Please improve: This report marks 24 weeks into the construction of H428. Progress…
- User
Please improve: This report marks 24 weeks into the construction of H428. Progress remains on track with the baseline schedule. The superstructure was successfully lifted on hull last July 24th. Majority of the structure surveys have been completed. Hence, it paves for equipment installation such as generator, deck crane HPU, AHU, pumps, and main switch board. Insulation and bulkhead lining installation are also underway.
Plan approval with actual stamped from MMD and IEA have all received. First site surveys have been firmed up which scheduled on September 5-6, 2024 for MMD and on September 25-26, 2024 for IEA. - Assistant
This report provides an update on the construction of H428, marking the completion of 24 weeks. Progress remains aligned with the baseline schedule. Notably, the superstructure was successfully lifted onto the hull on July 24th. The majority of structural surveys have been completed, facilitating the installation of essential equipment, including the generator, deck crane hydraulic power unit (HPU), air handling unit (AHU), pumps, and main switchboard. Additionally, insulation and bulkhead lining installation are currently in progress.
All necessary plan approvals, with official stamps from the Maritime and Port Authority (MMD) and International Energy Agency (IEA), have been secured. The first site surveys have been scheduled for September 5-6, 2024, for MMD, and September 25-26, 2024, for IEA.
- User
Please improve: Plan approval with actual stamped from MMD and IEA have all received. First site surveys have been firmed up which scheduled on September 5-6, 2024 for MMD and on September 25-26, 2024 for IEA.
- Assistant
Plan approvals, complete with official stamps from the Maritime and Port Authority (MMD) and the International Energy Agency (IEA), have been successfully obtained. The first site surveys are confirmed and scheduled for September 5-6, 2024, for MMD, and September 25-26, 2024, for IEA.