please correct: This report marks 28 weeks into the construction of H428. Current…
- User
please correct: This report marks 28 weeks into the construction of H428. Current progress shows slight delay on the baseline schedule which attributed by the remaining superstructure and secondary structure completion and thermal insulation hampered progress. Fabrication currently implementing the recovery plan and rending weekend overtime to focus on completion of key activities that has impact to other trades progress for painting and under water machineries. Piping systems now almost reach to completion with pressure testing being carried out. Major machineries such as Main Engine, Steering HPU, Deck Crane, and Anchor Winch are all installed, ready for final hook up and termination. Commissioning has also started on calibrating the integral and non-integral tanks. Plan approval finally wraps up where only few drawings with revision have submitted for restamping. AMSA accredited surveyor from MMD had first conducted structural survey which few minor comments found on welding. Next set to have schedule is the IEA which visit is expected on September 25-26 for the survey of electrical cabling installation. Majorities of equipment and materials have already been delivered, except for underwater machineries which poses risk on movement on target deliveries due to congestion at transhipment point in Singapore. Logistics coordination is tightened to monitor closely the shipment.
- Assistant
This report marks 28 weeks into the construction of H428. Current progress shows a slight delay from the baseline schedule, primarily attributed to the completion of the remaining superstructure and secondary structures, as well as thermal insulation issues that have hampered progress. The fabrication team is currently implementing a recovery plan and rendering weekend overtime to focus on the completion of key activities that impact the progress of other trades, particularly in relation to painting and underwater machinery.
The piping systems are nearing completion, with pressure testing currently underway. Major machinery, including the Main Engine, Steering HPU, Deck Crane, and Anchor Winch, has been installed and is ready for final hookups and terminations. Commissioning has also begun, specifically on calibrating the integral and non-integral tanks.
The plan approval process has finally concluded, with only a few drawings requiring revision and resubmission for restamping. An AMSA-accredited surveyor from MMD has conducted the initial structural survey, noting only a few minor comments regarding welding. The next scheduled visit is from the IEA, expected on September 25-26, to survey the electrical cabling installation.
- User
Please correct: The plan approval has finally wrapped up, with only a few revised drawings revision submitted for restamping. Initial structural survey of AMSA accredited surveyor from MMD has conducted, noting only a few minor comments regarding welding.
- Assistant
The plan approval has finally concluded, with only a few revised drawings submitted for restamping. The initial structural survey was conducted by an AMSA-accredited surveyor from MMD, who noted only a few minor comments regarding welding.
- User
Please improve like professional: The plan approval has finally concluded, with only a few revised drawings submitted for restamping. The initial structural survey was conducted by AMSA accredited surveyor from MMD who noted only a few minor comments regarding welding. The next scheduled visit from IEA, expected on September 25-26, to the survey of electrical cabling installation.
- Assistant
The plan approval process has successfully concluded, with only a few revised drawings submitted for restamping. An initial structural survey was conducted by an AMSA-accredited surveyor from MMD, who identified only a few minor comments regarding welding. The next scheduled visit from the IEA is expected on September 25-26 to conduct a survey of the electrical cabling installation.
- User
Please correct: Onsite survey has also begun with first visit was the AMSA accredited surveyor from MMD who noted only a few minor comments regarding welding. The next scheduled visit will be the IEA, expected to be onsite on September 25-26, to conduct a survey of electrical cabling installation.
- Assistant
Onsite surveys have also begun, with the first visit conducted by an AMSA-accredited surveyor from MMD, who noted only a few minor comments regarding welding. The next scheduled visit will be from the IEA, expected to be onsite on September 25-26 to conduct a survey of the electrical cabling installation.
- User
Please correct: This report marks 28 weeks into the construction of H428. Current progress shows a slight delay from the baseline schedule, primarily attributed to the completion of the remaining superstructure and secondary structure, as well as the progress of thermal insulation installation. The fabrication team is currently implementing the recovery plan and rending weekend overtime to focus on completion of key activities that impact the progress of other trades, particularly in relation to painting and underwater machineries. On the positive side, piping systems are nearing completion with pressure with testing currently underway. Major machineries including main engine, steering HPU, deck crane, and anchor winch has been installed, and are ready for final hookups and terminations. Commissioning has also begun, specifically on calibrating the integral and non-integral tanks.
- Assistant
This report marks the 28th week of construction for H428. Current progress indicates a slight delay from the baseline schedule, primarily due to the completion of the remaining superstructure and secondary structure, as well as the progress of thermal insulation installation. The fabrication team is currently implementing a recovery plan and working overtime on weekends to focus on the completion of key activities that impact the progress of other trades, particularly with respect to painting and underwater machinery.
On a positive note, the piping systems are nearing completion, with pressure testing currently underway. Major machinery, including the main engine, steering HPU, deck crane, and anchor winch, has been installed and is ready for final hookups and terminations. Commissioning has also commenced, specifically with the calibration of the integral and non-integral tanks.