Risk Category X.1 Risk Identification X.2 Risk Allocation X.3 Mitigation Plan
Availability of land, site risk, and asset risk The soil's structural integrity is inadequate for the implementation of the technologies involved in waste to energy projectThe soil's structural integrity refers to its ability to maintain its structure and stability under various conditions. In the context of a waste-to-energy project, the soil's structural integrity is crucial for several reasons.
Firstly, the waste-to-energy project involves the construction of heavy infrastructure, such as waste processing facilities, energy generation units, and ancillary structures. These structures exert significant weight and pressure on the soil, which can lead to compaction, subsidence, and other forms of soil deformation. If the soil lacks adequate structural integrity, it may not be able to withstand these loads, resulting in structural damage to the facilities and potential safety hazards.
Secondly, the waste-to-energy project may require the installation of underground utilities, such as pipelines, cables, and drainage systems. These utilities are essential for the efficient operation of the project and need to be securely anchored in stable soil. Soil with insufficient structural integrity may not provide adequate support for these utilities, leading to potential leaks, ruptures, or other malfunctions.
Therefore, addressing the soil's structural integrity is crucial for waste-to-energy projects. This can involve various measures such as soil compaction, reinforcement with geotechnical materials, installation of foundation systems, and implementation of erosion control measures. By ensuring the soil's structural integrity, the project can minimize risks associated with soil deformation, contamination, and utility failure, contributing to the safe and sustainable operation of the waste-to-energy facility. Project Company Before initiating the construction process, it is imperative to conduct a thorough assessment of the soil’s bearing capacity. Our team of engineers, who specialize in waste-to-energy initiatives, has already meticulously evaluated the results from six distinct drilling holes on the designated project land. Their expert analysis has affirmed the land’s adequacy for the intended development.
Prior to embarking on the construction process, a comprehensive assessment of the soil's bearing capacity is of paramount importance. This crucial step ensures the stability and longevity of the planned waste-to-energy facility. To this end, our team of highly skilled engineers, renowned for their expertise in waste management solutions, has meticulously evaluated the results obtained from five strategically placed drilling holes on the designated project land.
Utilizing advanced geotechnical techniques and state-of-the-art equipment, our engineers conducted thorough soil investigations. Each drilling hole provided valuable data on the soil's composition, density, moisture content, and underlying geological formations. The engineers carefully analyzed this data, considering factors such as soil type, grain size distribution, and groundwater conditions.
Through rigorous analysis, our team assessed the soil's ability to support the weight of the proposed waste-to-energy facility. They considered potential risks such as soil compaction, settlement, and liquefaction, which could jeopardize the structural integrity of the facility.
Their expert evaluation confirmed that the soil on the designated project land possesses adequate bearing capacity to withstand the weight and loads associated with the construction and operation of the waste-to-energy facility. This assessment provides a solid foundation for the successful implementation of the project and ensures the safety and reliability of the facility throughout its lifespan.
Land Availability land, site risk, and asset risk Construction work sites are limited by the restrictions imposed by the local community. Project Company · The cooperation of various parties is needed to carry out socialization and mobilization of heavy equipment to be carried out after an agreement is reached with the residents.
· The project land chosen is also large enough to accommodate storage of heavy equipment and construction materials, thus limiting the traffic and inconvenient for the local community.
Land availability, asset and site risk
Delays and increased costs due to the prolonged land acquisition process Project Company The government agrees with the location of the project land prior to the implementation process by taking into account the following matters:
•The Agency Requiring Land (Government) prepares a land planning study at the planning stage to identify land requirements, land status, spatial suitability, cost estimation, social and environmental impacts of land acquisition, and timeline for land acquisition implementation. The preparation of this study can be done in collaboration with the land agency to ensure ownership/control and status of land
•The government needs to determine the project location and ensure that all requirements have been met before applying for a Location Determination Permit
•The government needs to ensure the availability of land acquisition funds;
•The government needs to ensure that there is a team to carry out the land acquisition process;
•The government needs to ensure that the land acquisition process can proceed in accordance with the provisions of laws and regulations;
•The process of monitoring and evaluating the process of land acquisition
Land availability, asset and site risk Failure to acquire project land due to difficult land acquisition process Project Company •the status of project land have been already identified and deemed with no legal issues.
· implementation of project land acquisition procedures that are transparent and accountable.
•Intensive Coordination with all levels of government up to the RT level regarding the Waste to energy project which falls into the category as Priority Strategic National (PSN)
Land availability, asset and site risk Land status risks, e.g. dual land certificate ownership was discovered when the project was implemented Project Company •Carry out validation and settlement of land ownership status
• Support from related authorities (BPN, Population Service) is very important
•An announcement is made in the village after the inventory and identification process has been completed
Environmental risk Garbage Quantity; There is a potential for fluctuating waste quantities that affect feedstock inputs South Tangerang City The projected quantity of waste generation per day under various scenarios indicates that waste management infrastructure, such as bunkers or holding facilities, will have sufficient capacity to handle the anticipated waste volumes. The bunker or holding facility will serve as a buffer to accommodate any unexpected or significant fluctuations in waste generation. This buffer capacity will help ensure the continuous and sustainable operation of the waste management project. By anticipating and planning for potential variations in waste generation, the project can mitigate risks and maintain its long-term viability. The bunker or holding facility provides flexibility and adaptability, allowing the waste management system to respond effectively to changing conditions and unexpected events.
Environmental risk Garbage Composition; There is a potential for fluctuating waste composition so that it affects the feedstock input Project Company · The Proven design of the incinerator, which has successfully handled similar Municipal waste, is anticipated to exhibit flexibility in accommodating fluctuations in waste characteristics. This flexibility is crucial for effective waste management.
To ensure continuous and relative homogeneity of the MSW composition, regular sampling will be conducted. This sampling process plays a vital role in monitoring and maintaining the consistency of the waste stream. By collecting representative samples at predetermined intervals, the composition of the MSW can be analyzed. This analysis provides valuable insights into the types and proportions of materials present in the waste, allowing for adjustments to the incineration process as necessary.
The sampling frequency will be determined based on factors such as the volume and variability of the waste stream, as well as the desired level of accuracy and precision in the composition data. Sampling locations will be strategically selected to capture a representative cross-section of the MSW, ensuring that the samples reflect the overall characteristics of the waste.
The collected samples will undergo various analytical methods to determine their composition. These methods may include physical sorting, chemical analysis, and calorific value determination. The results of the analysis will be used to assess the homogeneity of the MSW and to identify any significant variations in its composition.
By conducting regular sampling and monitoring the MSW composition, the incinerator operator can make informed decisions regarding process adjustments. These adjustments may involve altering the operating parameters of the incinerator, such as temperature, residence time, and air flow rates, to optimize combustion efficiency and minimize emissions.
Overall, the combination of a proven incinerator design and regular sampling ensures efficient and environmentally sound waste management by maintaining a relatively homogeneous MSW composition and enabling appropriate process adjustments.
Environmental risk The risk of processing flue gas that does not meet standards due to the presence of PVC type waste during incineration Project Company Despite the potential presence of PVC in the waste, the percentage is relatively small, and its impact on the incineration process is marginal.
The flue gas treatment system is designed to handle exhaust gases containing this small amount of PVC during incineration and complies with the regulations set forth by the Minister of Environment and Forestry Regulation 70 of 2016.
Proven continuous emissions monitoring systems (CEMS) and associated fail-safe procedures are in place to ensure the regular monitoring of flue gas quality. Refer to Chapter XX of the document for more detailed information on these systems and procedures.
Environmental risk Emissions of exhaust gases (flue gas) from incinerator operations where emission quality standards are not met (especially emissions of dioxins, furans) Project Company •Monitor the performance of air pollution control equipment on a regular basis, especially for compliance with standards according to Minister of Environment and Forestry Regulation No. 70 year 2016
Environmental risk Processing of liquid waste that does not meet standards, especially due to the presence of heavy metals Project Company · Periodic checks need to be carried out and the wastewater treatment
· plant is equipped with a reliable and proven treatment process and equipment
Environmental risk Fly Ash is not well managed Project Company The Project company needs to ensure that Fly ash are processed and stabilized according to the SOP described in Amdal following regulation XXXX KLHK before it is taken to a sanitary landfill or sold to a third party
Environmental risk Bottom Ash is not well managed Project Company Utilization of Bottom Ash in Indonesia is still is in infancy, but the project company intends to manage Bottom Ash through a third party can be an example for BA processing in Indonesia: To be decided
Environmental risk Incineration treatment residues (FABA) transport pollutes the air Project Company · After our careful stabilization process, the FABA is far less volatile
· The transportation of FABA materials, even though they are no longer classified as B3 materials, will be carried out with great care
Environmental risk Impact of fly ash and bottom ash (FABA) handling: FABA is scattered during storage and transportation processes, causing environmental pollution Project Company Establishment of silos for the systematic storage of FABA, facilitating direct transfer to FABA truck containers.
Assurance of sufficient FABA storage capacity in advance of transportation requirements.
Verification that FABA transport vehicles are compliant with established standards, in alignment with the predetermined timetable.
Confirmation of binding agreements with accredited waste management entities, encompassing transporters, processors, and end-users
Environmental risk
Waste water from waste treatment technology pollutes surface water Project Company To ensure environmental compliance and maintain ecological integrity, systematic quality evaluations of wastewater prior to its discharge into the natural surroundings will be carried out.
Environmental risk The condition of waste transport vehicles that still use open trucks compared to compactor trucks so that waste/garbage water/leachate/leachate can be scattered contaminating the environment during the transportation process South Tangerang City It is advisable to augment the fleet of compactor trucks and adhere to established transportation Standard Operating Procedures (SOPs). This includes the implementation of protective measures such as securing waste with tarpaulins or nets, and retrofitting trucks with leachate collection systems to prevent spillage.
Environmental risk The efficacy of wastewater management is compromised by effluent properties that fail to align with established quality benchmarks. Additionally, conventional recycling technologies are not universally applicable to all wastewater, and there exists a misalignment between the production of wastewater and the timing of its subsequent utilization.
. Project Company •Monitor the performance of wastewater treatment equipment on a regular basis.
•Providing a pond/storage for collecting effluent from the wastewater treatment plant before it can be utilized.
•Utilization of wastewater effluent is not only returned to the process but for other uses, for example: washing garbage trucks, watering lanscape, flushing etc
•Utilization of some of the heat generated from the incinerator as part of the waste water treatment to evaporate the waste water to produce sludge/solids.
Social risk The location of the land is close to residential areas so that it will disturb local residents, especially for issues of congestion, garbage odors, noise, vehicle air pollution and surrounding road safety due to the large number of garbage trucks passing through the surrounding area. Project Company Outreach to the community regarding the benefits and waste processing technology to be used; Installing traffic signs, using night shifts to reduce congestion and not increase transportation during peak hours
Social risk Local residents protested because of the resulting environmental impact South Tangerang City There needs to be mediation with the local residents, prioritizing the transportation of waste from the area around the Waste to energy project and the possibility of various kinds of compensation
Social risk Waste management activities affect the emergence of employment opportunities and business opportunities Project Company · Providing various training related to WTE operations and prioritizing workers from the vicinity of the waste to Energy project.
· CSR, with theme related to waste to energy, can help and encourage projects from local people
Social risk Public health risk perception, with large numbers and large volumes that lead to TPA and social conflict Project Company Although, scientific publications all over Free periodic basic health checks for the community around the WTE
Design risk Long queues of trucks during unforeseen peak hours can occur Project Company Although the project location is adjacent to the existing TPA, there is a concern about potential traffic jams around the WTE area. To mitigate this issue, the project team is considering adjusting truck operating hours. By staggering the arrival and departure times of trucks, the project team hopes to reduce congestion and improve traffic flow in the surrounding area. This measure would also help to minimize the impact of the project on local residents and businesses.
Design risk Risk of garbage accumulation Project Company The large bunker capacity (7 days) will ensure to meet a number of waste for several days and WTE operations must be anticipated so that it can continue
Design risk Disruption of power supply to WTE Project Company Genset is provided with sufficient capacity
Design risk Disruption of the water supply from the provider Project Company Reservoirs are needed to hold a certain amount of water or find alternative water sources, including by utilizing the products of wastewater treatment
Construction risk The foundation of the building is not strong enough to support the weight of the structure Project Company The land preparation is key as well as bore drilling. The project will ensure a stable and strong enough land preparation for the Waste to energy facility
Construction risk Construction failures that lead to building damage or weak foundations Project Company The use of materials used for construction must be in accordance with quality standards and specifications, so that construction supervision is needed
Construction risk Liquid waste management pipeline leaks Project Company Checking the structure and making repairs if there are errors
Construction risk Dimensional errors of the wastewater treatment unit, Project Company Checking the structure and making repairs if there are errors
so the WWTP capacity is not in accordance with the initial plan
Construction risk Work accident during construction Project Company Applying K3 in a construction environment
Construction risk The construction quality of the contractor/service provider is poor Project Company Adequate EPC qualification and material check procedures:
To ensure the successful execution of a project, it is crucial to have adequate EPC (Engineering, Procurement, and Construction) qualification procedures in place. This involves a thorough evaluation of the EPC contractor's capabilities, experience, and track record. The qualification process should be conducted by both the project's tender committee (during the bidding stage) and the project company (during the execution stage).
In addition to EPC qualification, robust material check procedures are also essential. These procedures should ensure that all materials used in the project meet the required specifications and standards. This involves conducting regular inspections and tests on materials at various stages of the project, from procurement to installation.
Here are some key considerations for implementing effective EPC qualification and material check procedures:
- Pre-Qualification Criteria:
Establish clear pre-qualification criteria for EPC contractors. This may include factors such as financial stability, technical expertise, and experience in similar projects.
- Tender Evaluation:
During the tender evaluation process, the project company should thoroughly review the EPC contractor's qualification documents, including their technical proposal, project references, and financial statements.
- Site Visits and Audits:
Conduct site visits to the EPC contractor's previous projects to assess their construction practices and quality control measures. Regular audits should also be carried out during the execution of the project to ensure compliance with the agreed-upon standards.
- Material Testing and Inspection:
Implement a comprehensive material testing and inspection plan. This should include tests for material properties, chemical composition, and compliance with industry standards.
- Documentation and Reporting:
Maintain detailed records of all material checks and inspections. This documentation should include test results, inspection reports, and any non-conformances identified.
- Continuous Monitoring:
Establish a system for continuous monitoring of the EPC contractor's performance. This should include regular progress reports, site inspections, and communication with the project team.
By implementing robust EPC qualification and material check procedures, project companies can mitigate risks, ensure the quality of materials and construction, and ultimately achieve successful project outcomes.
Construction risk Increase in construction costs / cost overrun
Construction costs are the expenses incurred during the construction of a building or infrastructure project. These costs can include materials, labor, equipment, permits, and other associated expenses. When construction costs are higher than originally estimated, this is known as a cost overrun.
Project Company During the Detailed Engineering Design (DED) stage, a highly detailed Bill of Quantities (BOQ) calculation will be performed. This BOQ calculation will serve as a comprehensive assessment of all materials, equipment, and resources required for the successful execution of the project. The BOQ will encompass an extensive range of factors, including:
- Material Quantities: A precise estimation of the quantities of various materials needed for the project, such as steel, concrete, aggregates, and electrical components.
- Equipment Requirements: A detailed list of the equipment necessary for construction activities, including machinery, tools, and specialized equipment.
- Labor Resources: An evaluation of the number of skilled and unskilled workers required for different phases of the project, ensuring efficient manpower allocation.
- Subcontractor Involvement: An assessment of the scope of work to be outsourced to subcontractors, defining their responsibilities and deliverables.
- Contingency Planning: An allocation for unforeseen circumstances and unexpected expenses that may arise during construction.
- Environmental Considerations: An estimation of resources needed for environmental protection measures, such as soil erosion control and waste management.
- Quality Control Measures: An outline of the resources required for quality control and inspection activities, ensuring compliance with project specifications.
- Safety Protocols: An evaluation of the resources needed to implement safety measures and protocols, safeguarding workers and the public.
- Project Schedule: A detailed breakdown of resources required for each stage of the project, aligning with the overall construction schedule.
- Cost Estimation: A comprehensive cost estimate based on the BOQ calculations, providing an accurate projection of the project's financial requirements.
The BOQ calculations will be meticulously prepared by experienced engineers and quantity surveyors, utilizing specialized software and industry best practices. The resulting BOQ will serve as a valuable tool for project managers, contractors, and stakeholders, enabling informed decision-making, cost control, and effective resource allocation throughout the construction process.
Construction risk Delays in completing the construction of waste processing technology Project Company There is periodic monitoring of construction implementation to ensure that contractors adhere to the agreed-upon plans, specifications, and timelines. This monitoring is typically carried out by project managers, engineers, and other qualified professionals who inspect the construction site on a regular basis to assess the progress and quality of work. The purpose of this monitoring is to identify any deviations from the approved plans or any issues that could potentially affect the safety, functionality, or aesthetics of the project. By proactively identifying and addressing potential problems early on, this monitoring helps ensure that the project is completed according to the intended design and standards.
In addition to monitoring construction implementation, there is also the possibility of imposing fines on contractors who fail to meet their contractual obligations. This provision serves as an incentive for contractors to adhere to the agreed-upon terms and conditions, as they may be held financially accountable for any delays, defects, or non-compliance. The imposition of fines is typically determined based on the severity of the breach of contract and the impact it has on the project. This measure helps to protect the interests of project owners and stakeholders by ensuring that contractors are held responsible for their actions and are motivated to deliver high-quality work within the specified timeframe.
Construction risk Changes in the scope of work during construction Project Company There is an agreement on the scope of work before construction begins and the possibility of the scope of plus and minus in the agreement
Construction risk
Failed to maintain security and safety in the location
Project Company
The provision of adequate security personnel is essential for ensuring the safety and security of waste-to-energy (WTE) facilities. This includes both physical security measures, such as access control and surveillance, and community engagement initiatives to foster trust and cooperation between the facility and its neighbors.
● Physical security measures:
● Implement access control systems, such as gates, fences, and security checkpoints, to restrict unauthorized access to the facility.
● Install surveillance cameras and motion sensors to monitor activity around the facility and deter potential intruders.
● Regularly patrol the facility grounds to identify and address any security concerns.
● Community engagement initiatives:
● Establish a community liaison team to communicate with residents, businesses, and other stakeholders about the facility's operations and safety protocols.
● Host regular open houses and community meetings to provide opportunities for the public to learn about the facility and ask questions.
● Collaborate with local law enforcement and emergency response agencies to develop coordinated security plans.
Involving the community around the WTE facility in security efforts is crucial for several reasons:
● Community members can serve as additional eyes and ears, reporting any suspicious activity or potential security breaches to facility operators.
● A positive relationship between the facility and the community can help defuse tensions and address concerns related to safety and environmental impact.
● Community engagement can foster a sense of ownership and responsibility for the facility's security, encouraging residents to take an active role in protecting it.
By combining physical security measures with community engagement initiatives, WTE facilities can enhance their overall security posture and create a safer environment for both employees and the surrounding community.
Variation risk Provision of excess waste from 1100 tons per day in the early years and assuming an increase in calorific value so that processing below 1100 tons per day can pose a risk that it is not in accordance with the work agreement. Project Company · A Detailed and contractual signed cooperation agreement with South Tangerang City-project company, will ensure that both parties will respect and honor their obligations.
· the storage facility (bunker) can accommodate a relative excess but on a very short term only
Variation risk There is a potential discrepancy between the actual mass balance results and vendor compatibility analysis. Project Company One crucial aspect is guaranteeing the competence and reliability of the vendors involved in the waste management process. This includes thoroughly assessing and selecting vendors based on their expertise, track record, and adherence to industry standards. By partnering with competent vendors, WTE facilities can ensure the efficient and environmentally sound handling of waste, minimizing the risk of operational issues and negative impacts on the environment.
Variation risk Potential discrepancy between mass balance and actual results Project Company Make a back up plan if the mass balance is not as planned
Operation risk Due to the accumulation of garbage in bunkers, the waste at the bottom hardens, creating a crust-like consistency. Project Company Adequate and exhaustive training for crane operators in bunkers is essential to ensure the proper handling of waste in the bunker. This training should cover various aspects to ensure operators are well-equipped to handle waste safely and efficiently.
- General Safety Protocols: Training should start with general safety protocols, emphasizing the importance of following safety guidelines and regulations to prevent accidents and injuries. This includes proper attire, personal protective equipment (PPE), and adherence to safety procedures.
- Crane Operation and Maintenance: Operators should receive comprehensive training on the operation and maintenance of the crane used in the bunker. This includes familiarizing themselves with the controls, monitoring systems, and emergency procedures. Proper maintenance techniques should be taught to ensure the crane is in optimal condition and functioning correctly.
- Waste Handling Techniques: The training should cover various waste handling techniques, including the proper methods of lifting, moving, and stacking different types of waste. Operators should learn techniques to minimize spillage and dust generation, ensuring a clean and safe work environment.
- Environmental Regulations: Training should include an overview of environmental regulations and guidelines related to waste handling in bunkers. Operators should understand the importance of following these regulations to prevent pollution and protect the environment.
- Communication and Teamwork: Effective communication and teamwork among crane operators and other personnel are crucial for safe and efficient waste handling. Training should emphasize the importance of clear communication, hand signals, and coordination to avoid accidents and ensure smooth operations.
- Emergency Response: Operators should receive training on emergency response procedures in case of accidents or equipment failures. This includes knowledge of emergency shutdown protocols, evacuation routes, and the use of safety equipment.
- Regular Refresher Training: Regular refresher training programs should be conducted to reinforce the knowledge and skills acquired during initial training. This ensures that operators stay updated on the latest safety regulations and best practices for waste handling in bunkers.
By providing adequate and exhaustive training, crane operators in bunkers will be equipped with the necessary knowledge and skills to handle waste safely, efficiently, and in compliance with environmental regulations. This training will help minimize accidents, protect the environment, and ensure the smooth operation of the bunker.
Operation risk The possible disregard for Standard Operating Procedures (SOPs) and the lack of Personal Protective Equipment (PPE) usage among workers can significantly heighten the likelihood of workplace accidents. Project Company Expanding Socialization Media on the Importance of Fulfilling K3 SOPs and the Obligation to Use PPE in the WTE Environment
With the rapid growth of the waste-to-energy (WTE) industry, there has been an increasing focus on the importance of fulfilling K3 Standard Operating Procedures (SOPs) and the obligation to use Personal Protective Equipment (PPE) in the WTE environment.
K3 SOPs
K3 SOPs are a set of guidelines that outline the safe operating procedures for WTE facilities. These SOPs are designed to protect workers from the potential hazards associated with WTE operations, such as exposure to toxic fumes, fires, and explosions.
Some of the key K3 SOPs include:
● Proper handling and storage of waste materials
● Regular inspection and maintenance of WTE equipment
● Emergency preparedness and response plans
● Training for workers on safe work practices
PPE
PPE is a critical component of worker protection in the WTE environment. PPE is designed to protect workers from exposure to hazardous substances and conditions, such as:
● Respiratory protection from toxic fumes
● Eye protection from flying debris
● Hand protection from sharp objects
● Body protection from heat and flames
Socialization Media
Socialization media can be a powerful tool for expanding awareness of the importance of fulfilling K3 SOPs and the obligation to use PPE in the WTE environment. By sharing information about the potential hazards of WTE operations and the benefits of safe work practices, socialization media can help to create a culture of safety in the WTE industry.
Some of the ways that socialization media can be used to expand the socialization of K3 SOPs and PPE in the WTE environment include:
● Sharing articles, videos, and infographics about WTE safety
● Hosting online forums and discussion groups for WTE workers
● Conducting live chats with WTE safety experts
● Developing social media campaigns to promote WTE safety
Operation risk Operational problems due to construction results that are not optimal (defect) Project Company Periodic monitoring of WTE operations and availability of adequate SOPs
Operation risk An increase in operational costs that is not followed by an increase in waste processing results Project Company Efficiency of WTE operational cost components and WTE operational arrangements in order to produce maximum product
Operation risk The output quantity of waste processing results is not according to plan Project Company WTE operational settings, including the quantity and quality of feed to be processed
Operation risk human errors affect the performance of WTE processing and can cause material losses Project Company Implementation of clear and detailed work procedures as well as conducting briefings:
- Establishing Work Procedures:
● Develop comprehensive work instructions that outline the steps required to complete specific tasks.
● Ensure procedures are easy to understand, follow, and consistently applied.
● Review and update procedures regularly to reflect changes in processes or regulations.
- Communication and Training:
● Conduct regular briefings to communicate work procedures, expectations, and safety protocols to all team members.
● Encourage open dialogue and questions during briefings to ensure clarity and understanding.
● Provide training sessions to team members to ensure they are proficient in following work procedures and handling equipment safely.
- Documentation and Monitoring:
● Maintain detailed records of work procedures, including revisions and updates.
● Implement a system to track and monitor adherence to work procedures.
● Regularly review and evaluate the effectiveness of work procedures and make improvements as necessary.
- Supervision and Feedback:
● Provide ongoing supervision to ensure work procedures are being followed correctly.
● Offer constructive feedback to team members to help them improve their adherence to work procedures.
● Recognize and reward team members who consistently follow work procedures and demonstrate a commitment to safety.
- Continuous Improvement:
● Regularly review and evaluate work procedures to identify opportunities for improvement.
● Encourage team members to provide feedback and suggestions on ways to enhance work procedures.
● Implement improvements to work procedures based on feedback and evaluation results.
Operation risk
Delivery Time does not correspond
Project Company ● Setting up a receiving hall of sufficient size to unload efficiently trucks with or without hydraulics:
This involves creating a designated area within the waste management facility where trucks can easily unload their contents. The hall should be spacious enough to accommodate multiple trucks at once, allowing for efficient unloading. It should also be equipped with the necessary infrastructure, such as ramps, dock levelers, and forklifts, to facilitate the unloading process. Additionally, the hall should be designed to minimize the risk of accidents and injuries to workers. (CF chapter XX for more details)
● Setting up a waste bunker with a minimum capacity of 7 days of operation:
This involves constructing a large storage container or bunker to temporarily hold waste before it is processed or disposed of. The bunker should have a capacity that can accommodate at least seven days' worth of waste, ensuring that there is sufficient storage space even during periods of high waste generation. The bunker should be designed to prevent the escape of odors, leachate, and pests, and should be equipped with a proper drainage system to manage any liquids that may accumulate. (CF chapter XX for more details)
● Setting up a receiving hall of sufficient size to maneuver trucks simultaneously:
This involves creating a receiving area within the waste management facility that is large enough to allow multiple trucks to maneuver and unload their contents simultaneously. The hall should be designed to minimize congestion and delays, and should provide adequate space for trucks to enter, exit, and turn around. It should also be equipped with clear signage and traffic control measures to ensure the safety of workers and drivers. (CF chapter XX for more details)
Operation risk
Garbage trucks don't come as scheduled, or come at the same time
Project Company •Setting up a waste bunker with a minimum capacity of 7 days of operation
•Setting up a parking/waiting area before the trucks enter the receiving hall
Coordinate with the environmental Agency (DLH) in order to optimize the traffic of the garbage truck
Operation risk
Incompatibility of characteristics/ quality of Waste
Project Company
Sampling:
○ Sampling has been carried out prior to and as well as post-tender to ensure relative continuity in the results. This involves taking representative samples of the waste at different stages of the process to analyze its characteristics, such as moisture content, ash content, and calorific value. This information is crucial for optimizing the furnace operations and ensuring compliance with environmental regulations.
Setting up waste bunkers with fast leachate disposal facilities:
○ To manage leachate effectively, dedicated waste bunkers with fast leachate disposal facilities have been set up. Leachate is the liquid that drains from waste and can contain harmful pollutants. The fast leachate disposal facilities ensure that the leachate is collected and treated promptly, preventing contamination of soil and groundwater.
Setting up a waste bunker with a minimum capacity of 7 days of operation:
○ A waste bunker with a minimum capacity of 7 days of operation has been established. This allows for the mixing of waste with different characteristics, ensuring a more uniform feedstock for the furnace. This helps stabilize the furnace operations and reduce the risk of unexpected variations in the waste's properties.
Preparing crane operators to identify and mix wet and dry waste:
○ Crane operators have been trained to identify and mix wet and dry waste effectively. This is crucial because the moisture content of the waste can impact the furnace's performance and efficiency. By mixing wet and dry waste, the overall moisture content of the feedstock can be controlled, ensuring optimal combustion conditions.
Demand risk Project Structure - BLPS Payment Scheme Project Company There are detailed cooperation agreements, especially to anticipate late payments
Market financial risk There are costs / benefits that were not identified during the study process South Tangerang City Conduct discussions with all stakeholders to ensure costs and benefits are covered
Market financial risk The increase in inflation is higher than the inflation projected in the financial model Project Company Rigorous simulation and sensitivity analysis has been carried out in the financial model
Market financial risk Late payment of BLPS (Tipping Fee) by South Tangerang City Project Company •Take precautionary measures by clarifying the clauses in the agreement with the city of South Tangerang city
•An unanticipated expense budget is required
Market financial risk Failure to reach financial close Project Company In order to ensure a successful financial outcome, various simulation calculations will be conducted as a precautionary measure. These calculations will be based on the requirements that have been identified and will help to mitigate any potential risks. Additionally, a financial advisor will be hired to oversee the financial close process. The financial advisor will work to secure the best possible conditions for the close, ensuring that all financial matters are handled efficiently and effectively. This combination of simulation calculations and financial advisory services will help to ensure a smooth and successful financial close.
Here are some additional details about the precautionary measures and financial advisor services:
● Simulation Calculations:
○ The simulation calculations will be conducted using a variety of financial models and tools.
○ The models will be customized to reflect the specific requirements of the project.
○ The calculations will be used to assess the potential impact of different financial scenarios.
○ The results of the calculations will be used to make informed decisions about the financial close process.
● Financial Advisor Services:
○ The financial advisor will be responsible for overseeing the financial close process.
○ The advisor will work with the project team to develop a financial close plan.
○ The advisor will negotiate with lenders and other financial institutions to secure the best possible terms for the close.
○ The advisor will also provide ongoing support and advice throughout the financial close process.
By taking these precautionary measures and hiring a financial advisor, the project team can increase the chances of a successful financial close.
Market financial risk The risk of foreign exchange rates that will affect the purchase price of imported components Project Company A contingency expense budget is implemented in the financial model
Market financial risk Inflation rate risk Project Company Sensitivity analysis has been calculated in the financial model to account for this
Market financial risk Loan interest risk Project Company Sensitivity analysis has been calculated in the financial model to account for this
Financial Advisor will be hired to ensure the best conditions for loan
Market financial risk Risk of changes in tax regulations Project Company A contingency expense budget is implemented to account
Market financial risk Increased CAPEX fee / cost of capital Project Company A contingency expense budget is required to mitigate contingencies
Strategic partnership risk Delays in granting permits and project approval from the relevant government South Tangerang City · Identify various activities that can be carried out until the permit is issued
· Others permits can be carried out in parallel
· carry out more intensive coordination to accelerate the issuance of permits
Strategic partnership risk RTRW that is not in accordance with the development of waste processing technology South Tangerang City Propose a revised RTRW that accommodates the technology to be used
Strategic partnership risk Execution of EPC Contractor Tenders in Development for Public Interest Project Company The Project Company must carry out the selection of the EPC contractor in a transparent, accountable manner and in accordance with the applicable laws and regulations.
Regulations regarding construction services mandate that EPC contractors on construction for the public interest must be carried out by tender, selection or electronic catalogue.
However, if the nature of the work has high complexity, then the selection of the EPC contractor is carried out by way of tender through prequalification
Technological risk The selected technology is being applied for the first time in Indonesia Project Company The adoption of Moving Grate Incinerator (MGI) technology represents a significant advancement in the field of Municipal waste management. Through a rigorous international benchmarking process, MGI technology has been identified as the most appropriate solution for processing Municipal waste due to its ability to deliver superior environmental performance and operational efficiency.
The selection of MGI technology is based on extensive research and analysis of various waste treatment options. International benchmarking studies have consistently demonstrated the superiority of MGI technology in terms of environmental performance, cost-effectiveness, and reliability. MGI incinerators have been successfully implemented in numerous countries worldwide, providing tangible evidence of their ability to meet stringent environmental standards and deliver sustainable waste management solutions.
By adopting MGI technology, municipalities and waste management authorities can significantly reduce their environmental footprint, contribute to a circular economy, and enhance the overall quality of life for their communities. The implementation of MGI technology represents a bold step towards achieving a more sustainable future and addressing the challenges posed by Municipal waste management.
Force majeure risk Force Majeure Event Project Company The project company will apply to insurance to cover losses incurred due to force majeure.
Related to war, disease outbreaks, rebellion, embargoes, riots, fires, sabotage, general strikes and matters officially declared by the authorities as force majeure.
Force majeure risk Natural disasters Project Company • The DED will account for as much as possible for potential natural disasters
• Extensive study is also conducted prior for the selection of the land site which will offer the least amount of risk for natural disasters
Force majeure risk Extreme weather Project Company Accommodating extreme weather at every stage of a project's lifecycle—preparation, build, and operation—is crucial for safeguarding infrastructure and ensuring the safety and well-being of communities. Here's how we can elaborate and expand on this input text:
- Preparation Stage:
○ Conduct thorough risk assessments to identify potential vulnerabilities to extreme weather events such as floods, hurricanes, heat waves, and wildfires.
○ Develop comprehensive plans that outline strategies for mitigating the impact of extreme weather, including emergency response procedures and evacuation routes.
○ Invest in early warning systems and monitoring technologies to provide timely and accurate information about impending weather events.
- Build Stage:
○ Employ resilient construction materials and techniques that can withstand extreme weather conditions.
○ Elevate structures above floodplains and design foundations to resist high winds and seismic activity.
○ Incorporate green infrastructure solutions such as bioswales, rain gardens, and permeable pavements to manage stormwater runoff and reduce the risk of flooding.
- Operation Stage:
○ Continuously monitor weather forecasts and stay informed about potential weather hazards.
○ Implement preventive maintenance programs to ensure that infrastructure is in good condition and able to withstand extreme weather events.
○ Develop emergency response protocols and train personnel on how to respond to and mitigate the impact of extreme weather events.
○ Conduct regular drills and exercises to test emergency response plans and ensure they are effective.
- Collaborative Approach:
○ Foster collaboration among stakeholders, including government agencies, private sector organizations, and communities, to develop and implement comprehensive strategies for accommodating extreme weather.
○ Share best practices and lessons learned from past experiences to inform decision-making and enhance resilience.
- Continuous Improvement:
○ Regularly review and update plans and strategies based on new information, emerging technologies, and changing weather patterns.
○ Invest in research and development to enhance our understanding of extreme weather and develop innovative solutions to mitigate its impact.
By taking a proactive and comprehensive approach to accommodating extreme weather at every stage of a project's lifecycle, we can build resilient infrastructure that can withstand the challenges of a changing climate and protect future generations.
Material adverse government action risk Political force majeure Project Company There are detailed cooperation agreements, especially in anticipation of changes in policy directions politically
Due to the nature of this project, priority strategic national (PSN) , guarantee, which is a political guarantee.
Material adverse government action risk DPRD approval for Project Implementation (including BLPS amount Project Company ● Strengthening communication with representatives from the DPRD:
○ Initiate regular meetings with DPRD members to discuss the project and address any concerns they may have.
○ Provide clear and concise information about the project, including its benefits and potential impact on the community.
○ Respond promptly to any inquiries or requests for information from DPRD members.
○ Build relationships with DPRD members based on trust and mutual respect.
● Building a good communication strategy:
○ Develop a comprehensive communication plan that outlines the key messages, target audiences, and channels of communication for the project.
○ Use a variety of communication channels to reach different audiences, such as press releases, social media, public meetings, and door-to-door canvassing.
○ Tailor the communication message to each audience, taking into account their interests and concerns.
○ Monitor the effectiveness of the communication strategy and make adjustments as needed.
● If possible, a guarantee is requested from the Ministry of Finance to increase the bankability level of the project:
○ Reach out to the Ministry of Finance to discuss the project and request a guarantee.
○ Provide the Ministry of Finance with detailed information about the project, including its financial projections and risk assessment.
○ Work with the Ministry of Finance to develop a guarantee agreement that is acceptable to both parties.
○ Use the guarantee from the Ministry of Finance to attract financing from banks and other lenders.
DPRD approval for the implementation of the WTE project is one of the most important to maintain the long term sustainability. Support from the legislature is needed because it is closely related to the use of the APBD as one of the main revenue for this Project.The absence of legislative support will cause the WTE Project to become unbankable .
Material adverse government action risk Assignment of the Minister of Energy and Mineral Resources to PLN Project Company •As soon as the technical requirements are met, South Tangerang city submits a request to the Minister of Energy and Mineral Resources regarding the assignment to PLN to purchase electricity.
The assignment of the Minister of Energy and Mineral Resources to PLN will be carried out after a request from the South Tangerang City. If the application is not submitted immediately, it may delay the assignment process and the PJBL draft cannot be submitted for review. •Strengthening communication with PLN so that during the assignment process, commercial issues can be discussed earlier and the best solution is found between the parties.
Material adverse government action risk Master Agreement is not Bankable Project Company Ensuring that the master agreement accommodates the interests of the financier, by hiring a Financial adviser early so that the master agreement can become bankable
Considering that most of the investment scheme in the WTE Project will be funded by lenders, the provisions of the master agreement must take into account the interests of the loan in order to provide comfort for the financier in providing loans.
An unbankable master agreement will make it difficult for the South WTE Project to find other financing alternatives.
Material adverse government action risk Central Government Guarantee South Tangerang City •Strengthening communication with the Ministry of Finance to ensure the Minister of Finance's approval of central government guarantees.
•Ensure that the provisions in the project agreement (master agreement, cooperation agreement and PPA) do not conflict with each other.
Obtaining guarantees from the central government will be the main requirement for the financier to be able to provide loans for the implementation of the South WTE Project. Obtaining guarantees from the central government is subject to the approval of the Minister of Finance.
The lack of approval from the Minister of Finance will result in the South WTE Project not being guaranteed so that it can have an impact on the project's bankability.
In addition, in connection with the risk of DPRD approval, there is a need for DPRD approval for a debt settlement agreement. DPRD approval will be a requirement for the signing of a debt settlement agreement between South Tangerang City and the Ministry of Finance/Infrastructure Guarantee Business Entity
Regulatory change risk Changes in local government institutional regulations South Tangerang City Always coordinate with related agencies so that the existence of the WTE can always be maintained
Regulatory change risk New local regulations do not support the development of waste processing technology Project Company Propose various revisions of regional regulations to support the existence of WTE facilities
Regulatory change risk Changes to Discriminatory and Special Regulations Issuance, application or enforcement of a regulation, policy or legal requirement that is discriminatory against this WTE Project or the Project Company or of a special nature such as changes to regulations in the waste/PLTSa sector which require additional investment. Project Company •Local Government must actively communicate with government stakeholders to anticipate regulatory changes to minimize disruption to the project.
•If possible, a guarantee is requested from the Ministry of Finance to increase the bankability level of the project.
Early termination risk The potential for failure of WTE planning due to the large cost of CAPEX/OPEX Project Company Conduct mutually beneficial negotiations with various parties
Handover condition risk Risk of damage to project assets/land during the life of the Cooperation/partnership and risk of project assets/land not being in the condition required by contract at the time of submission to the Signatory Authority South Tangerang City There are details of the cooperation agreement, especially regarding the asset acceptance clause
WTE performance risk The decrease in electricity production due to a decrease in the calorific value of waste or the design calorific value is not achieved Project Company Checking the calorific value is often carried out and pre-processing is carried out to stabilize the calorific value
WTE performance risk The composition of the waste does not match the design, such as the amount of incombustible material Project Company Perform regular waste analysis to ensure relative continuous waste composition.
WTE performance risk There is a decrease in environmental performance in the form of exceeding the Emission Quality Standard due to damage equipment Project Company Carry out routine maintenance according to SOP and choose a qualified
third partner
WTE performance risk There has been a decline in environmental performance in the form of exceeding the Emission Quality Standard due to a shortage of water supply Project Company Carry out sufficient water storage for emergency needs
WTE performance risk Decreased waste heat boiler efficiency due to scaling or other causes Project Company Perform boiler feed water treatment to meet the required standards
WTE performance risk Overhaul time that exceeds the planning time so that it affects electricity production Project Company Carry out inspection and maintenance according to SOP with reliable personnel
WTE performance risk The poor quality of maintenance/overhaul work results in frequent equipment breakdowns Project Company Routine Maintenance According to SOP:
○ Regularly inspect and maintain equipment per Standard Operating Procedures (SOP) to ensure optimal performance and prevent breakdowns.
○ Monitor equipment condition, perform preventive maintenance tasks like cleaning, lubricating, and adjusting components.
○ Identify potential issues early on and address them promptly to avoid more significant problems.
○ Keep detailed records of maintenance activities for audit purposes.
The detailed Operation and maintenance is available in chapter VII
Interface risk Substantial rework related to differences in service standards / methods used Project Company Standard agreement/method to be applied by the parties as early as possible and set forth in the official contract document
Can you rewrite in a clear and comprehensive way, the document above, adding the level of risk for each point and emphasizing on the mitigation point . Please provide as well an brief introduction and clonclusion for each . the tone will very professional.