correct the grammar: • August 15, 2024- Flood testing was done from unit 17A-WW and…
Jump to turn (10)
- 1correct the grammar: • August 15, 2024- Flood testing was done from unit 17A-WW
- 2correct the grammar: • September 8, 2024- The unit was inspected again by Engine
- 3correct the grammar: • For further investigation. Will coordinate the schedule o
- 4correct the grammar: This is to sent the initial report for the leak concern on
- 5correct the grammar This is to send the initial report regarding the leak concer
- 6correct the grammar: Normally with what we have in hand and from previous experi
- 7correc tthe grammar: Based on what we currently have and previous experience, we
- 8correct the grammar: This is to formally report the result of the action taken b
- 9correct the grammar: Hello Ma’am, Unfortunately, we do not have access on the po
- 10correct the grammar: Unfortunately, we do not have access to the portal where yo
- User
correct the grammar: • August 15, 2024- Flood testing was done from unit 17A-WW and found that no leas are persisting in the unit form unit 17A-WW.
- Assistant
August 15, 2024 - Flood testing was conducted on unit 17A-WW, and it was determined that no leaks are persisting in the unit from unit 17A-WW.
- User
correct the grammar: • September 8, 2024- The unit was inspected again by Engineering tech Luis, and the findings were the leak was not coming from the ACDP but in the pipe chase hidden behind the wall of the shower area. After some checking and verification, there is a chance that the leak might be connected to the storm drain main riser of series A-WW.
- Assistant