MORE’S PROJECT 07/26/2024
- TREATMENT PROCESS
BASIC STEPS OF THE PROCESS
PRE-TREATMENT
Balancing Tank/Lift Pump Station: The wastewater will then be collected in the balancing/homogenization tank. The volume of the tank (with a capacity of 35-40 m³) will allow for the regulation of the wastewater flow into the next stage of biological treatment, which will be conducted via a pumping system consisting of a pair of pumps.
BIOLOGICAL TREATMENT
The pre-treated wastewater is directed to the prefabricated biological treatment unit, which is designed to ensure the removal of organic pollutants present in the wastewater, thus achieving the required quality levels in the clarified effluent. Initially, the wastewater passes through the pre-settling section and is directed to the oxidation stage, where the oxidation of carbonaceous compounds is achieved through the action of aerobic bacteria and the availability of oxygen. An aeration/mixing system ensures the adequate supply of oxygen for the complete mixing of the tank's contents with the incoming wastewater.
Specially designed "screens" installed at the exit of the oxidation section ensure that the quantities of packing material (biomedia) are retained within the reactor and are not transferred to the next stage of treatment.
After the oxidation section, the wastewater is directed to the nitrification stage. Here, the mixing of the tank's contents is achieved with the supply of air, which is primarily used to assist in the oxidation of nitrogenous compounds. The specially designed aeration system ensures the complete mixing of the tank's contents, which are supplemented with plastic packing material (biomedia), as well as the high efficiency of oxygen transfer for the oxidation process. The mixture of treated liquid and excess sludge, free of the packing material (biomedia) that is trapped in the "sieve" at the exit of the nitrification section, flows into the final clarifier of the settling tank.
The clarified effluent is separated from the activated sludge in the clarifier. It is then directed for storage and use for watering ornamental plants in a tank with a capacity of at least 40 m³. At the effluent exit from the clarifier, a chlorine solution will be dosed via the dosing system installed in the machinery room to achieve disinfection.