Yard: Removal of job with event, to avoid delay and unnecessary overload to DB at…
- User
Yard:
Removal of job with event, to avoid delay and unnecessary overload to DB at transit creation.
create a new task in the middle of the workflow, modify the task destination in the middle of the workflow (required modification below):
-Removed unnecessary communication for handling request between yard and yms at task execution.
-Revisited task creation factory, to allow for easier and more clear creation methods.
-Added possibility to cancel the process of queueing to a location, in case of a transit forced out, or changed location
-Added a process to dequeue from multiple locations
Added the possibility for internal vehicles to queue to dock, and wait for a free slot:
-Generalization of the queueing system
-Allowed internal vehicle to use tasks before used only for transit, thanks to a generalization of the hierarchy this allows for utilizing the existing functions of lock unlock and queue already used for the other tasks
can you rewrite a little bit, better but not longer
- Assistant
Yard:
-
Removed the job-with-event mechanism to avoid delays and unnecessary database overload during transit creation.
-
Created a new task in the middle of the workflow and modified the task destination accordingly (modifications below):
-
Eliminated unnecessary communication between Yard and YMS during task execution.
-
Refactored the task creation factory for easier and clearer creation methods.
-
Added the ability to cancel the queuing process to a location, in case a transit is forced out or the location changes.
-
Implemented a process to dequeue from multiple locations.
-
-
Enabled internal vehicles to queue at docks and wait for a free slot:
-
Generalized the queuing system.
-
Allowed internal vehicles to use tasks previously reserved for transit. Through hierarchy generalization, this utilizes existing functions like lock, unlock, and queue already used in other tasks.
-
-