Please correct the remarks: • Engineering system materials comprised about 93% actual…
- User
Please correct the remarks: • Engineering system materials comprised about 93% actual delivered. Few remaining materials are expected to be delivered as part of 3rd consol with the ETA on August 15.
- Assistant
• Engineering system materials are comprised of about 93% of what was actually delivered. The few remaining materials are expected to be delivered as part of the third consignment with an estimated time of arrival on August 15th.
- User
Please correct the remarks: • Luggage crates materials have all got PO and now waiting for delivery. • Variation No. 003 which includes supply of 10 IBC and fuel bunkering for deliver voyage now for pricing estimate.
- Assistant
• All materials for the luggage crates have been ordered and are now awaiting delivery. • Variation No. 003, which includes the supply of 10 IBCs and fuel bunkering for the delivery voyage, is now being priced for estimation.
- User
Please improve the remarks: • Client observed flag pole is being missed out on the design, drawing to be updated.
- Assistant
• The client has noticed that the flag pole is missing from the design and has requested that the drawing be updated to include it.
- User
Please correct the remarks: The following are Client design concerns raised from their visit:
- Assistant
The following are design concerns raised by the client during their visit: