"22.5.2 Cable Bundle Tests Cable bundle testing is a technique where transients are…
- User
"22.5.2 Cable Bundle Tests Cable bundle testing is a technique where transients are applied by cable induction or ground injection. These methods are used to verify that aircraft equipment can withstand the internal electromagnetic effects produced by the external lightning environment without experiencing functional upset or component damage. In either method, the test must be performed on fully configured and functioning equipment complete with interconnecting cable bundles and interface loads. This test requirement is satisfied by applying the specified waveforms and limits to interconnecting cable bundle(s) individually or simultaneously. a. All wires in a bundle from a single connector shall be tested together in order to claim a particular category or the waveform set designation must be Z. The only exception is power lines. If a power line is routed separately from the bundle then it has to be tested separately., In this case the core wire current need not exceed the corresponding pin test short circuit current level as presented in Table 22-2. The “corresponding pin test short circuit current level” shall be the same as the cable bundle test level used. For waveforms 1 and 2 use the waveform 4/1 short circuit current value. Example: For category A2J3L3 the waveform 1 short circuit current is 60 amps on the core wire (not 25 amps). If bundles are segregated based on where the wires are routed and tested to different levels, the designation must be Z. b. For the purposes of multiple stroke and multiple burst testing, the effect of random spacing is achieved through the timing of the application of the individual pulses and bursts in the sets of transients. See Figure 22-7 and Figure 22-8. c. Normally cable bundle tests are done with all shields that are present in the cable bundle connected as it is installed in the aircraft installation. If the shields off test method is used, the category designator shall be Z for the cable bundle test waveform set. The test level designator shall reflect the actual level injected on the core wires. 22-12 2010 RTCA, Inc. d. The cable bundle single stroke test may be combined with the multiple stroke test. In this case the test level of the first transient of the multiple stroke test application is replaced with the single stroke test level provided in Table 22-3. e. For cable bundle tests, waveform 3 is applied at 1.0 MHz ( 20%) and 10 MHz ( 20%). It is not allowed to test both polarities of Waveform 3 using one polarity setting. The waveform must be applied with a positive first half-cycle and then reversed for a negative first half-cycle. f. Waveform 1 may be applied by using either the test method in paragraph 22.5.2.1 (Cable Induction Tests) or paragraph 22.5.2.2 (Ground Injection Tests). g. Under each waveform, VT represents the test voltage level in Volts, and IT represents the test current level in Amperes. VL (Volts) and IL (Amperes) represent limits intended to prevent over-stressing the EUT beyond requirements. A test is always acceptable if the test level is reached before the limit level. The following criteria applies when the limit level is reached prior to the test level: h. Waveforms 2, 3 and 4 are defined as voltage waveforms. When a test voltage level (VT) is specified as Waveform 2, 3, or 4, this is the waveform that should ideally exist on the cable bundle but must be produced during generator performance verification when measured as shown in Figure 22-16 or Figure 22-18, If the specified test voltage waveform is achieved during the test and is within the tolerance shown in Figures 22-2, Figure 22-3 or Figure 22-4, no generator performance verification is required. The peak voltage level shall be measured on the cable bundle as shown in Figure 22-17 or Figure 22-19. When monitoring the current limit (IL) associated with Waveform 2, 3 or 4 test levels (VT), the current waveforms shall be as follows: (1) For Voltage Waveform 2 tests: If the current test limit is reached before the voltage test level and the generator produced a Waveform 1 during performance verification, then the test is acceptable. This is the expected relationship between Waveforms 1 and 2. If the generator could not produce a compliant Waveform 1 during verification then a Waveform 1 current test is required. In this situation, the waveform set designator shall be Z. (2) For Voltage Waveform 3 tests: The voltage and current waveshapes are the same therefore the test is acceptable if either the test level or test limit is reached. (3) For Voltage Waveform 4 tests: If the current test limit is reached before the voltage test level and the generator produced a current waveform that has equal to or longer rise (T1) and decay times (T2) than the voltage test waveform during performance verification, then the test is acceptable. Shorter duration current waveforms are not acceptable during performance verification. If the generator could not produce a compliant current waveform during verification then a Waveform 5A current test is required. In this situation, the waveform set designator shall be Z. 22-13 2010 RTCA, Inc. (4) Waveform 5A may be defined as a voltage waveform. Although Waveform 5A is defined as a current waveform, the waveshape may also be used for a voltage waveform when the test method specifies lifting the wire shields for direct core wire pulsing, Waveform 5A may be defined as a voltage test level. This is the waveform that must be produced during generator performance verification when measured as shown in Figure 22-16 or Figure 22-18. The peak voltage level shall be measured on the cable bundle as shown in Figure 22-17 or Figure 22-19. For this case, the appropriate test level (VT) of Waveform 4 of Table 22-3 with the Waveform 5A waveshape shall be used. The category shall then be labeled as Category Z. i. Waveforms 1, 5A, 5B and 6 are defined as current waveforms. When a current test level (IT) is specified as Waveform 1, 5A, 5B, or 6 this is the waveform that should ideally exist on the cable bundle, but must be produced during generator performance verification when measured as shown in Figure 22-16 or Figure 22-18. If the specified test current waveform is achieved during the test and is within the tolerance shown in Figure 22-3 or Figure 22-4, no generator performance verification is required. The peak current level shall be measured on the cable bundle as shown in Figure 22-17 or Figure 22-19. When monitoring the voltage limit (VL) associated with Waveform 1, 5A, 5B or 6 current test levels (IT), the voltage waveforms shall be as follows: (1) For current Waveform 1 tests: If the voltage limit is reached before the current test level and the generator produced a voltage waveform with a risetime (T1) shorter than Waveform 1 T1 and a duration (T2) longer than Waveform 2 during performance verification, then the test is acceptable. If the generator could not produce such a compliant voltage waveform during verification then a Waveform 2 voltage test is required. In this situation, the waveform set designator shall be Z. (2) For Current Waveform 5A or 5B tests: If the voltage limit is reached before the current test level and the generator produced a voltage Waveform risetime (T1) shorter than Waveform 5 T1 but not shorter than Waveform 4 T1 during performance verification, then the test is acceptable. If the generator could not produce such a compliant voltage waveform during verification then a Waveform 4 voltage test is required. In this situation, the waveform set designator shall be Z. In certain situations related to airframe design and wiring layout, equipment may be exposed to longer duration waveforms such as Waveform 5B (see Figure 22-5). Tests conducted under these conditions shall be given designator Z. (3) For Current Waveform 6 tests: Waveform 6 is used to address multiple burst requirements for EUTs that utilize low impedance cable bundle installations. Waveform 6 should ideally exist on the cable bundle but must be produced during generator performance verification when measured as shown in Figure 22-6. If the specified test current waveform is achieved during the test and is within the tolerance shown on Figure 22-6, no generator performance verification is required. The peak current level shall be measured in the cable bundle as shown in Figure 22-17 or Figure 22-19. When monitoring the voltage limits (VL), associated with Waveform 6 test levels (IT); if the voltage limit is reached before the current test level and the generator ratio of open circuit voltage to short circuit current is less than 15 ohms, then the test is acceptable. 22-14 If the generator does not meet this criterion, then a Waveform 3 multiple burst test is required" Bu bilgilere göre communication kablosuna uygulanacak lightning testi için Test cable lenght'ler kaç olmalı ?
- Assistant
The information presented primarily discusses the methodology for cable bundle testing in an aviation context, particularly regarding the effects of electromagnetic transients and lightning on aircraft systems. However, it does not provide specific details on the required test cable lengths for lightning tests on communication cables.
Determining the correct test cable length typically depends on several factors, including:
-
Standards and Regulations: Relevant industry standards or regulatory requirements provide specific guidelines for cable length in testing procedures. In the aviation industry, these might involve standards from organizations like SAE, RTCA, or specific manufacturer requirements.
-
- User
türkçe yaz
- Assistant
Verilen bilgiler, özellikle havacılık bağlamında kablo demeti testine ve elektromanyetik geçici olaylar ile yıldırımların uçak sistemleri üzerindeki etkilerine odaklanmaktadır. Ancak, iletişim kablolarına uygulanacak yıldırım testleri için gereken spesifik kablo uzunluklarını belirtmemektedir.
Doğru test kablo uzunluğunu belirlemek genellikle aşağıdaki faktörlere bağlıdır:
-
Standartlar ve Yönetmelikler: İlgili endüstri standartları veya düzenleyici gereklilikler, test prosedürlerinde kablo uzunluğu için belirli kılavuzlar sağlar. Havacılık endüstrisinde, bunlar SAE, RTCA gibi kuruluşlar veya belirli üretici gerekliliklerini içerebilir.
-
Kurulum ve Ekipman: Geçici olayları indükleyen ekipman da dahil olmak üzere test kurulumunun yapılandırılması, gereken kablo uzunluğunu etkileyebilir.
-
- User
uçak sistemine bağlı 28V bataryası için lightning testlerini araştırıyorum. Communication hatları aşağıdaki gibidir. The Battery Communication Connector Pinout Pin Name Type Descriptions 1 SOC Analog Output State of Charge is represented linearly from 0 to 100% as 0 to 5V 2 Disable Battery Discrete Input Ground to turn the power and communication off 3 Disable Heater Discrete Input Ground to turn the heater off. 4 RTD-1A Analog Output (1) PT100 Thermistor will be placed between these pins 5 RTD-1B Analog Output 6 RTD-2A Analog Output (2) PT100 Thermistor will be placed between these pins 7 RTD-2B Analog Output 8 ARINC 429 (A) Serial Output Transfers ±5Vdc for High / Low signals 9 Service Discrete Output Normally Open, Grounded when the battery has permanent fault 10 Fault Discrete Output Normally Open, Grounded when the battery has temporary fault 11 Heating Discrete Output Normally Open, Grounded when the heater is active 12 Low Capacity Discrete Output Normally Open, Grounded when the capacity is below the value programmed according to customizable configuration parameter 13 Analog Ground Analog Ground Isolated reference ground for 1 pin. 14 Discrete Ground Discrete Ground Isolated reference ground for 2, 3, 9, 10, 11, 12, 17 pins. 15 Reserved - Reserved 16 Reserved - Reserved 17 Engine Start Discrete Output Normally Open, Grounded when the battery is warm and charged enough 18 ARINC 429 (B) Serial Output Transfers ±5Vdc for High / Low signals 19 Reserved - Reserved Buna göre muadil batarya tasarımında ARINC ve Discrete sinyallerin input hatlarına TVS ve koruma devreleri kurulmadığını farkettik. ARINC ve discrete hatların input'larına lightning testi uygulanmıyor mu ?
- Assistant
ARINC ve discrete sinyal hatlarına yönelik lightning testleri, özellikle uçak sistemlerinin elektromanyetik uyumluluğunu (EMC) sağlama amacıyla önemlidir. Temel olarak, uçak ekipmanları dış etkenlerden gelecek elektromanyetik etkilerden korunmalı ve bu tür testler, sistemlerin bu koşullara dayanıklılığını doğrulamak için yapılır. Ancak, hangi hatların test edilmesi gerektiği, tasarım gereksinimlerine, uygulama standartlarına ve belirli sistemin kritikliği gibi faktörlere bağlı olarak değişebilir.
- User
"Is the frequency of the signal so high that capacitive effects need to be considered?" Yüksek frekanslar nasıl kapasitif etki yaratır ?
- Assistant
Yüksek frekanslı sinyallerde kapasitif etkiler, elektriksel devrelerde ve özellikle kablolarda ve bağlantılarda önemli bir rol oynar. Kapasitif etkiler, sinyalin iletim ve alıcı devrelerde istenmeyen davranışlara neden olabilir. İşte nasıl kapasitif etkilerin oluştuğuna dair temel bilgiler:
- User
havacılık bataryası tasarımı yapılıyor. Do-160g section 22 lightning effects testlerine gireceğiz. bu bataryanın iletişim kablosu var ve 19 tane pini var. Bu pinlerden çıkan sinyalle input veya output olarak uçağın kokpiti ile haberleşme sağlıyor. Pin injection veya direct injection test metotları kullanılarak bu pinlere level 3 yıldırım darbeleri vurulacak. Bu testlerden geçiş muadil batarya devre kartlarını incelediğimizde bu pin sinyalleri devrelerinin hepsine koruma devrelerinin yapılmadığını farkettik. (TVS diyot ve direnç) Bazı sinyaller için koruma devreleri eklenmiş sadece. Buradan yola çıkarak, acaba her pine ve her sinyale bu test uygulanmıyor mu ? Ya da uygulanmışsa da korumasız testi geçen sinyaller için koruma devresi eklemeyi gerekli bulmadılar mı ? Hangi pinlere bu testi uygulamamız gerektiğini neye göre ve nasıl belirleyeceğiz ?
- Assistant
DO-160G standardının Section 22'si, havacılık elektronik ekipmanlarının yıldırım kaynaklı darbeler gibi elektromanyetik olaylara karşı dayanıklılığını test etmek için gereklilikleri belirler. Pin injection veya direct injection yöntemleri, özellikle sinyal ve güç hatlarının yıldırım darbelerine karşı test edilmesi amacıyla kullanılır. Belirli pinlere test uygulanıp uygulanmadığını ve hangi pinlere uygulanması gerektiğini belirlerken dikkate alınması gereken bazı faktörler şunlardır:
- User
Figure 22-13 Pin Injection Test Setup, Signal Pins & Power Pins – Direct Injection Method için "Test procedures assume lightning transients appear common-mode between all pins and case. If the expected installation utilizes local power and/or signal returns tied either internally or externally to case or aircraft structure, tests shall be performed with the return(s) tied to the case." Bu açıklamayı detaylıca örnek vererek açıkla
- Assistant
Bu açıklama, DO-160G Section 22 altında yapılan Pin Injection Testi'nin bir parçası olarak, sinyal ve güç pinleri üzerinde doğrudan enjeksiyon yöntemi kullanılarak yıldırım geçici durumlarının nasıl test edileceğini anlatıyor. Buradaki anahtar, yıldırımın oluşturabileceği ortak mod geçici durumları ve bu durumların nasıl ele alınması gerektiğidir. İşte bu açıklamanın detaylandırılması ve örneklerle açıklanması:
- User
örneğini 28V batarya için ver
- Assistant
Tabii ki, 28V batarya sistemi için bu durumu bir örnekle açıklayabilirim:
Örnek: 28V Batarya Sistemi
Sistem Yapısı:
- Düşünün ki, bir uçak sisteminde kullanılan bir 28V batarya modülümüz var. Bu batarya, hem güç pinleri hem de çeşitli iletişim ve kontrol sinyalleri için sinyal pinleri içeriyor. Bataryanın kasası, uçağın metal gövdesine (airframe) bağlanarak ortak bir topraklama noktası sağlıyor.