Please correct the grammar: Hello Cha, This has been observed by Sir Rod yesterday upon checking the area before MSB installation, it was not captured during checkplot stage. The requirement for passage should at least 600. Can we look into option converting the bend into a folding type. It will cost at hours for redesigning and prefabrication for modification, we could charge that as reworks.
- Assistant
Hello Cha,
This was observed by Sir Rod yesterday during the check of the area before the MSB installation. It was not captured during the check plot stage. The requirement for the passage should be at least 600. Can we consider converting the bend into a folding type? It will incur costs for redesigning and prefabrication for the modification, which we could classify as rework.