“Table of Contents
1 GENERAL 1
1.1 Purpose 1
1.2 Scope 1
1.3 Applicability 1
1.4 Applicable Documents 2
1.4.1 Internal References 2
1.4.2 External References 2
1.5 Acronyms, Abbreviations and Symbols 3
2 HARDWARE VERIFICATION AND VALIDATION PLAN 6
2.1 Introduction 6
3 VALIDATION PROCEDURES 7
4 VALIDATION METHODS AND DATA 7
4.1 Validation Methods 7
4.2 Hardware Requirements Process Validation Activities and Data 8
4.2.1 Reviews Complete 9
4.2.2 Disposition of Review Comments 9
4.2.3 Documentation and Approval of Derived Requirements 9
4.2.4 Test Results 9
4.2.5 Acceptance Criteria 9
4.2.6 Validation Reports 9
4.2.7 Review Findings 10
5 VALIDATION ENVIRONMENT 10
5.1 Tools And Equipments 10
5.1.1 Tools 10
5.1.2 Equipments 11
6 VERIFICATION PROCEDURES 12
7 VERIFICATION METHODS AND DATA 12
7.1 Verification Methods 12
7.1.1 Reviews 12
7.1.2 Testing 14
7.1.2.1 Test Procedures 15
7.1.2.2 Test Results 16
7.1.3 Analysis 16
7.1.3.1 Thermal Analysis 16
7.1.3.2 Stress Analysis 16
7.1.3.3 Reliability Analysis 16
7.1.3.4 Functional Failure Path Analysis 17
7.2 Commercial Off-The-Shelf (COTS) Components Usage 17
7.2.1 Verification of COTS Components 17
7.2.1.1 Technical Documentation Review 17
7.2.1.2 Functional Tests 17
7.3 Verification Data 18
7.4 Hardware Planning Process Verification Activities and Data 18
7.4.1 Hardware Planning Process Inputs 19
7.4.2 Hardware Planning Process Reviews and Analyses 19
7.5 Hardware Requirements Verification Activities and Data 19
7.5.1 Hardware Requirements Process Verification Objectives 20
7.5.2 Hardware Requirements Process Inputs 20
7.5.3 Hardware Requirements Process Reviews and Analyses 21
7.6 Hardware Design Process Verification Activities and Data 21
7.6.1 Hardware Design Process Verification Objective 22
7.6.2 Hardware Design Process Inputs 22
7.6.3 Hardware Design Process Reviews and Analyses 22
7.7 Hardware Implementation Verification Process Activities and Data 23
7.7.1 Hardware Implementation Process Verification Objectives 24
7.7.2 Hardware Implementation Process Inputs 24
7.7.3 Hardware Implementation Process Reviews and Analyses 24
7.8 Hardware Testing Verification Activities and Data 25
7.8.1 Hardware Testing Verification Objectives 25
7.8.2 Hardware Testing Inputs 25
7.8.3 Hardware Testing Reviews and Analyses 26
7.8.4 Hardware Test Execution 26
7.8.5 Process-Specific Activities 26
7.8.5.1 Test Procedure Development 26
7.8.5.2 Test Procedure Verification 27
7.8.5.3 Testing Environment 27
7.8.5.4 Test Results Verification 27
7.9 Production Transition Process Verification Activities and Data 27
7.9.1 Production Transition Process Verification Objectives 28
7.9.2 Production Transition Process Inputs 28
7.9.3 Production Transition Process Reviews and Analyses 29
8 VERIFICATION INDEPENDENCE 29
9 VERIFICATION ENVIRONMENT 29
9.1 Tools 29
9.1.1 Qualification of Verification Tools 30
9.1.2 Test Procedure Structure 30
10 ORGANIZATIONAL RESPONSIBILITIES 30
10.1 Responsibilities 30
List of Tables
Table 1 Internal Reference Documents 2
Table 2 External Reference Documents 2
Table 3 Definitions 3
Table 4 Abbreviations 6
Table 5 Hardware Requirements Process Validation Activities and Data 8
Table 6 Validation and Verification Process Tools 10
Table 7 Validation and Verification Process Equipments 11
Table 8 Review Checklist 14
Table 9 Hardware Planning Verification Activities 18
Table 10 Hardware Requirements Verification Activities 19
Table 11 Design Phase Verification 21
Table 12 Hardware Imlementation Verification Activities 22
Table 13 Hardware Testing Verification Activities 24
Table 14 Hardware Testing Verification Activities 27
List of Figures
Figure 1 Hardware Test Flow 15
1 GENERAL
1.1 PURPOSE
This Hardware Validation and Verification Plan (HVVP) describes verification and validation activities of the hardware to be developed in accordance with RTCA/DO-254 within the scope of the Heavy Class Attack Helicopter Program.
1.2 SCOPE
The Battery System development lifecycle depicts the interaction between the Development Team and the Verifier/Validator. In general, the Verifier/Validator performs reviews, analyses and/or tests on the artefacts created by the Development Team. The Verifier/Validator also performs reviews of the test procedures, analyses and test results produced within the team. All verification activities will be conducted by the Verifier with independence; refer to the Verification Independence section of this document for additional details.
1.3 APPLICABILITY
This plan can be used only for Heavy Class Attack Helicopter contracts made between TUSAŞ and ASPİLSAN Energy. In case of any incompatibility between this plan and the contract, the terms of the contract will be applied.
1.4 APPLICABLE DOCUMENTS
1.4.1 Internal References
Table 1 Internal Reference Documents
Document No Title
1 BL-SD-001-0002 System Description Document
2 BL-IC-001-0002 Interface Control Document
3 PL-DO-001-0003 Design Organization Interface Document
4 PL-HPA-001-0002 Hardware Process Assurance Plan
5 PL-HCM-001-0002 Hardware Configuration Management Plan
6 RP-RAR-001-0001 Reliability Analysis Report
7 RP-SSA-001-0002 System Safety Assessment
8 PR-AV-009 Hardware Validation and Verification Standards
1.4.2 External References
The documents listed in Table 2 Reference Documents below is for reference only. Each document is applicable to this document only to the extent specified herein.
Table 2 External Reference Documents
Document No Title Rev/Date
2 RTCA/DO-254 Design Assurance Guidance for Airborne Electronic Hardware April 19, 2000
3 AMC 20-152A Development Assurance for Airborne Electronic Hardware November 5, 2023
1.5 ACRONYMS, ABBREVIATIONS AND SYMBOLS
Definitions are shown in Table 3 Definitions.
Table 3 Definitions
Definitions Description
Analysis An evaluation based on decomposition into simple elements.
Assessment An evaluation based upon engineering judgment.
Assurance The planned and systematic actions necessary to provide adequate confidence and evidence that a product or process satisfies given requirements.
Authority The organization or person responsible within the State (Country) concerned with the certification of compliance with applicable requirements.
Certification The legal recognition that a product, service, organization or person complies with the applicable requirements. Such certification comprises the activity of technically checking the product, service, organization or person, and the formal recognition of compliance with the applicable requirements by issue of a certificate, license, approval or other document as required by national laws and procedures.
Compliance Successful performance of all mandatory activities; agreement between the expected or specified result and the actual result.
CM Storage The Hardware Configuration Management Plan designated repository for the artifact or data generated by the Verification/Validation Team as evidence of their activities
Derived Requirements Additional requirements resulting from design or implementation decisions during the development process which are not directly traceable to higher-level requirements.
Entry Criteria The conditions under which the Verification/Validation Team starts or reassesses their activities for the respective phase
Exit Criteria The conditions under which the Verification/Validation Team completes their activities for the respective phase
Failure An occurrence which affects the operation of a component, part or element such that it can no longer function as intended,
Hardware An item that has physical being.
Implementation The act of creating a physical reality from a specification.
Independence Separation of responsibilities that assures the accomplishment of objective
Evaluation e.g. validation activities not performed solely by the developer of the requirement of a system or item.
Item A hardware or software element having bounded and well-defined interfaces.
Normal Test Case A test case that verifies functionality using inputs that are based on the associated requirement(s). Normal test cases use input stimuli that verify the values or levels specified in the requirements.
Phase The lifecycle Phase in which the activity occurs
Reliability The probability that a system or item will perform a required function under specified conditions, without failure, for a specified period of time.
Requirement An identifiable element of a function specification that can be validated and against which an implementation can be verified.
Safety The state in which risk is acceptable.
Specification A collection of requirements which, when taken together, constitute the criteria that define the functions and attributes of a system, component or item.
System A combination of inter-related items arranged to perform a specific function(s).
Test A quantitative procedure to prove performance using stated objective criteria with pass or fail results.
Test Case Test cases define a set of inputs and expected response based on the hardware requirements. Test cases can be considered the requirements specification for a test procedure.
Test Procedure Test procedures describe the detailed step by step process to implement a test case on the test platform. The procedures are based on the test cases.
Verification The evaluation of an implementation of requirements to determine that they have been met.
Validation The process by which requirements are determined to be correct and complete.
Verifiable A characteristic of a requirement that determines if it can be verified through test, analysis (or simulation), or review/inspection.
Verification The process by which a hardware design is determined to correctly and completely satisfy its requirements.
V&V Activities The reviews, analyses (including simulation) and tests performed by the Verification/Validation Team
V&V Artifact The artifact or data generated by the Verification/Validation Team as evidence of their activities
V&V Tools The software and/or hardware tools utilized by the Verification/Validation Team while they perform their activities
The following acronyms and abbreviations may have been used in this document.
Table 4 Abbreviations
Abbreviations, Acronyms or Terms Definition
ANSYS Analysis System
CM Configuration Management
DOORS Dynamic Object Oriented Requirements System
ECMP Electronic Component Management Plan
HAS Hardware Accomplishment Summary
HECI Hardware Environment Configuration Index
HCI Hardware Configuration Index
PSSA Preliminary System Safety Assesment
RTCA Radio Technical Commission for Aeronautics
HRD Hardware Requirements Document
FFPA Functional Failure Path Analysis
CCB Configuration Control Board
2 HARDWARE VERIFICATION AND VALIDATION PLAN
2.1 INTRODUCTION
Hardware verification and validation activities check the hardware against its specifications and requirements. In Aspilsan Energy,
• Each hardware element meets requirements.
• Independence audits are conducted.
• Efforts are made to ensure that the verification and validation process adequately demonstrates the suitability of each hardware component for operational and environmental use.
3 VALIDATION PROCEDURES
Validation procedures ensure compliance with DO-254 requirements by thoroughly evaluating the hardware design. This section defines the purpose, participants, and criteria for validation. It provides detailed instructions for validation activities, including acceptance and completion criteria. The validation plan outlines schedules and resources, while validation reports document and analyze results for stakeholders.
4 VALIDATION METHODS AND DATA
4.1 VALIDATION METHODS
Derived requirements are identified in the DOORS attributes for a requirement. The validation of derived requirements will be performed in the Requirements Capture phase during the requirements review activity. When the derived requirements cannot be validated by the review method, test and analysis methods in the verification methods section will be used. The objective of the validation is to ensure that:
o Derived requirements are correct
o Derived requirements are complete
o Derived requirements are documented and is correct
o Derived requirements based on design decisions from the circuit card design clearly document the related design decision
o Errors in derived requirements are fed back to the development Team for correction.
o Safety impact of derived requirements are analyses
Validation of the derived requirements in the Hardware Requirements Document (HRD) will be performed via reviews, analyses and tests. The reviewer will make to review the derived requirements and associated tracking data against the checklists. The review checklist should clearly indicate the source of the data reviewed. During the review, the reviewer will assess whether the derived requirements is justified. The description of validation standards to be applied will be made according to the “PR-AV-009 Hardware Validation and Verification Standards Document.”
Hardware Validation and Verification Standards provide a structured approach to ensure that hardware components and systems meet quality, reliability, and safety standards. They are used as a guide for planning, executing, and documenting hardware testing and validation activities, ultimately leading to improved hardware products and reduced risks.
Derived requirements omissions and errors are documented in the Hardware Configuration Management Plan (HCMP).
4.2 HARDWARE REQUIREMENTS PROCESS VALIDATION ACTIVITIES AND DATA
Validation of derived requirements will be performed in the Requirements Capture phase as shown in the Table 5.
Table 5 Hardware Requirements Process Validation Activities and Data
Phase Entry Criteria V&V Activities V&V artifact V&V Tools CM storage Exit Criteria
Requirement Capture • Hardware Requirements Document controlled in CM
• Hardware Requirements Document review checklist Validate derived requirements with the review checklist Hardware Requirements Document review checklist completed Excell
DOORS
JIRA Hardware Requirements Document review checklist controlled in CM Reviews complete
All review comments dispositioned
All derived requirements are identified, have rationales and approved by safety.
Evidence to be produced as a result of the hardware verification process;
4.2.1 Reviews Complete
Reviews will be conducted throughout the hardware validation process to ensure that every aspect is thoroughly reviewed and evaluated.
4.2.2 Disposition of Review Comments
Addressing and resolving review comments is a crucial aspect of the validation process. This section outlines the systematic approach for managing and resolving feedback received during reviews. Each comment will be carefully reviewed, categorized based on its severity and impact on the hardware design, and dispositioned accordingly. Clear criteria and responsibilities for each disposition decision will be established to ensure that no critical issues or concerns remain unresolved.
4.2.3 Documentation and Approval of Derived Requirements
Derived requirements resulting from higher-level requirements are identified and documented. These derived requirements will be reviewed and approved by safety engineers. This step will emphasize the commitment to safety and validation of hardware design in accordance with DO-254 standards.
4.2.4 Test Results
Outcomes of the tests, which should include data, measurements, observations, and any deviations or issues encountered during testing.
4.2.5 Acceptance Criteria
Predefined criteria or standards that hardware must meet to pass the tests will be clearly defined.
4.2.6 Validation Reports
Detailed summaries of the validation process will be provided, including test results, compliance with acceptance criteria, and any identified issues or deviations.
4.2.7 Review Findings
If reviews as part of the validation process, the findings and outcomes of these reviews will be documented. This may include design reviews or other relevant assessments.
5 VALIDATION ENVIRONMENT
For this project, the validation environment is requirement management tool, the problem reporting system, the configuration management system.
5.1 Tools And Equipments
The tools and equipment specified in Table 6 and Table 7 will be use in both verification and validation processes.
5.1.1 Tools
The tools to be used in the validation and verification process are as shown in Table 6.
Table 6 Validation and Verification Process Tools
Tools Purpose of Usage
DOORS DOORS is use to create hardware requirements for validation and verification activities.
JIRA In the validation and verification process, JIRA is employed for reviews, tracking open problem reports, and managing Configuration Management activities.
QDMS The Quality Document Management System (QDMS) is utilized for the organization, storage, retrieval, and management of quality-related documents and processes.
EXCEL Excel is used for Checklists in the review process.
ANSYS Ansys is used for mechanical analysis, using FEM method. Structural, thermal and some electrical analysis can be performed on this tool.
PTC WINDCHILL Fault tree analysis is performed for functional failure path analysis. Ptc windchill is used for fault tree analysis.
Battery GUI It is use to monitoring detailed technical information about the status of the battery.
5.1.2 Equipments
The test equipment to be used in the validation and verification process is shown in Table 7.
Table 7 Validation and Verification Process Equipments
Equipments Purpose of Usage
Power Supply It is use to provide power the circuit boards.
DC Electronic Load It is use to provide load to circuit boards and LRU.
High Precision Data Logger It is use to record current, voltage and temperature data of the LRU.
Oscilloscope It is use to monitoring and calculate voltage and current information of the circuit bords and LRU.
Current and Voltage Probes It is use to measure the voltage and current of circuit bords and LRU.
Logic Analyser A logic nalysed is an electronic test tool used to capture and nalyse digital signals on circuit boards.
Multimeter It is use to measure voltage, current, resistance and capacitance values.
Insulation Tester It is use to measure the insulation resistance of LRU.
Miliohmmeter It is used to measure very low resistance values accurately.
6 VERIFICATION PROCEDURES
Verification procedures will be ensure that the hardware design meets the requirements specified in DO-254. It will be documented in detail in the “Hardware Review and Analysis Procedures” document. This document will be include:
- Purpose of review or analysis.
- Organizations to participate in the review.
- Review or analysis criteria.
- Detailed instructions for conducting the review or analysis.
- Review or analysis acceptability and completion criteria.
7 VERIFICATION METHODS AND DATA
7.1 Verification Methods
Hardware verification will start with a plan to organize the test strategy. Each hardware requirement will be assessed as to whether it is suitable for review, analysis and/or test. The optimal environment for verifying each requirement will be defined accordingly. Details of the verification standards will be described in the “PR-AV-009 Hardware Validation and Verification Standards” document.
7.1.1 Reviews
A review is a process or meeting during which a work product, or set of work products, is presented to project personnel, managers, users, customers, or other interested parties for comment or approval.
Reviews should be held throughout the hardware design life cycle as identified in the Hardware Design Plan.
Guidance for reviews may include:
- Participants should have the knowledge necessary to perform the reviews.
- Hardware review results may be used to permit or deny transitions between hardware design life cycle process activities
- Result of review should be documented, including decisions made and disposition of actions to be taken
Reviews are performed on all lifecycle data. The reviews will be documented in a checklist; the completed checklist will be check over Excel and JIRA system also these documents stored in the QDMS.
When performing the review, all checklist questions will be answered. Any comments will be noted on the checklist and discussed with the document author or technical authority. Each comment will have an agreed corrective action documented. Following incorporation of agreed comments and actions, the reviewer will verify that the document has been updated appropriately.
Checklists will present a series of questions selected to ensure that the hardware design life cycle data has the following characteristics:
• Unambiguous – the information and/or data is documented in such a manner that it only a permits a single interpretation.
• Complete – the information and/or data includes all the necessary and relevant requirements and descriptive material consistent with the standards. The figures are clearly nalysed, all terms are defined and units of measure specified.
• Verifiable – the information and/or data can be reviewed, nalysed or tested for correctness.
• Consistent – the information and/or data has no conflicts within the document or between multiple documents.
• Modifiable – the information and/or data is structured in such a way that changes, updates or modifications can be completely, consistently and correctly made while retaining the structure.
• Traceable – the origin or derivation of the information and/or data can be demonstrated.
The characteristics listed above and configuration control aspects of all life cycle documents will be verified by review.
Table 8 lists the reviews to be performed and its associated review checklist.
Table 8 Review Checklist
Lifecycle Artifact Reviewed Checklist
Plan for Hardware Aspects of Certification FR-KYM-196
Hardware Design Plan FR-KYM-201
Hardware Validation and Verification Plan FR-KYM-202
Hardware Process Assurance Plan FR-KYM-199
Hardware Configuration Management Plan FR-KYM-198
Hardware Requirements Standards FR-KYM-200
Hardware Design Standards FR-KYM-226
Hardware Archive Standards FR-KYM-225
Hardware Verification and Validation Standards FR-KYM-232
Hardware Requirements Document FR-KYM-223
Hardware Test Procedures FR-KYM-230
Hardware Test Results FR-KYM-231
Hardware Review and Analysis Procedures FR-KYM-228
Hardware Review and Analysis Results FR-KYM-229
7.1.2 Testing
Testing is the verification of the actual hardware to show that the implementation meets the requirements. Testing is typically performed in-circuit with production or production equivalent hardware. Production equivalent means that the circuits and card layouts are the same as those that will be used in the aircraft. Any differences should be assessed for impact. Testing can be performed at the LRU level and board level tests.
Requirements --> Test Procedure --> Test Results
Figure 1 Hardware Test Flow
7.1.2.1 Test Procedures
A test procedure will be established for all requirements of the hardware item. Test procedures will be written to describe the step by step sequence to implement a test case. Test procedures will be include test cases and Pass/Fail criterias.
The test procedures file will be adequately commented to aid in comprehension and maintenance. Test procedure authors will maintain a Revision History in the file headers.
The traceability data may be imported to a tool to facilitate reporting such as Excel or DOORS. Test procedures will include test setups, test equipment, test cables and calibration or settings of the test equipment.
Test procedures will be dry run and debugged by the test procedure author before posting the test procedure for peer review.
All test procedures will be stored in the QDMS. The Hardware Test Procedures document will provide an index to the test procedures used for formal verification credit.
7.1.2.2 Test Results
All data resulting a test procedure with in-circuit test will be collected and stored in the QDMS as a test results. A Hardware Test Results will summarize the verification results.
The actual results will be analyzed for compliance with the expected results in the test procedures.
7.1.3 Analysis
The designed circuits will be simulated with various techniques and programs. Their accuracy will be tested according to the hardware requirements. Related analysis will be reported.
Analaysis performed include:
• Thermal Analysis
• Stress Analysis
• Reliability Analysis
• Functional Failure Path Analysis
7.1.3.1 Thermal Analysis
During the hardware design process, thermal analysis will be made at the LRU, circuit board and component level. The design process will be continued by verifying the requirements by performing thermal analysis. The analysis equipment to be used in thermal analysis will be ANSYS and thermal camera.
7.1.3.2 Stress Analysis
The hardware design will be tested under the requirement conditions. Stress analysis will be performed to ensure that the hardware components can withstand mechanical, thermal and environmental stresses without fail. Test requirements will ensure that the hardware is working under stress. The analysis equipment to be used in stress analysis will be ANSYS.
7.1.3.3 Reliability Analysis
The reliability of the hardware design will be ensured by tests to be carried out under requirement conditions. Details are in the “RP-RAR-001-0001 Reliability Analysis” document.
7.1.3.4 Functional Failure Path Analysis
An FFPA is a structured, top-down, iterative analysis. It identifies the specific portions of the design which implement the function; that is, the assemblies, components and elements associated with each path; and the associated failure modes and effects to be analyzed to determine that the hardware architecture and implementation complies with the safety requirements. The analysis equipment to be used in Functional Failure Path Analysis analysis will be PTC windchill. Details are in the “RP-SSA-001-0002 System Safety Assessment” document.
7.2 COMMERCIAL OFF-THE-SHELF (COTS) COMPONENTS USAGE
Quality and if possible, aviation history will be the selection criterias for COTS components and they will be used and tested according to DO-254. Moreover, COTS materials will be managed according to the ASPILSAN ECMP.
7.2.1 Verification of COTS Components
COTS components are used extensively in hardware designs and typically the COTS components design data is not available for review. Therefore, verification of COTS components will be verified on a requirement basis within the overall design process using the reviews and testing methods in section 7.1 Verification Methods.
7.2.1.1 Technical Documentation Review
• The COTS device will be reviewed and verified to ensure it meets the technical specifications for the intended functions.
• The performance adequacy of the COTS device for its intended functions will be verified by reviewing the related datasheets and application notes.
7.2.1.2 Functional Tests
• COTS device functional verification will be performed during requirements-based verification tests.
• All unused functions of the COTS device will be identified and ensured that they are appropriately disabled or terminated according to the manufacturer’s instructions.
• Tests will be performed to verify that disabling unused functions does not affect overall system behavior.
7.3 VERIFICATION DATA
Verification data will include the identification and description of evidence produced as a result of the hardware verification process. This encompasses test cases, test procedures, and test results managed in accordance with the PL HCMP-001-0002 Hardware Configuration Management Plan within the QDMS.
The verification data will detail the outcomes of verification activities, including which hardware requirements were validated and the extent of their successful verification. An index will be provided within the Hardware Test Results document to reference all test cases, procedures, results, checklists, and analysis outcomes.
7.4 HARDWARE PLANNING PROCESS VERIFICATION ACTIVITIES AND DATA
Planning process activities include:
- The hardware design life cycle process, including transition criteria, if applicable, and the inter-relationships between the individual processes such as their sequencing and feedback mechanisms, should be defined.
- The proposed design methods should be defined and explained. This includes consideration of the expected hardware design and rationale of the proposed verification methods.
- If any hardware design standards are to be used for the project, including acceptable deviations from the standards should be identified. These may range from generic quality standards to company or program specific standards.
The verification activities for the Planning phase will be performed as shown in Table 9.
Table 9 Hardware Planning Verification Activities
Phase Entry Criteria V&V Activities V&V artifact V&V Tools CM storage Exit Criteria
Planning • Hardware Management Plans controlled in CM
• Hardware Management Plan review checklists controlled in CM. Review Hardware Management Plans with checklist • PHAC checklist
HDP checklist
• HVP checklist – verification
• HVP checklist – validation
• HPAP checklist
• HCMP checklist Word
Excell
Doors
Checklists controlled in CM Hardware Management plans updated
• Reviews complete; all review comments dispositioned
7.4.1 Hardware Planning Process Inputs
• Technical Requirements
• Deadline
7.4.2 Hardware Planning Process Reviews and Analyses
After initial hardware planning process is done, it will be reviewed and analyzed. This review and analysis will include why this process is done, who will be involved, what is sought, how it will be done, and when it will be considered complete.
7.5 HARDWARE REQUIREMENTS VERIFICATION ACTIVITIES AND DATA
The verification activities for the Requirements Capture phase will be performed as shown in Table 10 Hardware Requirements Verification Activities.
Table 10 Hardware Requirements Verification Activities
Phase Entry Criteria V&V Activities V&V artifact V&V Tools CM storage Exit Criteria
Requiremet Capture • Hardware Requirements Document controlled in CM
• Hardware Requirements Document review checklist Review Hardware Requirements Document with review sections Hardware Requirements Document review sections Excel
DOORS
Hardware Requirements Document review checklist controlled in CM Reviews complete
All review comments dispositioned
Audits complete
7.5.1 Hardware Requirements Process Verification Objectives
The objectives for the requirements process are:
• Requirements are identified, defined and documented. This include allocated requirements from the PSSA and derived requirements from the hardware safety assessment.
• Derived requirements produced are fed back to the appropriate process
• Requirement omissions and errors are provided to the appropriate process for resolution.
7.5.2 Hardware Requirements Process Inputs
Hardware Requirements Process Input will be used as follows;
• System Level Requirement
• Project Management
• Tools
• Safety
• CM
It will be recorded hardware requirements document in CM and review checklist document.
7.5.3 Hardware Requirements Process Reviews and Analyses
The Systems Engineering Team will review the hardware requirements and associated trace data that have been produced for initial release or subsequently updated. The reviewer can elect to review the requirements and associated trace data in the DOORS tool environment or they can review the data exported to the CM.
The requirements review should be performed as soon as the development team has produced a baselined set. The review checklist will be clearly indicating the source of the data reviewed. The hardware requirements and associated checklist are retrieved from the CM. The checklist and review process used is discussed in the Review section of this document. Independence audit and review will be recorded and applied by QAE (Quality Assurance Engineers). It can be found in HPAP (Hardware Process Assurance Plan - PL-HPA-001-0002). The review is considered complete when all review comments are dispositioned and incorporated to the satisfaction of the reviewer. Any unresolved comments will be documented on a problem report for disposition by the CCB (Configuration Control Board) in accordance with the HCMP (Hardware Configuration Management Plan) change review process.
Requirement Analysis action will be realized specific to requirements by the System Engineers. They will be implemented Validation Report.
7.6 HARDWARE DESIGN PROCESS VERIFICATION ACTIVITIES AND DATA
The verification activities for the Design phase will be performed as shown in Table 11 Design Phase Verification.
Table 11 Design Phase Verification
Phase Entry Criteria V&V Activities V&V artifact V&V Tools CM storage Exit Criteria
Design - Requirements valid and complete
- Hardware Design Data controlled in CM
- Hardware Plan Process valid and complete Review Hardware Design data with review section checklist Hardware Design Data review checklist
completed - MS Office
- Design Tools
- DOORS
- Analysis and Simulation Tools
- Hardware Design data review checklist controlled in CM - Reviews complete
- All review comments dispositioned
7.6.1 Hardware Design Process Verification Objective
The Hardware design process verification objectives are:
- The design is developed from the hardware item requirements.
- Derived requirements are fed back to the conceptual design process or other appropriate process.
- Requirement omissions or errors are provided to the appropriate processes for resolution.
7.6.2 Hardware Design Process Inputs
Hardware Design Process Input will be include as follows:
• System Requirements
• System Architecture
• Hardware Requirements
• Safety Requirements
• Environmental Requirements
7.6.3 Hardware Design Process Reviews and Analyses
Related Quality Assurance Engineers and Hardware Design Engineers will review the Hardware Design Data that has been produced or subsequently updated. The review checklist will be clearly indicating the source of the data reviewed. The Hardware Design Data and associated checklist are retrieved from the CM. The review process used is discussed in the Review section of this document. The review is considered complete when all review comments are dispositioned and incorporated to the satisfaction of the reviewer. Any unresolved comments will be documented on a problem report for disposition by the CCB in accordance with the HCMP change review process.
7.7 HARDWARE IMPLEMENTATION VERIFICATION PROCESS ACTIVITIES AND DATA
The verification activities for the Implementation phase will be performed as shown in Table 12.
Table 12 Hardware Implementation Verification Activities
Phase Entry Criteria V&V Activities V&V artifact V&V Tools CM storage Exit Criteria
Implementation - Hardware Requirements Document controlled
- Design valid complete
- Hardware Process valid complete until this process
- Tools and units when using the implementation process will be ready. - Create electrical test cases for all requirements that describe pin level behaviour
- Create simulation test benches for test cases
- Create electrical test procedures for device tests
- Create trace data for requirements to test case(s)
- Create trace data for test case(s) to test procedure(s) - Hardware Verification Cases and Procedures
- Completed test case review section
- Completed test procedure/bench review section
- Dry run simulation results
- Dry run device test results - Simulation tool
- In-circuit electrical test equipment
- Word
- Excel Hardware Design data review controlled in CM Hardware Verification Cases and Procedures released through CM
7.7.1 Hardware Implementation Process Verification Objectives
The objectives of the implementation process are:
• A hardware item is produced which implements the hardware detailed design using representative manufacturing processes.
• The hardware item implementation, assembly and installation data are complete.
• Derived requirements are fed back to the detailed design process or other appropriate process.
• Requirement omissions and errors are provided to the appropriate processes for resolution.
7.7.2 Hardware Implementation Process Inputs
The implementation process uses the detailed design data to produce the hardware item that is an input to the testing activity.
7.7.3 Hardware Implementation Process Reviews and Analyses
The Verifier/Validator will produce or update test procedures for device testing. The test procedures will be dry run and debugged by the test procedure author. Test procedure dry run results will be stored in the CM. The test procedures are managed with the CM. After the test procedures are reviewed and updated, they are referenced from the Hardware Test Procedures document. The Hardware Test Procedures document is released when a formal baseline is created.
The Verifier/Validator will review the test procedures and the dry run test results that have been produced or subsequently updated. The review checklist should clearly indicate the source of the data reviewed. The test procedures and associated checklist are retrieved from the CM. The checklist and review process used is discussed in the Review section of this document. Independent review will be conducted as indicated in the Verification Independence section of this document. The review is considered complete when all review comments are dispositioned and incorporated to the satisfaction of the reviewer. Any unresolved comments will be documented on a problem report for disposition by the CCB in accordance with the HCMP change review process.
7.8 HARDWARE TESTING VERIFICATION ACTIVITIES AND DATA
The verification activities for the test phase will be performed as shown in table 13.
Table 13 Hardware Testing Verification Activities
Phase Entry Criteria V&V Activities V&V artifact V&V Tools CM storage Exit Criteria
Testing • Hardware Test Procedures released through CM
• Test equipment set up • Perform device electrical tests
• Review test result with checklist
• Device test result
• Problem reports for test failures
• Complete checklist
• In-circuit electrical test equipment
• Word
• Excel • Device test result in CM
• Problem reports in CM
• Test result review checklist • Test complete
• Problem reports dispositioned thru CCB
• Hardware Verification Report released through CM
7.8.1 Hardware Testing Verification Objectives
The objectives of the testing process are:
- The test is completed according to test procedure by the Verifier/Validator
- Any unresolved comments or test failures reports are dispositioned by the CCB
- Hardware Verification Report document is released through CM.
7.8.2 Hardware Testing Inputs
The testing process uses the hardware test procedures and test equipment set up that is an input to the testing activity.
7.8.3 Hardware Testing Reviews and Analyses
The Verifier/Validator will run the test benches and test procedures for credit. Test for credit may commence after Process Assurance has audited the configuration of the test equipment and the test benches/procedures to ensure that the correct version of the tests are being run. Test for credit will use formally released test benches and test procedures.
The Verifier/Validator will review the test results from the hardware tests. The review checklist should clearly indicate the source of the data reviewed. The test results and associated checklist are retrieved from the CM. The checklist and review process used is discussed in the Review section of this document. Independent review will be conducted as indicated in the Verification Independence section of this document. The review is considered complete when all review comments are dispositioned and incorporated to the satisfaction of the reviewer. Any unresolved comments or test failures will be put on a problem report for disposition by the CCB in accordance with the HCMP change review and problem reporting process.
After the test results are reviewed, they are referenced from the Hardware Test Report document. The Hardware Test Report document is released when a formal baseline is created.
7.8.4 Hardware Test Execution
Test execution involves following the defined test procedures and executing them on the actual hardware. This step produces real-world results that verify the behavior of the hardware. During test execution, anomalies or unexpected behaviors may be discovered and documented for further analysis and resolution.
7.8.5 Process-Specific Activities
7.8.5.1 Test Procedure Development
Test procedure development involves crafting step-by-step instructions on how to execute the defined test cases. These instructions detail the necessary setup, inputs, actions to be taken, and expected results. The goal is to create clear and repeatable procedures that testers can follow to execute the tests.
7.8.5.2 Test Procedure Verification
Test procedure verification ensures that the developed test procedures accurately represent the corresponding test cases. This includes reviewing the procedures for clarity, correctness, and alignment with the intended tests. The verification process aims to identify any discrepancies or errors in the test procedures.
7.8.5.3 Testing Environment
The testing environment includes the hardware tools, and resources necessary to execute the test procedures. This environment should be representative of the intended operational conditions of the hardware. Verification of the testing environment ensures that it accurately simulates the intended operational environment.
7.8.5.4 Test Results Verification
Test results verification involves reviewing the outcomes of the test execution to ensure they match the expected results. Any discrepancies or deviations from expected behavior are investigated, documented, and potentially addressed through design adjustments or corrective actions.
7.9 PRODUCTION TRANSITION PROCESS VERIFICATION ACTIVITIES AND DATA
The verification activities for the production transition phase will be performed as shown in Table 14.
Table 14 Hardware Testing Verification Activities
Phase Entry Criteria V&V Activities V&V Artifact V&V Tools CM storage Exit Criteria
Production Transition • Hardware Accomplishment summary controlled in CM
• Hardware Configuration Index controlled in CM
• Implementation result valid and complete • Review HAS, HECI and HCI with checklist • HCI checklist
• HECI checklist
• HAS checklist • Work
• Excel • Checklists • Reviews complete; all review comments dispositioned
7.9.1 Production Transition Process Verification Objectives
The objectives of this process are:
• A baseline is established that includes all design and manufacturing data needed to support the consistent replication of the hardware item
• Manufacturing requirements related to safety are identified and documented and manufacturing controls are established.
• Derived requirements are fed back to the implementation process or other appropriate processes.
• Errors and omissions are provided to the appropriate processes for resolution.
7.9.2 Production Transition Process Inputs
In this process, manufacturing data, test facilities and general resources should be examined to ensure availability and suitability for production. The production transition process uses the outputs from the implementation and verification processes to move the product into production.
7.9.3 Production Transition Process Reviews and Analyses
The Verifier/Validator will review the Hardware Accomplishment Summary, Hardware Configuration Index and Hardware Environment Configuration Index that have been produced for initial release or subsequently updated. The Hardware Configuration Index and Hardware Environment Configuration Index may be separate or combined documents. For the review of the initial release of the documents, all documents must be controlled in the CM prior to the review so that consistency in the documents can also be verified. The hardware documents and associated checklists are retrieved from the CM. The checklist and review process used is discussed in the Review section of this document. Independent review will be conducted as indicated in the Verification Independence section of this document. The review is considered complete when all review comments are dispositioned and incorporated to the satisfaction of the reviewer. Any unresolved comments will be documented on a problem report for disposition by the CCB in accordance with the HCMP change review process.
8 VERIFICATION INDEPENDENCE
• The Verificaition/Validation Team performs review, analysis or tests on the outputs created by the Development Team.
• The Verificaition/Validation Team also performs reviews of the test procedures, analyses and test results produced within the team.
• All review of Verification/Validation Team work product will be performed by a person other than the author of the work product to ensure sufficient independence.
• Independence is also established by review of the Development Team work products by the Verification/Validation Team.
• Designer created test benches can be used for formal credit, if and only if, the test benches are requirements based, traced to requirements and independently reviewed by the Verification/Validation Team.
9 VERIFICATION ENVIRONMENT
9.1 Tools
Verification tools are given in Table 9, Table 10, Table 11, Table 12, Table 13 and table 14.
9.1.1 Qualification of Verification Tools
The hardware verification process requires the qualification of design and verification tools to ensure their suitability and effectiveness. This section outlines the qualification process for verification tools in accordance with DO-254 standards. The qualification activities will include establishing operational requirements for each tool and developing a comprehensive set of test cases to verify their compliance. The qualification test cases and results will be documented to demonstrate the suitability and effectiveness of the tools in the verification process.
9.1.2 Test Procedure Structure
Test procedure structure is explained in section 7.1.2.1 Test Procedure.
10 ORGANIZATIONAL RESPONSIBILITIES
10.1 RESPONSIBILITIES
Technical management is responsible for organising hardware verification and validation activities, the definition of hardware verification and validation, and the allocation of staff to those roles. Responsibilities are defined in PL-DO-001-0003 Design Organisation Interface Document.
The Verification/Validation Team responsibilities are as follows:
• The Verification/Validation Team will complete the review checklists
• The Verification/Validation Team will perform the validation activities
• The Verification/Validation Team will perform the review activities
• The Verification/Validation Team will perform the analysis activities
• The Verification/Validation Team will perform the test activities
• The Configuration Management team will control and release any data in accordance with the Hardware Configuration Management Plan
• The Configuration Management team will review and process and Problem Reports generated by the Verification/Validation Team in accordance with the Hardware Configuration Management.”
Bu HVVP dokumanı. Aşağıdaki de Hardware design plan dokumanı. (HDP)
“Table of Contents
- GENERAL 1
1.1. Purpose 1
1.2. Scope 1
1.3. Responsibilities 1
1.4. Team Member Responsibilities 1
1.5. Applicable And Reference Documents 1
1.5.1. Applicable Documents 1
1.5.2. Reference Documents 2
1.6. Acronyms, Abbreviations and Symbols 2
- HARDWARE DESIGN LIFECYCLE 6
2.1. Hardware Design Standard 6
2.2. Hardware Archive Standard 6
2.3. Hardware Validation and Verification Standard 6
2.4. Hardware Requirement Standard 7
2.5. Validation and Verification Process 7
2.5.1. Objectives 7
2.5.2. Validation Process 7
2.5.3. Validation Process Objectives 7
2.5.4. Validation Process Activities 7
2.5.5. Verification Process 8
2.5.6. Validation and Verification Methods 8
2.6. Configuration Management Process 8
2.7. Process Assurance 8
2.8. Certification Liaison Process 9
2.8.1. Communication Channels 9
2.8.2. Documentation Exchange 9
2.8.3. Review Meetings 9
2.8.4. Issue Resolution 9
2.9. Means of Compliance and Planning 9
2.10. Compliance Substantiation 9
2.10.1. Certification Authority Reviews 10
2.10.2. Document Submission 10
2.10.3. Additional Document Submission 10
2.11. V-Model Development Approach 10
2.12. Relationship Between Processes and Activities 11
2.13. Means of Providing Feedback 12
2.13.1. Regular Meetings and Communication Channels 13
2.13.2. Common Data and Document Sharing Platforms 13
2.13.3. Change Management and Version Control Systems 13
2.13.4. Error Tracking and Query Systems 13
2.13.5. Risk Management and Analysis Tools 13
2.14. Planning Process 13
2.14.1. Planning Process Objectives 13
2.14.2. Planning Process Inputs 14
2.14.3. Planning Process Outputs 14
2.14.4. Planning Process Activities 14
2.14.5. Planning Process Tools Usage 15
2.14.6. Planning Process Transition Criteria 15
2.15. Development Flow Diagrams 15
2.15.1. Analog Hardware Development Flow 15
2.15.2. Complex Hardware Development Flow 15
2.16. Requirements Capture Process 15
2.16.1. Requirements Capture Process Objectives 16
2.16.2. Requirements Capture Process Inputs 16
2.16.3. Requirements Capture Process Outputs 17
2.16.4. Requirements Capture Process Activities 17
2.16.5. Requirements Capture Process Tool Usage 17
2.16.6. Requirements Capture Process Transition Criteria 17
2.17. Conceptual Design Process 18
2.17.1. Conceptual Design Process Objectives 18
2.17.2. Conceptual Design Process Inputs 18
2.17.3. Conceptual Design Process Outputs 18
2.17.4. Conceptual Design Process Activities 19
2.17.5. Conceptual Design Process Tools Usage 19
2.17.6. Conceptual Design Process Transition Criteria 19
2.18. Detailed Design Process 19
2.18.1. Detailed Design Process Objectives 20
2.18.2. Detailed Design Process Inputs 20
2.18.3. Detailed Design Process Outputs 20
2.18.4. Detailed Design Process Activities 21
2.18.5. Detailed Design Process Tools Usage 21
2.18.6. Detailed Design Process Transition Criteria 21
2.19. Implementation Process 22
2.19.1. Implementation Process Objectives 22
2.19.2. Implementation Process Inputs / Outputs 22
2.19.3. Implementation Design Process Activities 23
2.19.4. Implementation Process Tools Usage 23
2.19.5. Implementation Process Transition Criteria 23
2.20. Production Transition Process 24
2.20.1. Production Transition Process Objectives 24
2.20.2. Production Transition Process Inputs 24
2.20.3. Production Transition Process Outputs 24
2.20.4. Production Transition Process Activities 24
2.20.5. Production Transition Process Tools Usage 25
2.20.6. Production Transition Process Transition Criteria 25
List of Tables
Table 1 Applicable Documents 1
Table 2 Reference Documents 2
Table 3 Definitions 2
Table 4 Abbreviations 5
Table 5 Planning Process Activities 15
List of Figures
Figure 1 V Model Development Approach 10
Figure 2 Relationship between process and activities 12
Figure 3 Implementation Process Input / Output 22
Figure 4 Hardware Design Process Flow Graph 28
- GENERAL
1.1. Purpose
The purpose of this document is establishing the hardware development approach, methodologies, tools and procedures to be used during the design, implementation, verification, validation and production transition of the battery hardware for Battery System under the Electrical Power System of Heavy Class Attack Helicopter Project.
1.2. Scope
This plan defines the approach for the hardware design plan for 28VDC Battery System for the Heavy Class Attack Helicopter Project.
1.3. Responsibilities
Responsibilities are defined in PL-DO-001-0003 Design Organisation Interface Document.
1.4. Team Member Responsibilities
Team Members for the project and their responsibilities are described in “PL-DO-001-0003 Design Organisation Interface Document”.
1.5. Applicable And Reference Documents
1.5.1. Applicable Documents
Table 1 Applicable Documents
Document No Title
1 BL-SD-001-0002 28VDC Battery System Description Document
2 PL-PHA-001-0004 Plan for Hardware Aspects of Certification 28 VDC Battery
3 PL-HVVP-001-0002 Hardware Validation and Verification Plan
4 PL-DO-001-0003 Design Organisation Interface Document
5 PL-PM-001-011 Project Management Plan
6 PL-HCM-001-0002 Hardware Configuration Management Plan
7 PR-AV-001 Design Procedure (Aviation)
8 PR-AV-003 Safety, Reliability, Maintainability, Testability Management Procedure
9 PR-AV-007 Hardware Design Standards
10 PR-AV-008 Hardware Requirement Standard
11 RP-SSA-001-0001 Preliminary System Safety Assessment
12 PL-HPA-001-0002 Hardware Process Assurance Plan
13 PR-AV-009 Hardware Validation and Verification Standard
14 PR-AV-010 Hardware Archive Standard
1.5.2. Reference Documents
Table 2 Reference Documents
Document No Title
1 RTCA/DO-254 Design Assurance Guidance for Airborne Electronic Hardware
2 MIL-HDBK-516C Airworthiness Certification Criteria
1.6. Acronyms, Abbreviations and Symbols
Definitions are shown in following table.
The following acronyms and abbreviations may have been used in this document.
Table 4 Abbreviations
Abbreviation Explanation
AE ASPİLSAN Energy
CDR Critical Design Review
CM Configuration Management
COTS Commercial Off-The-Shelf
EPS Electrical Power System
FPGA Field Programmable Gate Array
HCMP Hardware Configuration Management Plan
HDP Hardware Design Plan
HPAP Hardware Process Assurance Plan
HVVP Hardware Validation Verification Plan
LRU Line-Replaceable Unit
QDMS Quality Document Management System
PCB Printed Circuit Board
PCBA Printed Circuit Board Assembly
PDR Preliminary Design Review
PHAC Plan for Hardware Aspect of Certification
RTL Register Transfer Level
RVTM Requirements Verification Traceability Matrix
SEH Simple Electronic Hardware
- HARDWARE DESIGN LIFECYCLE
2.1. Hardware Design Standard
Hardware design standards will be used during the conceptual design process and detailed design process to define the rules, procedures, methods, guidance and criteria for developing and specifying the hardware design. Details given in the PR-AV-007 Hardware Design Standard document.
2.2. Hardware Archive Standard
Hardware archive standards will be used to define the procedures, methods and criteria used to retain and archive product data and develop and maintain program and project archives. Details given in the PR-AV-010 Hardware Archive document.
2.3. Hardware Validation and Verification Standard
Hardware validation and verification standards will be used during the validation and verification processes to define the rules, procedures, methods, guidance and criteria for validating and verifying the hardware design and implementation. Details given in the PR-AV-009 Hardware Validation and Verification Standard document.
2.4. Hardware Requirement Standard
Hardware Requirements standards will be used during the requirements capture process to define the rules, procedures, methods, guidance and criteria for developing the requirements. Details given in the PR-AV-008 Hardware Requirement Standards document.
2.5. Validation and Verification Process
2.5.1. Objectives
The validation process provides assurance that the hardware item derived requirements are correct and complete with respect to system requirements allocated to the hardware item. PL-HVVP-001-0002 The Hardware Validation and Verification Plan (HVVP) outlines the verification activities necessary to validate that the 28VDC Battery hardware satisfies functional, safety, and performance requirements. It ensures compliance with the designated hardware plans and standards throughout the development process.
2.5.2. Validation Process
The validation process is intended to ensure that the derived requirements are correct and complete with respect to the system requirements allocated to the hardware item through the use of a combination of objective and subjective processes.
2.5.3. Validation Process Objectives
The objectives of the validation process for derived hardware requirements are:
• Derived hardware requirements against which the hardware item is to be verified are correct and complete.
• Derived requirements are evaluated for impact on safety.
• Omissions and errors are fed back to the appropriate processes for resolution.
2.5.4. Validation Process Activities
Validation Process Activities are explained in the PL-HVVP-001-0002 The Hardware Validation and Verification Plan document.
2.5.5. Verification Process
The verification process provides assurance that the hardware item implementation meets the requirements. Verification consists of reviews, analyses and tests applied as defined in the PL-HVVP-001-0002 The Hardware Validation and Verification Plan (HVVP) plan document.
2.5.5.1. Verification Process Objectives
The objectives of the verification process are:
• Evidence is provided that the hardware implementation meets the requirements.
• Traceability is established between hardware requirements, the implementation, and the verification procedures and results.
• Acceptance test criteria are identified, can be implemented and are consistent with the hardware design assurance levels of the hardware functions.
• Omissions and errors are fed back to the appropriate processes for resolution.
2.5.5.2. Verification Process Activities
Verification Process Activities are explained in the PL-HVVP-001-0002 The Hardware Validation and Verification Plan document.
2.5.6. Validation and Verification Methods
Validation and Verification methods are explained in the PL-HVVP-001-0002 The Hardware Validation and Verification Plan document.
2.6. Configuration Management Process
The Hardware Configuration Management Process information is included in the PL-HCM-001-0002 Hardware Configuration Management Plan.
2.7. Process Assurance
The Process Assurance information is included in the PL-HPA-001-0002 Hardware Process Assurance Plan.
2.8. Certification Liaison Process
The purpose of the certification liaison process is to establish communication and understanding between the applicant and the certification authority throughout the hardware design life cycle to assist in the certification process.
2.8.1. Communication Channels
The channels of communication for regular updates, inquiries, and discussions between the applicant and the certification authority will be specified. These will include email, meetings, teleconferences, and document sharing platforms.
2.8.2. Documentation Exchange
The process for exchanging documentation and information between the applicant and the certification authority will be described. The format, frequency, and content of reports, submissions, and requests for information will be specified.
2.8.3. Review Meetings
The frequency and format of review meetings between the applicant and the certification authority to discuss progress, milestones, and any issues or concerns related to the hardware design will be outlined.
2.8.4. Issue Resolution
The process for resolving any issues or discrepancies identified during the certification process will be detailed. The steps for documenting, tracking, and closing out issues in a timely manner will be specified.
2.9. Means of Compliance and Planning
The Plan for Hardware Aspects of Certification (PL-PHA-001-0004) for the 28VDC Battery defines the means of compliance of how the hardware for the 28VDC Battery will satisfy the certification basis. The PHAC also defines the hardware levels as determined by the system safety analysis process.
2.10. Compliance Substantiation
The substantiation of compliance will follow the steps outlined below:
2.10.1. Certification Authority Reviews
Necessary documents and data will be provided for the reviews conducted by the certification authority.
2.10.2. Document Submission
Documents required to confirm the hardware’s compliance will be submitted to the certification authority. These documents will include the “Hardware Accomplishment Summary (HAS) and Top Level Drawing.
2.10.3. Additional Document Submission
Other compliance data or evidence requested by the certification authority will be submitted.
2.11. V-Model Development Approach
Design progress will be in line with and ARP4754 (Guidelines for Development of Civil Aircraft and Systems) and V-Model development life cycle progress will be applied. Sub-systems design will be in line with DO-254 (Design Assurance Guidance for Airborne Electronic Hardware).
Figure 1 V Model Development Approach
The objective of the design and development process is to deliver ASPİLSAN Energy product’s design meeting the certification requirements and customer needs and ready for installation on the aircraft by meeting objectives on safety, reliability, quality, costs and schedule. Design Process is started either a request received from customer or a decision taken internally in ASPİLSAN Energy. When the design activity is started because of customer request, as required a business proposal will be prepared and a contract is signed by both Customer and ASPİLSAN Energy. Request by Customer can be received in any way such as e-mail, telephone, fax or formal requests. Design need might be any improvement/modification to existing product or a new product design.
2.12. Relationship Between Processes and Activities
Relationship Between Process and Activities are given following figure.
Figure 2 Relationship between process and activities
2.13. Means of Providing Feedback
This section outlines methods to facilitate feedback and interaction between hardware, system, and software processes throughout the design lifecycle. Essential mechanisms will include:
2.13.1. Regular Meetings and Communication Channels
Software, hardware and systems teams will schedule meetings via the Outlook email system and ensure ongoing updates, encouraging ongoing dialogue between teams.
2.13.2. Common Data and Document Sharing Platforms
JIRA, SVN and QDMS systems will be utilized as the shared data and document sharing platform for inter-team collaboration.
2.13.3. Change Management and Version Control Systems
Change management and version control processes will be conducted through the JIRA system. Further details are provided in the PL-HCM-001-0002 Hardware Configuration Management Plan document.
2.13.4. Error Tracking and Query Systems
All aspects of tracking design errors, version controls, change requests, and modification processes will be conducted through the JIRA system.
2.13.5. Risk Management and Analysis Tools
Integration of tools facilitates proactive identification and mitigation of risks.
By specifying these mechanisms, effective feedback and interaction are ensured among hardware, system, and software processes, fostering collaboration and efficiency throughout the lifecycle. Details regarding risk management and analysis tools will be conducted according to the " PR-AV-003 Safety, Reliability, Maintainability, Testability Management Procedure " document.
2.14. Planning Process
This Process describes how to determine the work plan including what resources are needed for the project.
2.14.1. Planning Process Objectives
• Hardware design life cycle processes are defined.
• Standards to be held to are selected and defined.
• The hardware development and verification environments are selected or defined.
• The means of compliance of the hardware design assurance objectives proposed to the certification authority.
2.14.2. Planning Process Inputs
• Technical Requirements
• Deadline
2.14.3. Planning Process Outputs
• Design Plan
• Project Schedule
• Technical Team Organizational Chart
• Project Management Plan
• Risk Matrix
• Hardware Configuration Management Plan
2.14.4. Planning Process Activities
Hardware Planning Process establishes the foundation for resource utilization and personnel assignments. During this process, the hardware development and integral activities are defined, and additional considerations are addressed.
Entry criteria, activities, tools, outputs and exit criteria of the Hardware Planning Process are shown in the following table.
Table 5 Planning Process Activities
Entry Criteria Activities Tools Outputs HCM Storage Exit Criteria
• Project costs, schedule, resources approved
• Certification basis and CRIs defined based on related Standards
• System architecture is defined
• Peer review records available
• Problem reports written to update plans or standards • Prepare or update hardware plans and hardware standards • Word
• Excel
• PowerPoint
• JIRA
• PHAC
• HDP
• HVVP
• HPAP
• HCMP
• PHAC and HCMP released
• HDP, HVP, HPAP, HCMP controlled in CM
• Hardware plans released
• Hardware standards released
2.14.5. Planning Process Tools Usage
Planning process tools are given Table 5.
2.14.6. Planning Process Transition Criteria
Planning process transition criteria is given Table 5.
2.15. Development Flow Diagrams
2.15.1. Analog Hardware Development Flow
Development flow is as in Figure 2.
2.15.2. Complex Hardware Development Flow
Complex Hardware development plan will be described in PHAC if the design is complex.
2.16. Requirements Capture Process
Requirement capture process will be covered mainly following types of requirements (as described in SAE-ARP 4754A);
• Safety Requirements
• Functional Requirements
• Customer Requirements
• Operational Requirements
• Product Specifications Requirements
• Performance Requirements
• Interface Requirements
• Physical and Installation Requirements
• Maintainability Requirements
• Environmental Test Requirements
• Human Factor Requirements
• Additional Certification Requirements
• Derived Requirements
• Re-use of Existing Certificated Systems and Items
• Integrated Logistic Support Requirements
2.16.1. Requirements Capture Process Objectives
Requirement capture process objectives are:
• Requirements are identified, defined and documented. This includes allocated requirements from the PSSA and all requirements from the System Safety Assessment.
• Derived requirements produced are fed back to the system safety process.
• Requirement omissions and errors are provided to the appropriate process for resolution.
2.16.2. Requirements Capture Process Inputs
• Hardware Design Plan. (This Document)
• Hardware Requirement Standard
• Baselined System Requirements
• Safety Requirements from “RP-PSSA-001-0001 Preliminary System Safety Assessment”
• System Architecture
2.16.3. Requirements Capture Process Outputs
• Requirements baseline export
• Hardware Requirements Document
• Problem report for upper level requirement errors and omissions.
2.16.4. Requirements Capture Process Activities
• Analyzing the requirements functionality and architectural considerations
• Documentation of the hardware requirements from “RP-PSSA-001-0001 Preliminary System Safety Assessment” process.
• Defining derived requirements for implementation purposes, including low-level requirements.
• Feeding back the derived requirements to SSA defined
• Documenting all data related to the requirements capture process, including low-level requirements.
• Providing the requirement omissions and errors to “PR-AV-008 Hardware Requirement Standard”.
• Identifying and tracing all requirements, including low-level requirements, to higher-level requirements in the DOORS platform.
2.16.5. Requirements Capture Process Tool Usage
Requirements capture process tools are listed below.
• Word
• Excel
• DOORS
2.16.6. Requirements Capture Process Transition Criteria
• System functions are released.
• Hardware functions are released.
• RVTM is released.
2.17. Conceptual Design Process
The conceptual design process generates a high-level design concept that can be evaluated to determine the likelihood that the final design implementation will satisfy the requirements. The conceptual design documents are defined in PHACs and the configuration of these documents is kept according to the " PL-HCM-001-0002 Hardware Configuration Management Plan”.
The conceptual design process will be carried out accordance with DO-254.
2.17.1. Conceptual Design Process Objectives
The conceptual design objectives are:
• The conceptual design of the hardware item is developed in accordance with its requirements.
• Derived requirements produced are processed as described in “Requirement Capture”.
• Requirement omissions and errors are processed as described in “Requirement Capture”.
2.17.2. Conceptual Design Process Inputs
Conceptual design process inputs are summarized in the below.
• Hardware Design Plan (This document)
• Hardware Configuration Management Plan
• Equipment Requirements Document
• Hardware Requirements Document
• Peer review records available
• Problem reports written to update conceptual design
2.17.3. Conceptual Design Process Outputs
Conceptual design process outputs are summarized in the below.
• Block diagrams
• Architecture descriptions
• Mechanical sketches
2.17.4. Conceptual Design Process Activities
Conceptual design process activities are summarized in the below.
• Create or update top level representation of the design,
• Functional elements mapped to circuit elements,
• Identify errors or omissions in upper level requirements.
2.17.5. Conceptual Design Process Tools Usage
Conceptual design process tools are listed below.
• Word
• Excel
• PowerPoint
• Jira
• Draw.io
2.17.6. Conceptual Design Process Transition Criteria
• Conceptual design released
• Design architecture released,
• Requirements updated,
• Updated RVTM released
• Conceptual design related documentations released
2.18. Detailed Design Process
The detailed design process produces a detailed design concept that may be assessed to determine the potential for the resulting design implementation to meet the low-level requirements. This may be accomplished using such items as functional block diagrams, design and architecture descriptions, circuit card assembly outlines, and chassis sketches.
The detailed design process will be carried out accordance with DO-254.
2.18.1. Detailed Design Process Objectives
The detailed design objectives are:
• The hardware item detailed design is developed consistent with its high-level requirements and conceptual design data.
• Derived requirements produced are fed back to the conceptual design or other appropriate processes.
• Requirement omissions and errors are provided to the appropriate processes for resolution.
2.18.2. Detailed Design Process Inputs
Detailed design inputs are:
• Hardware functions
• System requirements and derived hardware requirements
• Hardware interfaces
• System architecture
• Hardware architecture
• Hardware architecture rationale
• Hardware constraint
2.18.3. Detailed Design Process Outputs
Detailed design process outputs are summarized in the below.
• Hardware design data
o Design diagram
o Schematic
o Circuit design and layout constraints
o Bill of materials
o Assembly drawings
• Acceptance test criteria
• Problem report for high level requirements errors or omissions
2.18.4. Detailed Design Process Activities
Detailed design process activities are summarized in the below.
• Create or update circuit elements for all functional elements,
• Create hardware design
• Optimize hardware design
• Create or update trace data for all circuit elements
• Define hardware constraints
• Select components in accordance with the ECMP
• Test methods and hardware-software interface data
• An assessment of unused functions will be performed to identify potential effects on safety. Adverse effects will be addressed in test reports.
• Architectural design techniques should be implemented as necessary. These may include establishing safety monitors for proper functionality, dissimilarity between function and safety monitors, preclusion of a design error from impacting safety, and fault tolerant designs.
• Derived requirements produced during the detailed design process will be fed back to the conceptual design or other appropriate processes.
• Requirement omissions and errors discovered during the detailed design process will be provided to the appropriate process for resolution.
2.18.5. Detailed Design Process Tools Usage
Detailed design process tools are listed below.
• Altium
• Word
• Excel
• Simulation tools
2.18.6. Detailed Design Process Transition Criteria
• Detailed design released,
• Hardware Design Data released,
• Requirements updated,
• Updated RVTM released,
• Detailed design related documentations released
• Acceptance Test Criteria defined
2.19. Implementation Process
2.19.1. Implementation Process Objectives
The purpose of the Implementation process is to create or fabricates a system element conforming to that element’s detailed description. The element is constructed ASPİLSAN Energy’s technologies and practices.
During the implementation process, engineers follow the requirements allocated to the system element to fabricate, code, or build each induvial element using specified materials, processes, physical or logical arrangements, standards, technologies and/or information flows outlined in detailed drawings or other design documentation.
2.19.2. Implementation Process Inputs / Outputs
Inputs and outputs for the requirement process are listed below.
Figure 3 Implementation Process Input / Output
2.19.3. Implementation Design Process Activities
The systems requirement process includes the following activities:
• Prepare for Implementation
o Define fabrication/coding procedures, tools and equipment
o Elicit from stakeholders, developers, and teammates any constraint imposed by implementation technology, strategy, or enabling systems.
o Document the plan
• Perform Implementation
o Develop data for training users on correct and safe procedures for operating and maintaining that element, either as a stand-alone end item or as part of a larger systems.
o Complete detailed product, process, material specifications
o Ensure the realization of the system element
o Prepare initial training capability and draft training documentation
o Prepare a hazardous materials log
o Determine the packaging
• Manage Results of Implementation
o Identify and record the results
o Record any anomalies
o Establish and maintain traceability
o Provide baseline for configuration management.
2.19.4. Implementation Process Tools Usage
Implementation process tools are listed below.
• Altium
• Word
• Excel
2.19.5. Implementation Process Transition Criteria
Implementation process transition criteria are listed below.
• Peer reviews complete, all issues resolved
• Assembly drawing
• Gerber files released
2.20. Production Transition Process
2.20.1. Production Transition Process Objectives
The objectives of this process are:
• A baseline is established that includes all design and manufacturing data needed to support the consistent replication of the hardware item.
• Manufacturing requirements related to safety are identified and documented and manufacturing controls are established.
• Derived requirements are fed back to the implementation process or other appropriate processes.
• Errors and omissions are provided to the appropriate processes for resolution.
2.20.2. Production Transition Process Inputs
Production transition process inputs are listed below.
• Completed development
• Assembly drawing
• Gerber files
• Production files
2.20.3. Production Transition Process Outputs
Production transition process outputs are listed below.
• Populated and tested printed circuit cards
• Hardware accomplishment summary (HAS)
• Problem Report for high level requirements errors or omissions
2.20.4. Production Transition Process Activities
Production transition process activities are listed below.
• Create hardware production.
• Create or update HAS through CM.
• Complete reviews.
• Identify errors or omissions in high level requirements.
2.20.5. Production Transition Process Tools Usage
Production transition process tools are listed below.
• Jira
• Word
• Excel
• Hardware production equipment
2.20.6. Production Transition Process Transition Criteria
• Peer reviews complete
• All issues resolved
• HAS released through CM
3. HARDWARE PRODUCT DESCRIPTION
System hardware block diagram and detailed design information will be found in BL-SD-001-0002 System Description Document and “PL-PHA-001-0004 Plan for Hardware Aspect of Certification 28 VDC Battery”.
3.1. 28 VDC Battery
“28 VDC Battery” is an LRU for Power Storage System of A/C EPS.
3.1.1. Hardware Specifications To Be Achieved
Specifications of the 28 VDC battery are specified in “BL-SD-001-0002 System Description Document” as requirements and related requirements are assigned to hardware in Hardware Requirement Document and detailed in “PL-PHA-001-0004 Plan for Hardware Aspect of Certification 28 VDC Battery”
3.1.2. Alternative Uses of 28 VDC Battery
There is no planned alternative use of 28 VDC Battery.
3.1.3. Planned Service Life for 28V VDC Battery
In order to extend the life of the product, the product will be designed to be used at the best possible performance and the terms of use and storage conditions will be communicated to the Customer to increase its performance. The hardware materials selected will be selected to provide the best possible lifespan, and the hardware will be optimized to provide the best lifespan.
3.1.4. Upgrade Considerations for 28V VDC Battery
Performance improvements and fixes of various hardware bugs for the 28V DC battery will be managed by creating hardware change requests (HCRs) using JIRA. Detailed information will be include about the management of this process in the “PL-HCM-001-0002 Hardware Configuration Management Plan” document.
4. HARDWARE DESIGN METHODS
Hardware design methods will be conducted according to the DO-254.
4.1. Design Policies And Standards
The design and development activities of the products are carried out according to “PR-AV-001 Design Procedure (Aviation)” and the following standards:
• Hardware Design Standard (PR-AV-007)
• Hardware Validation and Verification Standard (PR-AV-009)
• Hardware Requirement Standard (PR-AV-008)
4.2. Requirements Capture and Specification Methods
System requirements are the foundation of the system definition and form the main architecture, design, integration and verification. Each requirement carries cost and time. Thus, changes in requirements later in the development phase change have significant cost impact on the project, possible resulting in collation.
The hardware design process begins with a meticulous analysis of system and safety requirements. These requirements are captured through collaboration with system engineers, stakeholders, and domain experts. A combination of interviews, workshops, and document reviews is used to ensure a comprehensive understanding of functional, performance, and safety requirements. Captured requirements are documented using industry-standard formats and traceability tools, maintaining clear links between system and hardware requirements.
4.3. Conceptual Design
The conceptual design process involves establishing the foundational framework for the development of airborne electronic hardware. High-level architectural decisions, defining partitions and interfaces, addressing safety considerations, selecting appropriate technologies, and documenting these aspects rigorously are performed during conceptual design. This phase sets the direction for the hardware development process, ensuring that safety, reliability, and compliance requirements are integrated from the very beginning.
4.4. Detailed Design
The hardware design is taken from conceptual design to concrete, detailed specifications during detailed design process. Design improvements, reconsiderations, creating individual partitions, specifying interfaces, safety analysis and producing extensive documentations are performed during detailed design process. This phase ensures that the hardware is designed with precision and in alignment with DO-254’s stringent safety and quality requirements.
Figure 4 Hardware Design Process Flow Graph
4.5. Synthesis Techniques
Synthesible RTL, FPGA, logic design is not used in this project. This section is not applicable.
4.6. Implementation
Detailed design data is turned into functional hardware parts while sticking to safety and quality features during implementation process. Coding, layout design, component selection, configuration management, tool qualifications, timing closures and extensive documentations are performed in this process. This phase ensures that the hardware is realized with precision, meets performance targets, and fulfills the stringent safety requirements of DO-254 and the hardware is ready to be tested.
4.6.1. Architectural Mitigation Management for DAL A and DAL B Functions
If applicable, DAL A and DAL B functions are stated on PSSA and created FFPA report shows the sore points of the design. Considering the FFPA results, sore points in design will be resolved by one or more following methods:
• Design redundancy is provided via backup designs for the relevant function.
• Design fail tolerance is provided via improvements on the design.
• Fail safe designs is implemented for appropriate functions.
• COTS parts are replaced with equivalent parts with better MTBF and FIT values.
4.7. Production Transition
The production transition method involves a set of well-defined processes and procedures to ensure the smooth transition from hardware development to production. This phase includes reviews, documentation checks, production planning, configuration management, process validation, supplier control, and ongoing monitoring to guarantee that the produced hardware meets the safety and quality features.
-
HARDWARE DESIGN ENVIRONMENT
5.1. Hardware Development and Verification Tools
The software tools for hardware design is detailed in “PL-PHA-001-0006- Plan for Hardware Aspects of Certification 28 VDC Battery”.
A.E. uses following hardware tools for hardware design;
• DC Power Supply
• DC Electronic Load
• Oscilloscope
• Multimeter
• Thermal Camera etc.
5.2. Programming Languages
There is no programming language usage during hardware design process.
-
HARDWARE ITEM DATA
6.1. Hardware Design Data
Hardware Design data will be generated according to ASPİLSAN Energy design, configuration and quality procedures. These procedures have been reviewed to ensure alignment with the requirements of DO-254 for hardware design data. This includes maintaining traceability between system requirements and design outputs, implementing appropriate design verification methods (analysis, simulation, testing), and employing a robust configuration management system for all design data.
6.2. Design Documents and Files To Be Produced
6.2.1. Block Diagram of Design Architecture
This document contains general technical information about electrical design. Functions from System Description Documents (see Table 1) are assigned to units in this document.
6.2.2. Schematic Document
This document contains all the board level circuitry but not the board drawings.
6.2.3. PCB File
This file is created based on the information of schematic file. It contains all the PCB data, including electrical connections and component placements.
6.2.4. Gerber File
This file contains all the layer images of the PCB and mechanical holes such as; screw holes, through hole component holes, vias. The document is submitted to PCB manufacturer.
6.2.5. Pick & Place File
This file is produced to be submitted to PCBA responsible. The file contains component placement data for PCBA process.
6.2.6. Draftsman Document
There are two different draftsman document types created in AE.
6.2.6.1. PCB Manufacturing Draftsman
This document contains additional information about PCB manufacturing and is meant to be submitted to PCB manufacturer. The additional informations are listed below:
• PCB and silk screen color.
• PCB layer thicknesses.
• PCB material information.
• Panel information.
• Stencil information.
6.2.6.2. PCBA Draftsman
PCBA draftsman document is to be submitted to PCBA responsible and contains instructions for PCBA process.
-
ADDITIONAL CONSIDERATIONS
7.1. Use of Previously Developed Hardware
There is no previously developed for this project. This plan covers the new development approach of ASPİLSAN Energy for this project.
7.2. Interaction Among Processes
All design activities will be performed according to AE internal “Design Procedure (Aviation) - PR-AV-001” and in line with ARP4754 and DO-254.
7.3. Planned Process Technology Options
Selecting the appropriate process technology for hardware design is a critical decision that affects the performance, reliability, and manufacturability of the hardware component. Process technology options are evaluated based on factors; feature size, power consumption, process speed, environmental tolerance, and obsolescence risks. The chosen process technology should meet the specified requirements while considering the long-term availability and support required for avionics applications. Requirements will be met are declared in Equipment Requirements Document, Hardware Requirement Document and “RP-SSA-001-0001 Preliminary System Safety Assessment” design options and process will be followed as described in “PR-AV-007 Hardware Design Standard”.
7.3.1. Use of Commercial-Off-The-Shelf (COTS) Components and Microprocessors
Quality and if possible, aviation history will be the selection criterias for COTS components and they will be used and tested according to DO-254. Moreover, COTS materials will be managed according to the ASPILSAN ECMP. (Electronic Component Management Plan).
7.4. Assembly and Use Options
The hardware design includes defining the component’s assembly processes and use conditions. Options for assembly include the selection of appropriate manufacturing techniques, soldering techniques, and interconnection technologies. Use conditions consist of environmental factors such as temperature, humidity, and vibration to which the hardware will be exposed throughout its operational existence. These considerations ensure that the hardware component will continue to be reliable and functional in its intended life and aircraft environment.
7.5. Product Packaging
Product will be put in its own custom designed package for delivery and shipment.
7.6. Hardware Mounting Options
The mounting options are evaluated based on factors such as structural integrity, vibration isolation, thermal dissipation, and accessibility for maintenance and replacement. The chosen mounting method should ensure the component’s stability and reliability throughout its operational life.
7.7. Safety Considerations
Safety Considerations are detailed within RP-PSSA-001-0001 Preliminary System Safety Assessment.
7.8. Design Assurance Considerations
SAE ARP4761, Guidelines and Methods for Conducting the Safety Assessment Process on Civil Airborne Systems and Equipment, as a source of safety assessment methods to be used in the hardware design assurance process.
7.9. Deviations and Modifications to Plans
If there are deviations or modifications in the plans, ASPİLSAN Energy will inform TA as PL-HCM-001-0002 Configuration Management Plan defined.”
Bu iki dokumana göre aşağıdaki soruları cevapla. Soruların içeriği dokumanda yer alıyorsa hangi section da yer aldığını yaz. Sorular aşağıdadır;
1.1.2 Are plans, standards, design and verification environments cited complete, clear, and consistent (e.g., can the design and verification engineers follow them)?
1.1.3 "Do the plans and standards address the content as specified in DO-254 section 10 (i.e., sections 10.1.1 through 10.1.6)?
Note: The plans and standards are not required to be packaged as identified in 10.1.1 through 10.1.6; however, the items specified in 10.1.1 through 10.1.6 should be documented somewhere in the plans and standards."
1.1.4 Do the plans and standards address the hardware change process and procedures modifying the hardware and tools (if tools are used)?
1.1.5 Are all hardware tools identified in the plans and does the tool assessment provide rationale included for why each does or does not need to be qualified?
1.1.6 Are the inputs, activities, transition criteria, and outputs specified for each process (including identification of sequencing and feedback mechanisms)?
1.1.7 Are the proposed design methods defined and explained (including identification and rationale of the proposed validation and verification methods)?
1.1.8 Is there evidence that appropriate planning process activities have been adequately performed to meet the planning process objectives will be met? (Refer to section 4.2 of DO-254)
1.1.9 If the plans and standards are followed, would this ensure that all applicable DO-254 objectives are met (i.e., do the plans and standards address how each of the applicable DO-254 objectives will be satisfied)?
1.1.10 Are the interfaces and communication channels with the hardware design processes addressed in the plans and well defined? Evaluate processes for flow down of system requirements (functional, performance, operational, safety-related, and system architecture safety features) and for clarifying ambiguous system requirements. Determine if the hardware verification process will be claiming “formal test credit” for testing conducted by the system verification and validation processes. If so, then what kind of credit, and how much credit will be granted?
1.1.12 Are the interfaces and communication channels with applicable hardware design and verification processes addressed in the plans and well defined? Evaluate the processes for documenting and communicating hardware dependencies and interactions with the system software and its development and verification processes, and for software dependencies on the hardware and its design and verification processes. Determine the process used to convey safety features (e.g., monitors, built in test, memory management unit, I/O device, processor features (cache, registers, priorities, schedulers, supervisor/user modes, etc.)) and software changes affecting the hardware processes, and how the hardware processes will address them.
1.1.14 Are issue papers or national/directorate policy required for any of the additional considerations? If so, do the plans and standards address how compliance with the issue papers and/or national/directorate policy will be achieved?
1.7.2 Does the HVP adequately address the proposed contents described in DO-254, Section 10.1.3 & 10.1.4? If not, are the contents included in another plan?
1.7.3 Will applicable aspects of the HVP plan, environment, tools, training and procedures be conveyed to any sub-tier suppliers of components of the system and subcontractors to ensure their compliance to the approved plans, standards, and procedures?
1.7.7 Are verification plans, including test plans, and procedures conveyed to suppliers and sub-contractors to ensure their activities and results will comply with the approved plans and procedures?