’)
\end{itemize}
\end{enumerate}
\end{onehalfspace}
\begin{onehalfspace}
\noindent Main Floor Exterior Wall
The first-floor exterior wall is a wooden stud wall 10’ height with exterior brick veneer cladding. The dimensions of exterior walls are calculated using Bluebeam software and required details of windows, doors etc. are taken from schedule provided in the drawings.
\end{onehalfspace}
\begin{table}[h]
\centering
\caption{Quantity for Exterior Wall - Main Floor}
\begin{tabular}{|l|l|l|l|l|}
\hline
\lightblueheading{Wall} & \lightblueheading{L (Ft)} & \lightblueheading{B (Ft)} & \lightblueheading{H (Ft)} & \lightblueheading{Deduction} & \lightblueheading{Total} \\ \hline
South wall & 38.60 & 0.83 & 10.00 & 108.00 & 278.04 \\ \hline
West Wall & 43.31 & 0.83 & 10.00 & 66.00 & 367.13 \\ \hline
North Wall & 42.71 & 0.83 & 10.00 & 92.00 & 335.08 \\ \hline
East Wall & 43.17 & 0.83 & 10.00 & 60.00 & 371.67 \\ \hline
\end{tabular}
\end{table}
\begin{onehalfspace}
\noindent Sample Calculation of First floor wall: South Wall
\begin{enumerate}
\item Studs Calculation (Assuming spacing=1.33’)
\begin{itemize}
\item No. of studs required = (Length of the wall / Spacing of studs) + 1 = (38.67 / 1.33) +1 = 30 Nos
\item Quantity in Board feet = No of studs x ((2 x 4) / 12) x 10 = 30 x ((2 x 4) / 12) x 10 = 200 BF
\item (Assuming 2''x4'' lumber, 2 extra studs per corner and 2 studs for each wall opening, Length of the stud is 10 ft)
\end{itemize}
\item Top and bottom plates
\begin{itemize}
\item Length in linear feet = Length of wall x 2 = 38.67 x 2 = 77.21 LF
\item Length in board feet = Length in LF x ((2 x 6) / 12) = 77.21 x (2 x 6) / 12 = 77.21 BF
\item (Assuming 2'' x 6'' lumber and since it is a non-loading bearing wall, one top and one bottom plates are considered.)
\end{itemize}
\item Gypsum Board
\begin{itemize}
\item Total SF of gypsum board required = Length of wall x Height = 38.67 x 10 = 386.67 SF
\item No of gypsum board required = (Length / 8’) + (Height / 4’) = (38.67 / 8) + (10 / 4) = 7 Nos
\item (Assuming a gypsum board of size 4’ x 8’)
\end{itemize}
\item Interior insulation
\begin{itemize}
\item Insulation quantity = (Length x Height) - (deducting openings for W08 2Nos.) = (38.67 x 10) - (108 Sq.ft.) = 278.04 SF
\item (Assuming 3.5’’ cavity insulation (R15))
\end{itemize}
\item Exterior Rigid Insulation
\begin{itemize}
\item Insulation quantity = (Length x Height) - (deducting openings for W08 2Nos.) = (38.67 x 10) - (108 Sq.ft.) = 278.04 SF
\item (Assuming 1’’ fiberglass insulation)
\end{itemize}
\item Headers (Quantity of Headers) = (Length of opening + 7’’ spacing) x 2 = (9+(7/12)) x 2 = 38 BF
\begin{itemize}
\item The south wall has two W08 windows. (Assuming 2'' x 12'' lumber and 7'' extra space for windows and two headers per opening.)
\end{itemize}
\item Sill = (Length of opening + 7’’) x 2 = (9+(7/12)) x 2 = 19.17 LF = 19.17 x (2x6/12) = 19.17 BF
\begin{itemize}
\item (Assuming 2''x 6'' lumber and 7'' extra space for windows and two sills per opening).
\end{itemize}
\item Trimmer (Length of Trimmers) = (Sill height + height of opening) x 2 = (2 + 6) x 2 = 16 LF = 16 x ((4 x 6) / 12) = 32 BF
\begin{itemize}
\item (Height of W08 is 6’ and Sill height is 2’)
\end{itemize}
\end{enumerate}
\end{onehalfspace}
\begin{figure}[h]
\centering
\includegraphics[width=0.5\textwidth]{ew-assumptions.jpg}
\caption{EW assumptions}
\end{figure}
\end{document}