correct the grammar: • July 6, 2024 the team was able to secure a simultaneous…

  1. User

    correct the grammar: • July 6, 2024 the team was able to secure a simultaneous inspection on bpth units 7L-EW and 8L-EW and conducted a flood test and flow test, Upon investigation, the team were able to pin point the source of the leak, it was the connection of 2 pipes of sanitary drain pipe from the toilet, thus every time the toilet of unit 8L-EW flushed the water leaks to the unit 7L-EW.

  2. Assistant

    On July 6, 2024, the team was able to secure a simultaneous inspection of both units 7L-EW and 8L-EW and conducted a flood test and flow test. Upon investigation, the team was able to pinpoint the source of the leak. It was the connection of two sanitary drain pipes from the toilet. Thus, every time the toilet in unit 8L-EW was flushed, water leaked into unit 7L-EW.

  3. User

    correct the grammar: A possibility of Improper installation of pipe connection or application of adhesive between pipes were not enough.

  4. Assistant

    A possibility of improper installation of the pipe connection or insufficient application of adhesive between the pipes was considered.

  5. User

    correct the grammar: Imperfection of workmanship

  6. Assistant

    Imperfect workmanship

  7. User

    correct the grammar: Please see attached files for the Technical Report of the leak concern and the Cost Proposal from Envil contractor for the restoration cost. Please see below tabulated details of the happenings.

  8. Assistant

    Please see the attached files for the Technical Report on the leak concern and the Cost Proposal from the Envil contractor for the restoration cost. Below are the tabulated details of the events.

  9. User

    correct the grammar: The first two items has the correlation to the upper unit hence my request to access unit 8K-EW as soon as possible to mitigate the worsening condition of unit 7K-EW. The team had tried multiple times to contact the upper unit but to no avail, may I suggest to shut off first the water supply of the upper unit to prevent further damages on the lower unit?

  10. Assistant

    The first two items have a correlation to the upper unit; hence, I request access to unit 8K-EW as soon as possible to mitigate the worsening condition of unit 7K-EW. The team has tried multiple times to contact the occupants of the upper unit, but to no avail. May I suggest shutting off the water supply to the upper unit to prevent further damage to the lower unit?

  11. User

    correct the grammar: The first two items have a correlation to the upper unit; hence, I request access to unit 8K-EW as soon as possible to identify the source of the leaks mitigate the worsening condition of unit 7K-EW. The team has tried multiple times to contact the occupants of the upper unit, but to no avail. May I suggest shutting off the water supply to the upper unit to prevent further damage to the lower unit?

  12. Assistant

    The first two items have a correlation to the upper unit; hence, I request access to unit 8K-EW as soon as possible to identify the source of the leaks and mitigate the worsening condition of unit 7K-EW. The team has tried multiple times to contact the occupants of the upper unit, but to no avail. May I suggest shutting off the water supply to the upper unit to prevent further damage to the lower unit?

  13. User

    correct the grammar: May I kindly endorse to you the team’s findings about 7K-EW unit concern. Upon inspection, there’re were leak concern with different source that needed to be addressed immediately,

  14. Assistant

    May I kindly endorse to you the team’s findings regarding the 7K-EW unit's concern? Upon inspection, there were multiple leaks from different sources that needed to be addressed immediately.