please correct the grammar: This report marks 12 weeks into the construction of H428.…
- User
please correct the grammar: This report marks 12 weeks into the construction of H428. Progress is still on track with the baseline schedule. Complete hull units are now on joint up stage with stringers and shell plate being started to fit in after the non-integral tanks and engine bed had been loaded into the units. Small components like secondary structure for hull vents, ladder, mast, anodes, floor plates, and sea chest collection box are now also commencing.
- Assistant
This report marks the 12-week point in the construction of H428. Progress remains on track with the baseline schedule. Complete hull units are now in the joint-up stage, with stringers and shell plates being fitted in after the non-integral tanks and engine bed have been loaded into the units. Small components, such as secondary structures for hull vents, ladders, masts, anodes, floor plates, and sea chest collection boxes, are also now beginning.