The path’s reopening has been quite complex because of its fragile cliffside location. It has been an engineering challenge because of its precarious perch dug into the rock between the sky and the sea, the Tourism Ministry said in a news release sent to CNN.
Refurbishment work started on January 14, 2022, and finished on July 19, 2024. Specialized companies worked on site, using helicopters to transport materials and installing a stainless steel net and deep bolts. Rock climbers moved the equipment on the walls while suspended with ropes and steel cables to special anchors.
The overall investment was almost €24 million (about $26 million) split among several ministries in Italy.
- Assistant
路径的重新开放非常复杂,因为它位于脆弱的悬崖边缘位置。意大利旅游部在新闻稿中对此表示,这是一个工程挑战,因为路径危险地凿入岩石之间,悬挂在天空和海洋之间。
翻新工作始于2022年1月14日,于2024年7月19日完工。专业公司现场工作,使用直升机运输材料,并安装不锈钢网和深螺栓。攀岩者悬挂在绳索和钢索上移动设备到墙上,到达特殊的锚点。
总投资约为2400万欧元(约2600万美元),由意大利的几个部门分担。