Please correct the reamark: Fab opted to cut an access on main deck as bulkhead cutout…
- User
Please correct the reamark: Fab opted to cut an access on main deck as bulkhead cutout will have possible clashes on engine loading once they plan to have it close. Franny is looking for schedule on Saturday, 17-August on the Port Side.
- Assistant
Here's a revised version of your remark for clarity and correctness:
"Fab opted to create an access point on the main deck, as the bulkhead cutout may cause potential clashes with engine loading once it is closed. Franny is looking for the schedule for Saturday, August 17th, on the port side."
- User
Please correct the remark: Fab opted to cut an access on main deck, as bulkhead cutout may have difficult for them to closeout once engine is installed.
- Assistant
Here's a corrected version of your remark:
"Fab opted to create an access point on the main deck, as the bulkhead cutout may make it difficult for them to close out once the engine is installed."
- User
Please correct the remark: Cutout at Unit 03 Stbd is completed, at port it is on progress.
- Assistant
Here's a corrected version of your remark:
"The cutout at Unit 03 on the starboard side is complete, while the one on the port side is in progress."
- User
please correct the remar: Stbd cutout done with cutting, port still hold up for main deck bulkhead have welding still to complete. Target to complete the port cutout by tomorrow.
- Assistant
Here's a revised version of your remark for clarity and correctness:
"The starboard cutout is complete, while the port cutout is still on hold due to pending welding on the main deck bulkhead. The target is to complete the port cutout by tomorrow."
- User
please correct the remar: SFP insulation and acoustic sheeting should be prioritized the installation at location of generator, and cable tray
- Assistant
Here’s a corrected version of your remark:
"SFP insulation and acoustic sheeting should be prioritized for installation in the locations of the generator and cable tray."
- User
please correct the remark: - Fab to complete the pressure testing this week to place down the fresh water and sullage tank, and give way installation of MSB plinth.
- Fab is requested to remove the temporary post on Unit 02 to give more space.
- Assistant
Here’s a corrected version of your remarks:
- "Fab is scheduled to complete the pressure testing this week to install the fresh water and sullage tanks, allowing for the installation of the MSB plinth."
- "Fab has been requested to remove the temporary post on Unit 02 to create more space."