correct the grammar: Apology for the late revert, we have already conducted a thorough…
Jump to turn (21)
- 1correct the grammar: Apology for the late revert, we have already conducted a th
- 2correct the grammar: Apologies for the late response. We have already conducted
- 3correct the grammar: May I endorse unit 20Q-NW for fit out renovation “MINOR REN
- 4correct the grammar: This is to endorse unit 20Q-NW for a “MINOR RENOVATION” fit
- 5rephrase to professionally sound email: This is well received. I Will endorse th
- 6correct the grammar: Construction bond receipt is well received. I also copied M
- 7tell me everything about organizational behavior
- 8tell me about maslow's hierarchy of needs
- 9correct the grammar: Retrofitting of the ceiling slab or re application of water
- 10correct the grammar: • The leak suspectedly came from the amenity at the pool ar
- 11correct the grammar: • At around 1531H, an alarm was sound off due to the drench
- 12correct the grammar: Good day, this will be endorse for approval and expect answ
- 13correct the grammar: May we know which area are you going to install a cabinet?
- 14correct the grammar: Kindly ask for Engineering Technician assistance after the
- 15correct the grammar: May I follow up this concern please as the Unit Owner has b
- 16correct the grammar: This is to report to you the leak concern on unit 20R-EW an
- 17correct the grammar: This is to report the result of the inspection/flood testin
- 18correct the grammar: . 12K-EW unit owner’s responsibility to repair the source o
- 19correct the grammar: May we ask your assistance for the First case. Please refer
- 20correct the grammar: For assignment of fit out please.
- 21correct the grammar: Before closing of ceiling, kindly ask fir an inspection of
- User
correct the grammar: Apology for the late revert, we have already conducted a thorough inspection of the said leak concern, but in order for us to endorse his to the Project team we need to conduct a flood testing on both unit (54K/55K-WW). A series of effort has been done to communicate with the upper unit to secure a schedule but to no avail.
- Assistant
Apologies for the late response. We have already conducted a thorough inspection of the mentioned leak concern. However, in order for us to endorse this to the Project team, we need to conduct flood testing on both units (54K/55K-WW). Despite multiple efforts to communicate with the occupants of the upper unit to secure a schedule, we have not been successful.
- User