please correct the grammar: Small components, such as secondary structure for hull vents, ladder, mast, anodes, floor plates, and sea chest collection box prefabrication now progressing.
- Assistant
Small components such as secondary structure for hull vents, ladders, masts, anodes, floor plates, and sea chest collection box prefabrication are now progressing.
- User
Please correct the grammar: Plan approval by the AMSA surveyors is still slow, comments received being address within time. The Electrical drawing submittals coping up with the deadline. Additional SPEX for the flush main deck hatches has been approved.
- Assistant
Plan approval by the AMSA surveyors is still slow, with comments being addressed within time. The electrical drawing submittals are meeting the deadline. Additional SPEX for the flush main deck hatches have been approved.