Please correct the grammar: Issued Tax invoice is still the handwritten but with stamp…
- User
Please correct the grammar: Issued Tax invoice is still the handwritten but with stamp on top.
- Assistant
The tax invoice that was issued is still handwritten but with a stamp on top.
- User
please correct the grammar: Hello Ms. Lyne, Issued Tax invoice No. 1377 is still the handwritten but with a stamp on top “Tax invoice”. Would this be acceptable?
- Assistant
Hello, Ms. Lyne,
Tax invoice No. 1377 that was issued is still handwritten but with a stamp on top that says "Tax Invoice." Would this be acceptable?
- User
please improve the sentence structure: Hello Jon, We are now in preparation of mooring arrangement. Do you a plan view of mooring cleat locations? If we tie up the yacht alongside the Lewek floating dock, an overhang gangway will be fixed to Lewek but there will be a gap to be able bridge over which certainly a risk. We recommend if we use instead the workboat to transferring and unloading.
- Assistant
Hello Jon,
We are currently preparing the mooring arrangement. Do you have a plan view showing the locations of the mooring cleats? If we were to moor the yacht alongside the Lewek floating dock, an overhang gangway would be fixed to the Lewek. However, there would be a gap that poses a risk when trying to bridge over it. We recommend using the workboat for transferring and unloading instead.
- User
please correct the grammar: Hello Jon, We are now in preparation of mooring arrangement. Do you have a plan view showing the mooring cleat locations? If we were to moor the yacht alongside the Lewek floating dock, an overhang gangway would be fixed to Lewek. However, there would be a gap that poses risk when trying to bridge over. We recommend using the workboat for transferring and unloading instead. What your thoughts?
- Assistant
Hello Jon, We are currently preparing the mooring arrangement. Do you have a plan view showing the mooring cleat locations? If we were to moor the yacht alongside the Lewek floating dock, an overhang gangway would be fixed to Lewek. However, there would be a gap that poses a risk when trying to bridge over it. We recommend using the workboat for transferring and unloading instead. What are your thoughts?