correct the grammar: This is to report a leak concern similar to that of 16A-WW, a leak…
- User
correct the grammar: This is to report a leak concern similar to that of 16A-WW, a leak that is possibly coming from the storm drain that is not accessible without opening a hole in the shower wall of the common CR shower.
Recent reported leak concerned with the following units:
- 6A-WW
- 9A-WW
- 17A-WW
May we know when can we proceed with our initial plan of tracing the source of the leak that we are going to start at 16A-WW?
- Assistant
This is to report a leak concern similar to that of 16A-WW, possibly originating from the storm drain, which is not accessible without opening a hole in the shower wall of the common CR shower.
Recently reported leak concerns involve the following units:
- 6A-WW
- 9A-WW
- 17A-WW
Could you please let us know when we can proceed with our initial plan to trace the source of the leak, starting at 16A-WW?
- User
correct the grammar: • A leak was reported in unit 7T-EW’s bathroom, upon Flood testing of unit 8T-EW, it was observed in unit 7T-EW that the leak came from the defective pipe sleeves’ water proofing of shower area floor drain, dry area floor drain and water closet.
- Assistant
A leak was reported in the bathroom of unit 7T-EW. Upon conducting a flood test in unit 8T-EW, it was observed in unit 7T-EW that the leak originated from the defective waterproofing of the pipe sleeves in the shower area floor drain, dry area floor drain, and water closet.
- User
correct the the grammar: Apology for the late response, allow me to reply for the team, as the result of the flood test that was conducted las time, we are now requesting for a repair works quote from our accredited contractor to have this raised and have the budget approved by the management. We are looking at around 4-5 working days of repair once the Purchase order is approved.
Our Duty Manager will contact you once the PO is released. Any further concern, you may contact us to the provided number below.
- Assistant
Apologies for the late response. Allow me to reply on behalf of the team. As a result of the flood test conducted last time, we are now requesting a repair work quote from our accredited contractor to present it to management for budget approval. We anticipate that the repair will take around 4-5 working days once the purchase order is approved.
Our Duty Manager will contact you once the purchase order is released. If you have any further concerns, please contact us using the number provided below.
- User
correct the grammar: The installation of the cabinet on the bedroom is noted and approved. You may apply it the portal for work permit. Kindly send someone on the Engineering office on the day of the works to apply Impairment Permit.
- Assistant
The installation of the cabinet in the bedroom is noted and approved. You may apply for the work permit through the portal. Please send someone to the Engineering office on the day of the work to apply for the Impairment Permit.