To complete a job, A alone takes 2 more days than A and B together. B alone takes 18…
- User
To complete a job, A alone takes 2 more days than A and B together. B alone takes 18 more days than A and B together. Find the time taken if they work together.
- Assistant
Let's solve the problem step by step.
Given:
- A alone takes ( t + 2 ) days.
- B alone takes ( t + 18 ) days.
- A and B together take ( t ) days.
Assumption:
- The total work is considered as 1 job.
Work Rates:
- A's work rate: ( \frac{1}{t + 2} ) jobs per day.
- B's work rate: ( \frac{1}{t + 18} ) jobs per day.
- A and B's combined work rate: ( \frac{1}{t} ) jobs per day.
Setting Up the Equation: The combined work rate of A and B is the sum of their individual work rates. Therefore:
[ \frac{1}{t + 2} + \frac{1}{t + 18} = \frac{1}{t} ]
Solving the Equation:
- Find a common denominator to eliminate the fractions. Multiply every term by ( t(t + 2)(t + 18) ):