make wbs based off this. this is a general list. if there are additional technical /…
- User
make wbs based off this. this is a general list. if there are additional technical / mechanical components that can be added please add them. its for a smmall local distllery implemtnting a new capping and labelling machine. also include transportation of equipment: ASSUMPTIONS: • Fully Automated for simplicity • Local distillery so smaller scale configuration roughly 500 bottles per week • Configuration of botting line dependent on nature of bottles and number of units to be filled per unit time. Potential tasks required for installation.
-
Pre-Installation Planning • Capacity and Compatibility Check: Evaluate the current bottling line’s capacity and ensure the new capper and labeler are compatible with your bottles or containers in terms of size, shape, material, and the production speed of your line. • Space Assessment: Confirm there is adequate space in facility for the new machines. • Electrical and Mechanical Requirements: Before installation, verify the electrical and mechanical specifications of the new machines, ensuring they match your facility’s capabilities. (power supply, air supply). • Plan the integration with the existing bottling line control systems. This might involve software updates or modifications to ensure smooth communication and operation between machines.
-
Physical Installation • Installation Space: Position the capper and labeler in the designated spaces. • Mechanical Integration: Securely mount the machines, ensuring they are perfectly leveled and aligned with the conveyor system.
-
Electrical Connections: • Connect the machines to the necessary power and air supply lines. • Control System Integration: Integrate the machines with the line’s control system.
-
Testing: Conduct initial tests to check successful integration of the capper and labeler.
-
Calibration: Adjust the machines for optimal performance.
-
- Assistant