summarize below meeting transcript. 0:0:0.0 --> 0:0:7.380 Will Lytle There we go through…
- User
summarize below meeting transcript.
0:0:0.0 --> 0:0:7.380 Will Lytle There we go through some example use cases or you know different perspectives and ways of using the data. 0:0:9.550 --> 0:0:18.230 Will Lytle So I think it's we're going through this today, it would be very good if this is a kind of collaborative effort, collaborative conversation. 0:0:18.240 --> 0:0:21.380 Will Lytle So if you do have any questions, please raise your hand. 0:0:22.990 --> 0:0:31.60 Will Lytle Also, if there's any potential use cases that you have or challenges that you have, those always gonna be far more interesting because we can actually use your data. 0:0:31.70 --> 0:0:38.120 Will Lytle Sometimes it's very difficult for me to illustrate a use case when the data doesn't necessarily marry up to that use case. 0:0:38.470 --> 0:0:40.740 Will Lytle So they'll have to be a little bit of suspension of disbelief. 0:0:40.750 --> 0:0:53.630 Will Lytle I guess today was we go through some of this because obviously we'll be looking at your data and I can't always curate the problem that I'm necessarily trying to to evidence as a potential use case for Plandek or the data behind you know what might lead to these decisions. 0:0:53.640 --> 0:1:4.250 Will Lytle So if there are any like real life examples that will just make the conversation today, I think a little bit more, more relevant or at least have some evidence backed data for us to be able to take a look at. 0:1:4.970 --> 0:1:7.780 Will Lytle I'm feel free to use the chat as well. 0:1:7.930 --> 0:1:14.200 Will Lytle I'll try to keep an eye on the chat as quickly as closely as I can throughout this and we will. 0:1:14.510 --> 0:1:16.560 Will Lytle We'll pick up any of those questions as we go along. 0:1:16.810 --> 0:1:17.490 Will Lytle So that sounds good. 0:1:19.360 --> 0:1:19.800 Speaker 1 Yep. 0:1:19.980 --> 0:1:24.590 Speaker 1 Yeah, I will monitor it to chat as well and and inform you as any question. 0:1:25.960 --> 0:1:27.690 Will Lytle Alright, OK. 0:1:27.700 --> 0:1:44.430 Will Lytle So, umm, inevitably I'm going to have to pick a space, so we're going to pick the emergent PR space, so apologies in advance if this is your space and and and we're gonna use your data today as a Guinea pig. 0:1:46.470 --> 0:1:58.60 Will Lytle What I wanted to do is pick, I think a couple of the real common metrics that we see a lot of across a lot of our clients and just talk through some of the different ways in which people are looking at this data, how they're using this data. 0:1:58.70 --> 0:2:5.960 Will Lytle Some of the insights that might pop up into this data that might be relevant to you, it might not be, but please, you know, feel free to ask along the way. 0:2:7.30 --> 0:2:23.470 Will Lytle I wanted to start with print Sprint predictability because I think from a, you know from a getting started perspective, this is probably one of the metrics which I think has you know it's easiest to to understand what's going on here. 0:2:23.480 --> 0:2:28.350 Will Lytle And it's also, I think, relevant and useful for the majority of teams, at least those teams. 0:2:28.360 --> 0:2:29.670 Will Lytle Obviously they're doing Scrum. 0:2:29.680 --> 0:2:31.90 Will Lytle If you're a Cadman team, we will. 0:2:31.180 --> 0:2:51.370 Will Lytle We will talk a little bit about Kanban metrics today, but we'll start with Scrum just because the largest proportion of teams are so Sprint predictability is, you know, at the end of the day it's about driving a very simple behavior, which is the ability for a team to consistently plan and execute right plan. 0:2:51.380 --> 0:2:57.570 Will Lytle Meaning we understand what our capacity is, what our potential velocity is, right? 0:2:57.640 --> 0:3:0.210 Will Lytle We can effectively plan against that, right? 0:3:0.220 --> 0:3:8.820 Will Lytle We can identify what are the goals we want to achieve this Sprint and therefore what are the tickets that we need to put into this Sprint to be successful in accomplishing that. 0:3:10.300 --> 0:3:17.500 Will Lytle The emergent team here is is, you know, fairly successful, I would say in this point with a lot of clients. 0:3:17.770 --> 0:3:28.410 Will Lytle We always suggest that teams are aiming between 80 to 90% AH and you don't want to really be much less much. 0:3:28.980 --> 0:3:37.750 Will Lytle You know further below 80% because ultimately that then statistically starts to impact the ability for the team to plan on what to execute on what they planned on. 0:3:37.800 --> 0:3:49.590 Will Lytle So if you're working in a a quarterly road map and that quarter is based on a series of, let's say fate sprints or whatever, it might be 6 sprints. 0:3:51.140 --> 0:3:54.890 Will Lytle You wanna make sure that each one of those sprints are orchestrated correctly? 0:3:55.920 --> 0:4:13.810 Will Lytle If you wanna be able to kind of make it to the end of that that quarter having achieve most most of what you have counted what you said out to accomplish and I say most because I don't think agile and necessarily is best applied when trying to deliver a full scope of 100% of things over 1/4. 0:4:13.880 --> 0:4:30.470 Will Lytle They're probably different methods that you could use that will be a little bit more effective at delivering a fixed scope or for a fixed time I waterfall, but when you are looking to be able to delivered to a target with a little food ability, it's quite an effective way of doing that. 0:4:30.620 --> 0:4:46.240 Will Lytle Now obviously, if you go above 90% then the question is ultimately in the if we're able to achieve 95 to 100% of what we planned every Sprint and we're dealing with some level of acceptance scope change, cause priorities will change. 0:4:46.250 --> 0:4:53.140 Will Lytle There will be things that get reprioritized because they must be reprioritized, there might be a production incident that pops up that needs to be dealt with. 0:4:55.80 --> 0:5:3.570 Will Lytle You really don't wanna be accomplishing 100% and also accounting for those things because then it probably suggests that you're really under planning based on your capacity. 0:5:3.580 --> 0:5:11.150 Will Lytle So you wanna set you wanna set the goal of the team is to accomplish a number of goals and a number of tickets that really deliver those goals. 0:5:11.500 --> 0:5:17.370 Will Lytle But be realistic about the fact that because of the process we're taking, 100% isn't actually the right goal post. 0:5:17.380 --> 0:5:19.220 Will Lytle It should probably be somewhere between 8:00 and 90%. 0:5:20.800 --> 0:5:22.510 Will Lytle So why does this metric matter? 0:5:22.980 --> 0:5:23.590 Will Lytle OK. 0:5:23.900 --> 0:5:32.720 Will Lytle Well, number one is in the top left age, your velocity and you can toggle between whether you want to measure the velocity with story points or tickets. 0:5:34.910 --> 0:5:36.710 Will Lytle That should be a very simple option here. 0:5:36.780 --> 0:5:38.810 Will Lytle How you want this to be to be calculated? 0:5:39.160 --> 0:5:49.390 Will Lytle The reason I put tickets and I think the reason why I tickets is most meaningful for most teams, is most teams don't story point things like a subtask or they don't. 0:5:49.400 --> 0:6:2.90 Will Lytle Sorry, point their bugs or defects or support tickets or you know a lot of teams focus on story pointing things like stories or potentially bugs that are in a backlog that are not related directly to the story. 0:6:2.100 --> 0:6:4.610 Will Lytle So what you guys call a story bug in this instance, right? 0:6:6.580 --> 0:6:18.110 Will Lytle And so if you use story points as the calculation for this, mathematically you will not be calculating the things that aren't story point, and you'll only be your numerator and your denominator is basically based on story points. 0:6:18.300 --> 0:6:28.30 Will Lytle And so whilst it's a meaningful view, if you're really wanting to focus on what proportion of the kind of new value that we're delivering in terms of story points is being put, then that's fine. 0:6:28.250 --> 0:6:33.690 Will Lytle But if you're trying to get a full picture, then I think the tickets provide a more representative view now. 0:6:35.590 --> 0:6:45.940 Will Lytle I think more important than the velocity is really the volatility because what this volatility does is it basically manages or looks at the standard deviation for your team. 0:6:46.70 --> 0:6:48.660 Will Lytle So you can actually show what are the sprints. 0:6:48.670 --> 0:6:54.180 Will Lytle We're taking a look at what is the simple standard deviation of that and how that's calculated right. 0:6:54.220 --> 0:7:2.700 Will Lytle So you can see the volatility calculation here to give you a little bit of an understanding of what the hell is 52 meters, what is 53 mean and what is 53 mean here. 0:7:2.850 --> 0:7:15.300 Will Lytle So this is showing you that currently based on the last five sprints, the volatility of 52, if we look to the last Sprint based on the five sprints prior to that, right, it would be 53 and 53. 0:7:15.310 --> 0:7:17.980 Will Lytle So you can see that there is a trend here, right? 0:7:18.20 --> 0:7:23.60 Will Lytle And the reason this is so important is because you're velocity is one thing, right? 0:7:23.70 --> 0:7:41.930 Will Lytle But if you're calling trying to use your velocity to get some sort of an understanding in a future view of you know, how much can we deliver over the next 5 sprints for Pi, the volatility is gonna be quite important because it adds a low level of confidence behind whether or not 8 tickets is something credible or whether or not that's going to be highly variant. 0:7:41.990 --> 0:7:51.920 Will Lytle Now, this one in particular here is impacted quite significantly by this Sprint, which will go into in a second, cause there's something that happened in this Sprint which I think is important. 0:7:54.290 --> 0:8:4.980 Will Lytle But otherwise, I would argue that between eight, 11810 and 11, there actually is a reasonable volatility there. 0:8:5.250 --> 0:8:12.920 Will Lytle OK, now this calculation here at the moment is based on what was included the start of the Sprint. 0:8:13.340 --> 0:8:13.710 Will Lytle OK. 0:8:13.720 --> 0:8:19.410 Will Lytle So when we say velocity it's I want the velocity, the things that we did we completed before the end of the Sprint. 0:8:19.460 --> 0:8:26.410 Will Lytle I want that to be based on only the tickets that were planned before the Sprint started, right in terms of commitment. 0:8:26.420 --> 0:8:32.80 Will Lytle What we said we were going to do, I want that to equally be based on only the tickets that were included. 0:8:32.90 --> 0:8:33.210 Will Lytle The start of the Sprint. 0:8:33.840 --> 0:8:55.350 Will Lytle The reason this is often used as a default, and again I think there's a there's value in looking at it both ways is ultimately what you're trying to drive long term is at a level of maturity that we can plan and execute before we hit start in the Sprint right that we with a high level of confidence we can identify what our goals are for this Sprint. 0:8:55.400 --> 0:9:2.40 Will Lytle We can identify the tickets that we need to deliver to deliver those goals, and therefore this is a good starting point for us to be able to measure it. 0:9:2.600 --> 0:9:14.330 Will Lytle That said, if you are a team that's equally dealing with things coming in and out of the Sprint, you could also bubble this to look at anything that was ever included in the Sprint. 0:9:14.340 --> 0:9:22.870 Will Lytle So whether something was added to the Sprint or was planned at the start of the Sprint right, you can now have the calculation based on that. 0:9:22.980 --> 0:9:30.110 Will Lytle Now you still see a little bit of an impact here and I I can't tell you the context about what happened here and I don't think it's important for today's conversation. 0:9:30.940 --> 0:9:31.820 Will Lytle Obviously there is. 0:9:32.820 --> 0:9:33.290 Will Lytle I'm on. 0:9:33.300 --> 0:9:35.500 Will Lytle We looked at it was planned before the Sprint started. 0:9:35.510 --> 0:9:38.740 Will Lytle It was a low number of tickets and then this Sprint. 0:9:39.790 --> 0:9:42.490 Will Lytle Umm, obviously had a few tickets added into it. 0:9:43.210 --> 0:9:43.550 Will Lytle Umm. 0:9:43.690 --> 0:9:45.870 Will Lytle And to those tickets were completed by the end of the Sprint. 0:9:45.880 --> 0:9:56.100 Will Lytle Now there could be a number of reasons for that could be maybe the, maybe the team had something else planned, they were supporting a production release, or maybe there were a number of people on the team who got sick that week. 0:9:56.110 --> 0:9:56.980 Will Lytle And that's just an anomaly. 0:9:57.260 --> 0:9:57.820 Will Lytle That's fine. 0:9:57.830 --> 0:10:6.320 Will Lytle Like you know, you would expect things like this to happen from time to time in the data point being here is that allows you to get both views of these things. 0:10:6.330 --> 0:10:18.120 Will Lytle Now obviously this Sprint completion takes a hit there when we drop and the reason being of course is given the fact that tickets are being added into the sprints which will come into in a second. 0:10:18.190 --> 0:10:21.480 Will Lytle But it's gonna naturally change what the completion rate is, OK. 0:10:23.180 --> 0:10:27.450 Will Lytle So I'm gonna go back to this view here just very quickly now. 0:10:27.540 --> 0:10:39.570 Will Lytle If you look at what was planned at the start of the Sprint and what was what was included, the start of the Sprint versus what was committed based on what was started, the Sprint doesn't mean that all of your data is completely obfuscated. 0:10:39.800 --> 0:10:42.820 Will Lytle OK, this is where the committed versus completed view is really helpful. 0:10:43.930 --> 0:10:48.840 Will Lytle And with this view here basically looks at everything you're you're full composition of the Sprint. 0:10:49.270 --> 0:10:52.900 Will Lytle OK, the blue bar is always going to be based on what you committed to. 0:10:52.910 --> 0:11:1.850 Will Lytle These are things that entered into the Sprint, whether it happened before the Sprint started or after the Sprint started, and it helps you get an understanding of a couple of different things. 0:11:1.960 --> 0:11:4.150 Will Lytle One is carryover, right? 0:11:4.160 --> 0:11:8.30 Will Lytle I I would argue that this team is reasonably healthy with carryover. 0:11:8.80 --> 0:11:20.210 Will Lytle I've seen teams that are a much higher than 17%, but what the carryover represents is that there is a ticket that was in our previous Sprint that was not completed and that ticket was immediately carried over into the next Sprint. 0:11:20.480 --> 0:11:31.620 Will Lytle So if you think about this in some ways, you might say that 17% of your velocity over time is going to be cannibalized by work that we weren't unfortunately able to get done in the prior Sprint. 0:11:32.170 --> 0:11:36.560 Will Lytle Now again, we don't expect Sprint completion to be 100%, right. 0:11:36.850 --> 0:11:42.240 Will Lytle We do expect there to maybe always be a little bit of carryover and that's why I'm not too worried in this instance. 0:11:42.570 --> 0:11:43.630 Will Lytle You know why 17? 0:11:43.710 --> 0:11:45.670 Will Lytle This is 17%. OK, fine. 0:11:45.680 --> 0:12:7.600 Will Lytle I mean, there's going to be spillover between sprints where this starts to make people nervous is when it gets above 20 percent, 30%, because that starts to mean you're actually really having a kind of statistical cannibalization of your velocity on an ongoing basis and that's something you can you can hit the you can take a hit with one Sprint, but you certainly wouldn't want to see that over time. 0:12:8.210 --> 0:12:17.340 Will Lytle And that's where these views here can be quite helpful, because this helps you distinguish of what we plan for a Sprint, how much of it was new work that we planned right. 0:12:17.350 --> 0:12:23.390 Will Lytle So you can see roughly 50%, just over 50% was new work planned for this Sprint. 0:12:23.660 --> 0:12:24.930 Will Lytle A number of it was carried over. 0:12:24.940 --> 0:12:33.30 Will Lytle Unfortunately, nothing was added as part of this Sprint, but in the next Sprint we had a couple of tickets that were carried over and a couple of tickets that were added mid Sprint. 0:12:33.220 --> 0:12:40.390 Will Lytle So it allows us as a team to really be able to kind of dissect over time what's happening with our data, what's happening with our planning activities. 0:12:40.820 --> 0:12:44.330 Will Lytle Generally speaking, I think this team shows very good patterns right? 0:12:44.340 --> 0:12:52.500 Will Lytle The Farr majority of the work that's going into every Sprint, both from a plant as well as a completed perspective, is based on planned work, right? 0:12:52.690 --> 0:12:58.960 Will Lytle And you have an acceptable threshold of, you know, work being added now, you'll probably have. 0:12:58.970 --> 0:13:0.30 Will Lytle What are these thresholds? 0:13:0.40 --> 0:13:0.410 Will Lytle I don't. 0:13:0.420 --> 0:13:5.460 Will Lytle I don't think there's a benchmark threshold that you can apply for all teams in all situations. 0:13:5.470 --> 0:13:17.980 Will Lytle I think the team, when you're looking at this data, you have to be, you have to kind of understand what you're comfortable with is thresholds that's going to allow you to ultimately to be able to maintain a healthy completion right here, OK. 0:13:20.190 --> 0:13:34.650 Will Lytle That sounds like a bit of a cop out, but I think the important bit is is a team has to draw, has to have a real kind of proximity and understanding to their own data and the thresholds that will allow them ultimately to to maintain the healthy completion rate. 0:13:34.660 --> 0:13:37.350 Will Lytle And some of that might be influenced by carryover. 0:13:37.360 --> 0:13:39.240 Will Lytle Some of it might be influenced by ticket change. 0:13:40.460 --> 0:13:42.220 Will Lytle The ticket change will come into in a second here. 0:13:42.660 --> 0:13:51.630 Will Lytle I'm but that that's where my view is on the on thing now in terms of the ticket change, there are two kind of views on that and try not to make this about training. 0:13:51.640 --> 0:13:54.660 Will Lytle But I think in everybody part of it is about training as we walk through some of these. 0:13:55.630 --> 0:14:2.80 Will Lytle So the scope change will help you get a sense of what's added and removed from a particular Sprint, right? 0:14:2.90 --> 0:14:3.780 Will Lytle So we don't see anything actually being removed. 0:14:3.790 --> 0:14:13.80 Will Lytle What we would expect to see here if there was work being removed is that you'd have a little orange bar below this purple bar, so the purple bar allows you to see the tickets being added each Sprint. 0:14:13.190 --> 0:14:18.160 Will Lytle So we talked a little bit about the Sprint already, but you can see that there's a little bit being added every Sprint. 0:14:18.170 --> 0:14:21.740 Will Lytle And again, that's natural and if you want to, you can click in here. 0:14:21.950 --> 0:14:22.820 Will Lytle See what it is. 0:14:22.970 --> 0:14:25.500 Will Lytle It's unsurprising that a bug gets added to a Sprint right? 0:14:25.510 --> 0:14:29.230 Will Lytle You would typically expect things like bugs to be added to sprints OK. 0:14:31.950 --> 0:14:33.100 Will Lytle But what does that mean? 0:14:33.210 --> 0:14:34.130 Will Lytle Like what is, what is? 0:14:34.140 --> 0:14:36.860 Will Lytle What does that change mean in the context of everything else? 0:14:36.900 --> 0:14:41.500 Will Lytle So the scope change percentage basically takes into consideration. 0:14:41.570 --> 0:14:45.500 Will Lytle So this will show you your gross as in we added we added six but we removed 6. 0:14:45.510 --> 0:14:49.160 Will Lytle So essentially, we maintained a 0% change, right? 0:14:51.860 --> 0:14:57.340 Will Lytle This will show you what you originally had, what you finished with it, what the gross change was, and what the net change was. 0:14:58.180 --> 0:15:5.310 Will Lytle The second view here in terms of the scope change itself will put that in proportion of the overall scope of the team. 0:15:5.740 --> 0:15:12.240 Will Lytle So what it basically means is 35% of that team Sprint scope changed during the course of this. 0:15:12.340 --> 0:15:23.110 Will Lytle So serves a relative view so that you can see, you know, OK, well, maybe we had a lot of tickets added, but the proportionally it was actually a very small level of change as opposed to in this example, more tickets added. 0:15:23.120 --> 0:15:34.930 Will Lytle Actually, a third of our scope changed in this, so that might have an impact as to whether or not, for instance 105, umm, you know, arguably the team did quite well to navigate through that phase. 0:15:35.160 --> 0:15:40.490 Will Lytle OK, so a lot of our clients are really honing in on these patterns, right? 0:15:40.500 --> 0:15:47.190 Will Lytle What's happening in terms of change and what impact that's having, what's happening in terms of carryover work and how can we mitigate that over time? 0:15:48.420 --> 0:15:58.180 Will Lytle How we ultimately driving towards these Sprint completion goals and then obviously looking at the volatility now, the one thing I would add here and I can't demo this cause it doesn't exist in the data. 0:15:59.180 --> 0:16:2.350 Will Lytle Umm, but I don't know if it's something Ideagen's interested in. 0:16:2.360 --> 0:16:13.290 Will Lytle I don't know if it's something that a couple of teams want to trial, but we have a few clients that actually track their Sprint goals and obviously you'll be well aware with Chira. 0:16:13.780 --> 0:16:21.850 Will Lytle There's a goal section at the top, which is basically just unstructured free text, and that's not particularly helpful when you're trying to measure. 0:16:21.860 --> 0:16:27.620 Will Lytle It's good as a UI reminder of what your goals are, but you can't measure that box because that box is just unstructured text. 0:16:28.640 --> 0:16:39.710 Will Lytle So what they do is they create what they call an issue type called the sprinkle and they will treat that like every other ticket like a story or a bug or a a task. 0:16:39.820 --> 0:16:47.640 Will Lytle OK, so I'll create one or two goals or maybe three goals for that Sprint, SO3 separate tickets and they will add it to that Sprint, OK. 0:16:48.520 --> 0:16:58.810 Will Lytle And the reason I love this idea is because this view here is very much focused on the executional side of the tickets themselves, right. 0:16:59.220 --> 0:17:1.930 Will Lytle Whereas there's a kind of a separate question. 0:17:1.940 --> 0:17:10.640 Will Lytle Arguably, maybe even more important, which is regardless of all of this, which helps us understand how we're driving scrum, behavior and managing our sprints. 0:17:11.390 --> 0:17:13.980 Will Lytle To what extent did we accomplish our goals right? 0:17:13.990 --> 0:17:18.790 Will Lytle Because we could deliver all of our tickets, but if we didn't accomplish our goals, that's not great. 0:17:19.30 --> 0:17:25.220 Will Lytle That said, we could deliver 70% of our tickets, which doesn't sound great, but we accomplished all of our goals right. 0:17:25.350 --> 0:17:34.800 Will Lytle So I love your idea because I think it provides teams with a different point of view in terms of the the ultimate thing that you're trying to do here, which is deliver your sprinkles. 0:17:35.30 --> 0:17:39.560 Will Lytle So if there are teams that wanted to do this in, test it and try it out, I definitely recommend it again. 0:17:39.890 --> 0:17:52.640 Will Lytle You probably need help from an admin creating the issue type, but essentially what you can do is you could even trial it with like a task or something like that and then put a label as a Sprint goal. 0:17:52.910 --> 0:17:58.50 Will Lytle But what you basically do is and maybe this isn't the right metric for it. 0:17:58.60 --> 0:18:0.420 Will Lytle You could actually use something like Sprint completion rates. 0:18:0.590 --> 0:18:10.30 Will Lytle So if we go into here and we go down to the one of the Sprint completion rates, you would just apply the filter there to focus on a task with a label of sprinkle. 0:18:10.40 --> 0:18:16.580 Will Lytle Or if you do get an issue type created just the sprinkle and then you can actually see how we're delivering our sprinkles in combination with this. 0:18:17.690 --> 0:18:23.150 Will Lytle And I think that's a very powerful view and a very meaningful view as well when trying to drive motivation. 0:18:24.300 --> 0:18:27.670 Will Lytle Ideagen hasn't done this yet, but I know from working with a lot of our clients. 0:18:28.870 --> 0:18:36.680 Will Lytle This metric here in particular has the highest correlation with engineering satisfaction right. 0:18:36.690 --> 0:18:55.320 Will Lytle In Scrum, teams that we've seen so far, and I think that's common sense, really at the end of the day, because I think if a team is able to consistently scope out their goals and has the opportunity to deliver those goals without priorities changing or things being distracted or whatever, it's highly motivating. 0:18:55.910 --> 0:18:56.140 Speaker 1 Umm. 0:18:55.370 --> 0:19:2.840 Will Lytle Whereas if your scope is always changing and you're always being set up to never quite accomplish what you've told you know you need to accomplish. 0:19:2.930 --> 0:19:6.40 Will Lytle That can be quite demoralizing, especially if it's done on a sustained basis. 0:19:6.50 --> 0:19:25.450 Will Lytle So I do think from a leadership perspective, whether you're a team lead, a scrum master, an engineering manager, you know, whatever your role is and in any form of leadership position, this is really an important metric, not only in terms of your delivery predictability, but also getting a good eye on how do I drive, you know, kind of positive and motivated environment with an engineering organization. 0:19:25.880 --> 0:19:30.800 Will Lytle Obviously, if you're using Scrum, that's not going to be possible, but OK, I'll pause there. 0:19:29.570 --> 0:19:30.860 Speaker 1 OK. Uh. 0:19:30.810 --> 0:19:31.430 Will Lytle Any questions? 0:19:31.440 --> 0:19:31.840 Will Lytle Any comments? 0:19:40.420 --> 0:19:42.530 Emma Woodcock And I'll just. Sorry, go on. 0:19:39.690 --> 0:19:43.190 Speaker 1 I mean, yeah, maybe that could go ahead. 0:19:43.240 --> 0:19:44.910 Speaker 1 Yeah. OK. 0:19:44.590 --> 0:19:48.250 Emma Woodcock I was going to say I quite like the idea of measuring the Sprint goal. 0:19:48.990 --> 0:20:5.60 Emma Woodcock I'm completion because I've that's one thing that I've I've keep noticing when I'm looking at these metrics, is that the percentage of of the Sprint completed doesn't really bear any relation to whether or not we hit the Sprint goal. 0:20:5.590 --> 0:20:14.170 Emma Woodcock And and I was kind of trying to see, you know, how do we square these two sets of data and and what should we read from it? 0:20:14.180 --> 0:20:17.930 Emma Woodcock So yeah, if if there's a way to do that, I'd be quite interested in looking at that. 0:20:20.310 --> 0:20:20.820 Will Lytle 100%. 0:20:20.810 --> 0:20:21.920 Speaker 1 Yeah, yeah. 0:20:22.70 --> 0:20:32.280 Speaker 1 View if maybe it has some visuals right on how how it will look like then OK, ask for more feedback for those who would like to try it out. 0:20:34.340 --> 0:20:36.110 Will Lytle I can pretend because I'd like. 0:20:36.990 --> 0:20:39.0 Speaker 1 OK, OK, alright. 0:20:40.810 --> 0:20:41.80 Speaker 1 Umm. 0:20:36.120 --> 0:20:42.970 Will Lytle I guess we don't have the data there, but if for instance you use Sprint completion, the I'll show you how another client sets this up. 0:20:43.420 --> 0:20:44.760 Will Lytle So the Sprint completion here. 0:20:46.770 --> 0:20:52.310 Will Lytle So this just you not too dissimilar to the other metro we're looking at, but just a more simplified view of it. 0:20:52.570 --> 0:20:59.360 Will Lytle But basically, Emma, what you would do is let's imagine you created an issue type called the Sprint Goal, right, which is what this other customer does. 0:20:59.850 --> 0:21:9.480 Will Lytle Essentially what you would do is you'd go into the filter and rather than looking at all tickets in our Sprint, I just want to look at only the Sprint goals and I want to see what was done or not done by the end of the Sprint. 0:21:9.490 --> 0:21:14.600 Will Lytle So did we accomplish the goal and we marked as completed by the end of the Sprint or not? 0:21:17.280 --> 0:21:17.490 Speaker 1 OK. 0:21:18.620 --> 0:21:18.920 Matthew Frater You know. 0:21:14.610 --> 0:21:22.740 Will Lytle And so obviously you don't have one here showing which is the challenge, but let's pretend security was Sprint goal, right? 0:21:23.950 --> 0:21:27.520 Will Lytle I've no idea what's gonna show up in the data here, so let's find out, right. 0:21:27.700 --> 0:21:29.750 Will Lytle Obviously it's not a great view, but it does it. 0:21:29.760 --> 0:21:32.450 Will Lytle It will show you here for instance. 0:21:32.460 --> 0:21:32.730 Will Lytle OK. 0:21:32.740 --> 0:21:36.490 Will Lytle Well, we had one goal last Sprint and 1:05 and we didn't accomplish it. 0:21:36.760 --> 0:21:36.960 Speaker 1 OK. 0:21:36.920 --> 0:21:41.990 Will Lytle We had four goals, which is a lot too many, but whatever, it's the data, right? 0:21:42.0 --> 0:21:43.910 Will Lytle We completed three, but we didn't accomplish one. 0:21:43.920 --> 0:21:48.290 Will Lytle And then in Sprint 7107, we accomplished both the goals, right. 0:21:48.300 --> 0:21:51.290 Will Lytle So on a journey finally got there. 0:21:51.380 --> 0:21:52.110 Will Lytle That sort of thing. 0:21:55.550 --> 0:21:55.760 Speaker 1 OK. 0:21:52.540 --> 0:21:57.30 Will Lytle And that's basically this is the view that they use right now with them. 0:21:57.40 --> 0:21:58.220 Will Lytle It's a very binary question. 0:21:58.630 --> 0:22:1.700 Will Lytle They either accomplished all goals or they didn't accomplish any goals. 0:22:1.710 --> 0:22:2.990 Will Lytle Is the way that they handle it now. 0:22:3.0 --> 0:22:7.20 Will Lytle That's obviously the decision for you to make within your teams and your product area. 0:22:7.150 --> 0:22:9.30 Will Lytle I kind of like that because it's a very binary. 0:22:9.40 --> 0:22:11.820 Will Lytle You either completed what you said out to accomplish or you didn't. 0:22:11.900 --> 0:22:18.470 Will Lytle There's no partial victories in Sprint goals, which is which is harsh but fair, I think. Umm. 0:22:20.470 --> 0:22:26.380 Will Lytle And then that gives them an overarching view that like you know, 60% of the time will accomplish our goals, which is definitely something you want to work on. 0:22:27.130 --> 0:22:29.680 Will Lytle If that was the case, poor emergent. 0:22:29.690 --> 0:22:43.300 Will Lytle We're looking at their security issues, but again, as I mentioned, you know, umm, I suspension of disbelief now just punches of time. It's 25 past. 0:22:43.310 --> 0:22:44.860 Will Lytle I'll I'll move through a few of the more. 0:22:44.910 --> 0:22:49.880 Will Lytle I tried to accommodate some of the what I wanted to look at was more the aging WIP one. 0:22:49.890 --> 0:22:53.850 Will Lytle This is relatively newer metric, one that's been around now for a couple of months. 0:22:55.850 --> 0:23:12.510 Will Lytle It would aging WIP does or what's in intended to do is give you a kind of a real time view throughout certain stages, certain defined stages of your SDLC where your live tickets are relative to where similar tickets have been historically on their way to being delivered. 0:23:12.830 --> 0:23:21.490 Will Lytle OK, now a lot of clients when they first look at this metric will look at something like this because inevitably there will be hygiene work that needs to be done. 0:23:21.500 --> 0:23:28.700 Will Lytle So there is a task that is in development and has been in development for 458 days. 0:23:28.810 --> 0:23:32.860 Will Lytle I am guessing that that is probably not gonna be done and probably just needs to be closed off. 0:23:32.950 --> 0:23:36.860 Will Lytle So like, I guess surprisingly to me, I wasn't expecting the. 0:23:36.900 --> 0:23:39.40 Will Lytle There's so much hygiene to be used for this. 0:23:39.50 --> 0:23:40.580 Will Lytle At first, that's the case. 0:23:40.590 --> 0:23:44.700 Will Lytle Now I'm just going to filter out tasks at the moment so that we can get a more normalized view of the data. 0:23:44.790 --> 0:23:53.20 Will Lytle So it's less kind of red and basically what you would do with this metric and what a lot of clients this is particularly critical for a Kanban team. 0:23:53.90 --> 0:23:55.950 Will Lytle In fact, arguably the most important metric for a can ban team. 0:23:55.960 --> 0:24:3.280 Will Lytle But I do think that scrum teams equally can get a lot of value, but also at the same time live view is doing similar things with this. 0:24:3.890 --> 0:24:15.660 Will Lytle But essentially what this view allows you to see is you might say, OK, I only wanna focus focus on certain stages of the SDLC, so I've picked the stages that I care about. 0:24:15.700 --> 0:24:17.750 Will Lytle I kind of your cycle time from one way. 0:24:17.760 --> 0:24:20.150 Will Lytle Start development until we deliver to something. 0:24:20.240 --> 0:24:21.830 Will Lytle It covers all of these statuses. 0:24:22.360 --> 0:24:23.590 Will Lytle I want to focus. 0:24:23.640 --> 0:24:33.840 Will Lytle I've done this mostly for hygiene and the like, making it look clean and this example is focusing only on stories and support issues, but you might want to include bugs and so on. 0:24:34.690 --> 0:24:40.890 Will Lytle Basically what this is showing you is all of your inflight work, so we can see that we have one umm ticket here. 0:24:41.810 --> 0:24:55.990 Will Lytle The story, which is 8 points and it's currently in development now, it has been in development now for roughly 9 days, right, which puts it into the 85th percentile, probably halfway through the 85th percentile. 0:24:56.0 --> 0:25:0.870 Will Lytle So maybe closer somewhere to the 90th percentile compared to how we've historically worked. 0:25:1.220 --> 0:25:13.30 Will Lytle Now, this team in particular, because they have such a high time in development, right, there's a big kind of jump between these two in development and kind of the the code review in progress stages. 0:25:13.40 --> 0:25:14.370 Will Lytle I didn't know which one was being used. 0:25:14.380 --> 0:25:22.220 Will Lytle Still, I mean in progress might not actually be required anymore if it's been replaced by in development, so I'm gonna remove that for a second. 0:25:23.140 --> 0:25:23.690 Will Lytle Umm. 0:25:24.80 --> 0:25:31.110 Will Lytle But essentially what this shows you is where the ticket is currently compared to historical tickets, at what percentile? 0:25:31.120 --> 0:25:33.690 Will Lytle So right now it's, you know, 85th percentile. 0:25:35.350 --> 0:25:39.490 Will Lytle We're entering in the 85th percentile, cause I've removed the in progress from the overall calculation. 0:25:39.950 --> 0:25:57.400 Will Lytle Now, if this ticket is moved into code review, it will still remain in that, but if we're able to actually get it through into ready for test today that it will suddenly move below there and it will move into the 71st, 70th percentile, right? 0:25:57.620 --> 0:25:58.940 Will Lytle So it shows you kind of. 0:25:59.310 --> 0:26:10.430 Will Lytle If you were to kind of work through this and prioritize it today, it would basically move directly right across this chart and would show you ultimately where it will land relative to the historical data for that team, right. 0:26:11.0 --> 0:26:20.390 Will Lytle Typically, you'd expect to see more of a pop, pop, pop pop up, but the reason for this team why it's kind of shaped in this way is very largely because of. 0:26:22.460 --> 0:26:24.630 Will Lytle This metric here, which is their cycle time. 0:26:25.120 --> 0:26:36.590 Will Lytle OK, so the team doesn't actually spend a lot of time comparatively and ready for tests and in test and awaiting merge and blocked in code review, all of these things are relatively short comparative to the cycle time. 0:26:37.960 --> 0:26:44.450 Will Lytle But this would be, you know, you're looking at a story 14 days in development for a single story is is quite high. 0:26:46.160 --> 0:26:55.650 Will Lytle You know, typically you would expect, especially if it's a scrum team, you would expect an average story to be far less than the amount of days and an actual Sprint. 0:26:55.660 --> 0:27:14.260 Will Lytle But this is actually the same amount of days as an actual Sprint, so it suggests to me that either there's something going on with the hygiene or uh, you know, if I'm this team here I'm I'm thinking, OK, do we need to start breaking down our stories a bit more because if if these are representative of the size, then perhaps yes, Matthew. 0:27:16.460 --> 0:27:17.50 Matthew Frater Yeah. Hi. 0:27:17.60 --> 0:27:17.930 Matthew Frater Well, thank you. 0:27:18.40 --> 0:27:28.610 Matthew Frater But the question I've got really relates to what, what, what you're thinking about it for a story fails, QA gets put back into development after being everybody thought ready to merge. 0:27:31.610 --> 0:27:32.230 Will Lytle In terms of. 0:27:31.470 --> 0:27:32.370 Matthew Frater Like can you account for that? 0:27:36.610 --> 0:27:36.840 Matthew Frater Yeah. 0:27:34.280 --> 0:27:38.150 Will Lytle So it will still show you that time overall, right? 0:27:38.270 --> 0:27:45.100 Will Lytle I think where and this is I was actually interested in looking at this for this particular one, so there's a metric and I did this because we had a team. 0:27:45.110 --> 0:27:52.50 Will Lytle There's actually a webinar from one of our teams that was looking at this problem and there was what was clear is the team was oversizing their issues. 0:27:54.630 --> 0:27:56.10 Will Lytle We're not even oversizing. 0:27:56.20 --> 0:28:2.70 Will Lytle They were accepting too many eights and fives coming into their sprints rather than challenging those and trying to break them down. 0:28:2.80 --> 0:28:23.0 Will Lytle And as a result, there's a lot of risk being carried in, so there is a there is a metric here that kind of works in collaboration with that, which is your return rate and this allows you to specifically pick any transition between statuses that for you might represent a regression, OK and then it will show you the proportion of time that your tickets are regressing. 0:28:23.10 --> 0:28:24.220 Will Lytle So example here. 0:28:24.230 --> 0:28:25.820 Will Lytle I've picked all of these transitions. 0:28:26.400 --> 0:28:34.90 Will Lytle I've focused purely on stories and tasks, and I can see that on average our return rate is 20%, which isn't particularly high. 0:28:35.40 --> 0:28:53.290 Will Lytle Umm, I was expecting maybe to see it be a little bit higher for a team that spends, you know if if if the tickets are that high then that the other way of being able to look at that is actually something that's in the current North Star metrics which is this relationship here of stories and tasks, livered versus bugs and defects created. 0:28:53.600 --> 0:29:2.400 Will Lytle So you want to have a much higher proportion of stories and tasks delivered than bugs created in order to kind of demonstrate that a team is effectively breaking things down? 0:29:2.410 --> 0:29:12.170 Will Lytle That's one of the reasons why this is such an effective metric to generally looking at the high correlation between those two, the choose to break down the two, going back to your specific question, what do I think about it? 0:29:13.390 --> 0:29:20.410 Will Lytle Obviously, anything that is regressing is, you know you, you you want to be able to apportion that time realistically. 0:29:21.680 --> 0:29:25.800 Will Lytle So if you if if in development is so high because of a high return rate. 0:29:27.750 --> 0:29:35.960 Will Lytle Then you should be able to see that very clearly evidenced here in the return rate or there's another one called first time pass rate, which kind of measures the opposite of this. 0:29:36.970 --> 0:29:39.480 Will Lytle You'd also be able to see potentially in the bug resolution time. 0:29:39.490 --> 0:29:42.410 Will Lytle How much is being done so that those are two ways of looking at it? 0:29:46.690 --> 0:29:50.130 Will Lytle Umm, the bug resolution time. 0:29:52.690 --> 0:29:58.190 Will Lytle At the time which PR is going to skip to this one, first, the time to merge PR's is quite an interesting one. 0:29:58.290 --> 0:30:2.840 Will Lytle Most most teams are trying to give time to merge PR's within 24 hours. 0:30:3.750 --> 0:30:10.160 Will Lytle OK, now there are some interesting themes I think we spoke about this some weeks ago. 0:30:10.220 --> 0:30:18.990 Will Lytle So so this this looks essentially the more or less the code review process right from a PR being open to being reviewed, commented, and ultimately merged. 0:30:19.460 --> 0:30:40.180 Will Lytle And I don't know if this applies to this specific team, but when you look at how these Piers break down by different repositories, right there is the potential I think for for for some teams where if they're working in a shared environment where they're dependent on other other team, naturally their PR's are going to start to take a lot longer. 0:30:40.350 --> 0:30:42.140 Will Lytle I think we were looking at this a couple of months ago. 0:30:44.750 --> 0:30:54.260 Will Lytle The team that was we were looking at, I think I had three or four repositories and the ones that they kind of maintain themselves that are very good Sprint time to merge PR's. 0:30:55.440 --> 0:30:57.80 Will Lytle But there is a different one. 0:30:57.90 --> 0:31:2.650 Will Lytle Again, I don't know if it's this or a different, but it definitely wasn't this, but I don't know if this is a shared repository or not. 0:31:2.660 --> 0:31:10.230 Will Lytle What was quite clear is that there's a high correlation with, you know, the more the word dependent on other teams being involved in the pull request process. 0:31:10.440 --> 0:31:13.130 Will Lytle It had a factor of eight times of slow. 0:31:13.220 --> 0:31:15.370 Will Lytle Now, why does this matter so much? 0:31:15.700 --> 0:31:16.110 Will Lytle Really. 0:31:16.120 --> 0:31:21.130 Will Lytle Because the time to merge PR for most clients represents about 20 to 30% of your cycle time. 0:31:21.970 --> 0:31:26.740 Will Lytle Now you figure the average cycle time right now for a story is about 16.6 days. 0:31:27.650 --> 0:31:36.570 Will Lytle It takes 100 hours, so you know roughly 4 days to get through the actual Peru request process on average, right? 0:31:39.50 --> 0:31:42.580 Will Lytle I can't tell you the reasons why this is, but for me this is. 0:31:43.590 --> 0:31:44.830 Will Lytle This is a big flag, right? 0:31:44.840 --> 0:31:48.930 Will Lytle This is this is something that has a developed, you know, set up like a development team. 0:31:48.940 --> 0:31:55.150 Will Lytle I want to actually explore this and understand what's driving which drive in this data right. 0:31:57.770 --> 0:32:10.820 Will Lytle Is it dependencies on other teams and therefore maybe we need to get to, you know, get together with the other team leads and try to figure out a way of of optimizing this process a little bit or splitting out the code base and being able to allocate responsibility little bit differently. 0:32:10.830 --> 0:32:27.800 Will Lytle This is arguably, I think one of the big areas to consider and do to take a look at time to review is pretty solid, but it ultimately it's about time to get approval, which either means there's a lot of back and forth or ultimately got. 0:32:27.810 --> 0:32:34.340 Will Lytle I can tell you, I mean that that an engineering team can have a very quick and sensible conversation about trying to identify what are the reasons behind these. 0:32:35.250 --> 0:32:35.990 Will Lytle Yes, drum. 0:32:37.30 --> 0:32:37.440 Speaker 1 You want. 0:32:37.450 --> 0:32:52.910 Speaker 1 The concern is that like here is a people are maybe try to avoid some something, a pull request on a Friday because you know Saturday and Sunday will be counted and then that will spike out. 0:32:53.110 --> 0:32:54.180 Speaker 1 So what was your thought on that? 0:32:56.270 --> 0:33:0.830 Will Lytle I think statistically speaking, you'll find that that's not the case if you look at the days. 0:33:3.610 --> 0:33:3.940 Will Lytle So. 0:33:6.940 --> 0:33:8.140 Will Lytle I think if people's. 0:33:11.180 --> 0:33:16.870 Will Lytle If the takeaway here is to stop working on Fridays because it might carry over to the weekend, I think we've sort of missed the point. 0:33:18.780 --> 0:33:19.0 Will Lytle Right. 0:33:19.570 --> 0:33:21.170 Will Lytle Umm no. 0:33:21.230 --> 0:33:21.980 Will Lytle If, if. 0:33:21.990 --> 0:33:24.160 Will Lytle If that's the ultimate takeaway, I that's fine. 0:33:24.170 --> 0:33:26.80 Will Lytle But I think I'm. 0:33:26.260 --> 0:33:27.230 Will Lytle I don't know what to tell you. 0:33:27.240 --> 0:33:34.990 Will Lytle There at room, I think that's a conversation you need to have with the teams, cause I think that's quite clearly the the wrong outcome to have here on these metrics, right. 0:33:36.910 --> 0:33:37.730 Will Lytle For obvious reasons. 0:33:42.370 --> 0:33:43.510 Will Lytle Some PR count. 0:33:44.70 --> 0:33:53.130 Will Lytle This is not a view that I don't think a lot of people have looked at yet, and I wanted to show you guys this Peter the yeah, one move on. 0:33:51.600 --> 0:33:57.490 Peter Swanborough Umm is it not possible to simply omit non working days from the data? 0:33:59.820 --> 0:34:10.650 Will Lytle I'm not particularly because the concept of working day, even in an idea Gen, means a lot of different things and we have no idea where the person is based on, so we don't remove that overall. 0:34:11.40 --> 0:34:22.900 Will Lytle Plus, our argument is is time is actual time, whether it's working days or not, because the majority of time that you don't spend working actually happens in the evenings over the course of the week, not on the weekends, right? 0:34:22.910 --> 0:34:25.780 Will Lytle So you'd actually, if you wanted to see purely by working hours. 0:34:26.110 --> 0:34:30.260 Will Lytle Unfortunately, we'd have to know exactly who sits where, what their current working hours are. 0:34:31.40 --> 0:34:31.580 Will Lytle Umm. 0:34:31.720 --> 0:34:35.730 Will Lytle And that's not something we can easily do kind of globally across all of the different teams. 0:34:35.740 --> 0:34:38.280 Will Lytle And you know, we have people based in Asia. 0:34:38.290 --> 0:34:39.580 Will Lytle You have people based in Europe. 0:34:39.590 --> 0:34:43.760 Will Lytle You have people based, I think, even in the US so we show the data as it is. 0:34:44.570 --> 0:34:44.980 Peter Swanborough OK. 0:34:45.740 --> 0:34:46.110 Peter Swanborough Thank you. 0:34:47.80 --> 0:34:56.590 Will Lytle Or it's umm, now the breakdowns up PR count I think is where you can have some quite interesting conversations here. 0:35:0.170 --> 0:35:3.960 Will Lytle Point to this just looks at the the number of PR's right? 0:35:3.970 --> 0:35:6.740 Will Lytle And I'm going to just look at productive PR's at the moment. 0:35:6.750 --> 0:35:8.460 Will Lytle I appear ours at alternately merged. 0:35:9.410 --> 0:35:25.40 Will Lytle OK, now the reason I like this metric and again this is sumes that it's being interpreted the right way because it's very easy to interpret this in a very naive way, which is to look at PR count by author as some form of productivity. 0:35:25.630 --> 0:35:39.40 Will Lytle I think it in part in forms it, but you need to have a more sophisticated understanding of how developers are intended to spend their time between writing code, designing, supporting others and so on and so forth. 0:35:39.250 --> 0:35:44.830 Will Lytle But I do think that this gives you a meaningful portion of the view on that basis. 0:35:44.840 --> 0:35:47.10 Will Lytle So you can take a look at the PR count by author. 0:35:47.860 --> 0:35:54.750 Will Lytle You can break that down here and actually see the size of the PR's, so there are a number of clients that use this on a regular basis. 0:35:54.760 --> 0:36:1.30 Will Lytle To see all we actually make, are we creating PR's that are too large and that's bringing in additional risk? 0:36:1.40 --> 0:36:4.0 Will Lytle Are there certain individuals that are doing that now? 0:36:4.10 --> 0:36:5.580 Will Lytle I can't say that I've been doing this. 0:36:5.690 --> 0:36:6.570 Will Lytle You know, I would doubt that. 0:36:6.580 --> 0:36:9.420 Will Lytle I've been literally wrote 12,000 lines of code. 0:36:9.490 --> 0:36:12.100 Will Lytle If you did bless him, that's incredible. 0:36:12.200 --> 0:36:18.20 Will Lytle It's probably more of a library change here, but that library change even still in, you know, provides some level of risk. 0:36:18.30 --> 0:36:29.400 Will Lytle So from this perspective you can look at it from a throughput perspective, but also by the sizing perspective of it where I think this data is particularly interesting is if I look at it, this data broken down by participant. 0:36:29.690 --> 0:36:42.800 Will Lytle So overall, we had 75 PR that have been merged over the course of the last 12 weeks for this particular team, we can see how many of those PR's have been, uh, you know, done by author. 0:36:42.810 --> 0:36:45.450 Will Lytle So how does that 75 breakdown across the different authors? 0:36:46.510 --> 0:36:50.60 Will Lytle Participant shows you something very different, right? 0:36:50.70 --> 0:37:1.190 Will Lytle So there's Hafiz here, so one might look at this chart and think OK Hafiz is not a particularly productive member of this team, right? 0:37:1.660 --> 0:37:4.670 Will Lytle Which is exactly why I'm always very cautious about these metrics. 0:37:5.100 --> 0:37:18.720 Will Lytle The reality, if I look at this data by participant, I see something very different, which is I see that Avis is actually one of the most essential Members of this team because they are of the 75 PR's that have been merged. 0:37:18.950 --> 0:37:21.320 Will Lytle He has participated in 43 of them. 0:37:21.970 --> 0:37:23.580 Will Lytle I he has commented on them. 0:37:23.590 --> 0:37:24.560 Will Lytle He has reviewed them. 0:37:24.570 --> 0:37:25.420 Will Lytle He has merged them. 0:37:25.430 --> 0:37:28.980 Will Lytle He has approved them, so the role that he is playing is slightly different. 0:37:28.990 --> 0:37:42.300 Will Lytle So if you are an engineering lead, right, this is something a lot of our clients look at because it starts to then bring a more sophisticated view of the roles of different people are playing in the team and whether, for instance, you might think that you know Hafiz, this is great that you're doing this. 0:37:42.310 --> 0:37:46.490 Will Lytle But actually I need you to kind of I think we've we've overcorrected in this direction, right. 0:37:46.500 --> 0:37:49.720 Will Lytle I wanna, you know, maybe we should look at finding a little bit more balance next month, right? 0:37:49.730 --> 0:37:52.290 Will Lytle Because I do need you to actually work on XY and Z. 0:37:53.850 --> 0:38:2.360 Will Lytle On the flip side, you can see that certain people might just be authoring but not participating, right, and so there might be a conversation there around I. 0:38:3.90 --> 0:38:13.750 Will Lytle It's great that you're so productive from, you know, from a PR perspective, but I need you to work a little bit more on supporting different people on the team because the more we depend on one person, then the longer these things are gonna take. 0:38:13.760 --> 0:38:17.760 Will Lytle And this kind of goes hand in hand with the collaboration metric. 0:38:18.70 --> 0:38:22.710 Will Lytle Now, I would say generally with this diagram here, it's incredibly healthy, right? 0:38:23.850 --> 0:38:29.840 Will Lytle For those that that haven't used this metric before, it's not a metric in the sense of of a number. 0:38:29.950 --> 0:38:34.340 Will Lytle But what this shows you is the individual interactions in the pull request process. 0:38:34.510 --> 0:38:45.380 Will Lytle So who is working with whom and what proportion of time are people supporting others so you can see the outside of it will show you the proportion of things, proportion of participants who they're actually participating with. 0:38:45.570 --> 0:38:47.800 Will Lytle So you can see patterns of participation. 0:38:48.50 --> 0:38:53.120 Will Lytle For instance, certain people only working with other people, but you can see broadly what you're aiming for. 0:38:53.130 --> 0:38:56.970 Will Lytle Here is a fairly well balanced and distributed distribution across these. 0:38:57.280 --> 0:39:2.390 Will Lytle Now we're looking at a whole bunch of repositories, so this is more around People collaboration. 0:39:2.400 --> 0:39:4.540 Will Lytle But if you wanted to look at selenium for instance. 0:39:6.780 --> 0:39:18.350 Will Lytle And this might not be a good example of it, but selenium shows us something maybe slightly different, which is when we're working in this area of the code base, actually we're very reliant on Siri. 0:39:18.700 --> 0:39:26.310 Will Lytle Now again, this is sliding into this could be this could be something totally different, but imagine it is a just a normal repository, right? 0:39:26.410 --> 0:39:47.960 Will Lytle This could suggest that either there's a potential single point of failure and knowledge, or that one person is picking on taking on too much of the responsibility and the team would actually become far more efficient if that responsibility for reviewing PR's was distributed, which is to be part process change, part confidence building, but also part knowledge distribution. 0:39:48.500 --> 0:39:57.10 Will Lytle So a lot of our clients use this very heavily for identifying areas of their code base where there appears to be knowledge centralized in one person. 0:39:57.370 --> 0:40:1.760 Will Lytle That's a risk, obviously from a knowledge perspective, but also not going to do anything to speed the team up. 0:40:2.710 --> 0:40:7.220 Will Lytle Also, they look at it a lot for new joiners, so I can see for instance. 0:40:8.220 --> 0:40:10.910 Will Lytle But let's say it's Sateesh has just joined the team. 0:40:10.960 --> 0:40:13.870 Will Lytle I can see that you know in the last on Thor. 0:40:13.930 --> 0:40:19.460 Will Lytle No, he's just started getting involved, but actually it's part of his development program and on boarding process. 0:40:19.470 --> 0:40:23.970 Will Lytle And I want him to be working to review and approve more of the PR's. 0:40:24.350 --> 0:40:25.390 Will Lytle Right. So. 0:40:27.420 --> 0:40:45.870 Will Lytle Those 3 metrics, I think in combination or three views, the PR count by approver by participation and by PR collaboration really give a team lead some very interesting things to think about and potentially talk about as part of their risk mitigation with knowledge, knowledge distribution as well as onboarding new folks on our team. 0:40:51.140 --> 0:40:51.570 Will Lytle Umm. 0:40:52.760 --> 0:40:58.890 Will Lytle Last but not least is is the bug resolution time and I won't spend a lot of time on this because it is what it is right? 0:40:58.900 --> 0:41:2.520 Will Lytle How long does it take for us from a bug being open to being resolved, but? 0:41:5.160 --> 0:41:6.460 Will Lytle Why does this matter? 0:41:6.930 --> 0:41:8.920 Will Lytle I'm and and why do people care about it? 0:41:8.930 --> 0:41:15.20 Will Lytle So much so there's the obvious answer to this, which is if there's a bug, it probably impacts our users, and that's not good. 0:41:15.130 --> 0:41:19.800 Will Lytle And so the longer that thing exists, the more our user impacted and that's not good, right? 0:41:19.850 --> 0:41:27.400 Will Lytle That's the obvious answer, but where high performing to a lot of our clients are looking at this is is from a slightly different perspective. 0:41:27.410 --> 0:41:33.950 Will Lytle So this metric obviously only looks at the looks at all the bugs that you have completed, right? 0:41:33.960 --> 0:41:37.630 Will Lytle So they were important enough to complete the question. 0:41:37.640 --> 0:41:45.380 Will Lytle Here is 1 on resource utilization and how effectively we're spending our time to to resolve bugs. 0:41:45.930 --> 0:41:47.960 Will Lytle If I am an engineer, right? 0:41:48.320 --> 0:41:53.820 Will Lytle And I've just written a new feature and that feature has gone into QA. 0:41:54.830 --> 0:42:4.400 Will Lytle If I get a bug back the next day, it's going to typically be relatively trivial for me to fix that bug, assuming it's not something fundamentally wrong in the logic, right? 0:42:5.190 --> 0:42:16.510 Will Lytle However, if that bug sits in a backlog for 55 days on average, right, and obviously there's this one here, couple here that are skewing this a bit. 0:42:17.320 --> 0:42:21.520 Will Lytle So I'm going to just for the sake of mass, move this even to 85%. 0:42:25.560 --> 0:42:25.860 Will Lytle OK. 0:42:25.870 --> 0:42:27.410 Will Lytle Brings it down a little bit. 0:42:27.420 --> 0:42:28.0 Will Lytle Still not enough? 0:42:28.10 --> 0:42:29.170 Will Lytle There's still a few more up there. 0:42:29.340 --> 0:42:32.180 Will Lytle I think there was a bulk closure here where they were closed as resolved. 0:42:32.190 --> 0:42:32.870 Will Lytle There's something but. 0:42:34.880 --> 0:42:36.430 Will Lytle Yeah, yeah, alright. 0:42:38.930 --> 0:42:40.280 Will Lytle We'll get there eventually. 0:42:41.690 --> 0:42:42.290 Will Lytle Maybe we won't. 0:42:46.200 --> 0:42:58.290 Will Lytle Would recommend that if you do do bulk closures, please make sure you mark them as resolution not done so that you have a way of actually excluding them from the data because those were just closed as done. 0:42:58.620 --> 0:43:0.20 Will Lytle But I'm guessing they weren't all done. 0:43:0.30 --> 0:43:6.420 Will Lytle I'm guessing that was just built closure of hygiene, but let's say that this was more realistic, right? 0:43:6.430 --> 0:43:8.620 Will Lytle And this is a lot more healthy, right? 0:43:8.630 --> 0:43:15.670 Will Lytle Because what this is then saying is that an average, you know, our tickets are going to developers and then they can resolve within 9.3 days. 0:43:15.990 --> 0:43:28.190 Will Lytle The difference here being is that the longer it takes for you to resolve bugs right, the longer the time is between the work we are doing in the code base that originally created this bug versus when this bug came back to us. 0:43:29.80 --> 0:43:37.70 Will Lytle And it is significantly faster for developer to have work on short feedback loops and resolve these quickly, which is going to have a direct impact on the productivity of a team. 0:43:37.500 --> 0:43:51.270 Will Lytle Now this is part responsibility of the team, but really part responsibility of the product owner as well, because if the product owner is just prioritizing stories at the consequence of bugs and that bug backlog is building up over time, they are forcing this problem. 0:43:52.300 --> 0:43:56.570 Will Lytle Obviously unknowing me, you know, nobody nobody knowingly makes this problem in thing. 0:43:56.580 --> 0:43:59.590 Will Lytle But the reality is, is we are all working to Rd maps. 0:43:59.600 --> 0:44:17.290 Will Lytle Plandek is working to Rd maps and so we are making conscious decisions on our side to make sure that we are very, very keen on keeping this number as low as possible because we know that it takes they say something like for after two weeks it takes the develop after three days it takes the developer 8 times as long. 0:44:17.300 --> 0:44:19.470 Will Lytle I'm not sure I totally buy that or how that was measured. 0:44:19.720 --> 0:44:23.630 Will Lytle Point being here is it does take a developer a hell of a lot longer to go back. 0:44:23.640 --> 0:44:24.930 Will Lytle Remember what they're working on? 0:44:24.940 --> 0:44:27.390 Will Lytle Look through the code base and trying to figure out what is that thing. 0:44:28.500 --> 0:44:36.420 Will Lytle Whereas if the bug was reported to them a day later, they'd be much easier to be able to be much easier for them to be able to OHS this, resolve it and move on in life. 0:44:36.600 --> 0:44:38.470 Will Lytle And that has a huge impact on capacity. 0:44:38.760 --> 0:44:43.280 Will Lytle What the team has the ability to get through and a particular Sprint, so I would definitely take that in mind. 0:44:44.40 --> 0:44:49.320 Will Lytle Umm, now on the Kanban side, I'm I'm conscious there are some can ban teams here. 0:44:50.210 --> 0:44:53.200 Will Lytle I won't spend a lot of time didactically going through campaign. 0:44:54.790 --> 0:45:2.40 Will Lytle There is an article which we've pointed to a large number of times that we've written E that corresponds to this dashboard. 0:45:2.50 --> 0:45:2.740 Will Lytle If you spell it correctly. 0:45:5.190 --> 0:45:5.890 Will Lytle Umm. 0:45:7.170 --> 0:45:8.970 Will Lytle Which is Key Cam then METRICS. 0:45:8.980 --> 0:45:12.420 Will Lytle I'm Plandek and this is a refresher on, you know, Cam band. 0:45:12.430 --> 0:45:13.280 Will Lytle What is Cam band? 0:45:13.290 --> 0:45:18.980 Will Lytle What are the behaviors you're trying to optimize for more of the kind of background context and introduce introduce to some of the metrics. 0:45:19.630 --> 0:45:27.120 Will Lytle This article works hand in hand with this, but ultimately the end of the day if you're doing Kanban, you shouldn't be doing Kanban because you're trying to avoid doing sprints. 0:45:27.590 --> 0:45:28.860 Will Lytle But that's not the right reason. 0:45:28.930 --> 0:45:39.120 Will Lytle I know that's a common reason, but it's not the right reason I'm if you're trying to do Cam ban, it's because you're effectively trying to drive a system where you're balancing input and output, right? 0:45:39.370 --> 0:45:46.650 Will Lytle And you're able to balance that system through effectively identifying alleviating waste in that process and you're able to. 0:45:48.720 --> 0:45:54.110 Will Lytle Work on tickets work on a backlog of similarly sized items, right? 0:45:54.120 --> 0:45:58.650 Will Lytle So the can man team needs this similar size that items in order to be able to drive and measure the right behaviors. 0:45:59.710 --> 0:46:17.40 Will Lytle So lead time to value we've we've spoken about a little bit cycle time from Dev start to done time to merge PR S We've talked about already, throughput is your main measure here of throughput from the system and what you need to be able to do is balance throughput with input into that system. 0:46:17.150 --> 0:46:26.300 Will Lytle So you can see here is this system is relatively well balanced, 56 in 150 out in terms of what's created versus what's completed into the system. 0:46:26.310 --> 0:46:27.100 Will Lytle Into the system. 0:46:27.490 --> 0:46:41.160 Will Lytle Now there is an argument here that there is a strong backlog right, and the only way that this team is currently going to be able to burn down that backlog with the system input and output as is, is by increasing the output or slowing the input to be honest. 0:46:41.170 --> 0:46:42.500 Will Lytle But you're not going to. 0:46:42.510 --> 0:46:43.630 Will Lytle You're not going to slow input. 0:46:43.690 --> 0:46:44.480 Will Lytle Let's be honest. 0:46:44.570 --> 0:46:52.260 Will Lytle So you can either do that through elevating ways in the process, or by upscaling or upsizing the capacity of the team. 0:46:52.750 --> 0:47:0.970 Will Lytle OK, so the flow efficiency which will partially work will help you to measure the proportion of time that tickets are actively being worked on. 0:47:0.980 --> 0:47:5.510 Will Lytle And this is an essential one for Kanban teams, but also I think very useful for Scrum teams. 0:47:6.230 --> 0:47:8.170 Will Lytle But maybe in a slightly different part of that process. 0:47:8.180 --> 0:47:19.830 Will Lytle But basically what this shows you of all the tickets that we have delivered over the last 12 weeks, if we define these databases as the statuses where somebody was actively working on the ticket, essentially how much time was that ticket queuing? 0:47:19.920 --> 0:47:29.260 Will Lytle What proportion of time was that taking, queuing and so the time it was active over the over the total time is essentially your workflow efficiency, otherwise known as your flow efficiency. 0:47:29.310 --> 0:47:41.100 Will Lytle So one of your key flow metrics now this would be somewhat depending on the workflow, but you can see exactly why this can't be so useful for a team to be able to identify waste in their process. 0:47:41.410 --> 0:47:42.600 Will Lytle So this will color code. 0:47:42.610 --> 0:47:52.520 Will Lytle The active is orange and inactive or queuing is blue and you can see exactly where the largest amount of queuing time is picked up by this particular team. 0:47:53.530 --> 0:47:53.790 Will Lytle What was? 0:47:53.800 --> 0:47:56.90 Will Lytle You could potentially argue, but it could be closed. 0:47:56.100 --> 0:47:57.780 Will Lytle But removed from this metric. 0:47:58.80 --> 0:48:4.700 Will Lytle But this allows you then to like visualize that active in queuing, similar to actually how the workflow is set up itself. 0:48:4.790 --> 0:48:22.90 Will Lytle So if you wanted to improve the work efficient deploy efficiency of this team, right, the backlog is kind of critical area, either the ultimate backlog or the ready for development backlog are the kind of two areas that are critical awaiting refinement as well that. 0:48:24.480 --> 0:48:24.910 Will Lytle Umm. 0:48:26.430 --> 0:48:30.540 Will Lytle 8 minutes left before I, before I go into anything else. 0:48:30.550 --> 0:48:33.610 Will Lytle I guess I wanted to pause and. 0:48:36.980 --> 0:48:41.300 Will Lytle Happened to use the next 9 minutes going over any specific questions or specific use cases. 0:48:42.580 --> 0:48:44.600 Will Lytle I'm there. 0:48:44.610 --> 0:48:55.700 Will Lytle There are a load of different use cases and so it's hard for me sometimes to be able to just randomly generate potential use cases, but hopefully some of these been helpful today, but if there's any real ones I think that would be yes, yes ma'am. 0:48:57.140 --> 0:48:58.450 Mah Jin-Khai Just one question though. 0:48:58.460 --> 0:48:59.450 Mah Jin-Khai What is the? 0:48:59.820 --> 0:49:3.280 Mah Jin-Khai What is the expectation and definition of the high performance teams? 0:49:4.140 --> 0:49:9.480 Mah Jin-Khai Is there a meeting all the target of the metrics or they they something else we need to we need to know? 0:49:12.900 --> 0:49:16.130 Will Lytle I'm getting my definition and then whether you buy it or not is up to you. 0:49:17.520 --> 0:49:19.90 Will Lytle Umm, we don't. 0:49:19.320 --> 0:49:30.190 Will Lytle We don't have anything in our tool that declares you or high performing or not, and the reason being is because there's a lot of context behind teams that we will never understand because of the data that we're looking at. 0:49:30.230 --> 0:49:33.700 Will Lytle So I don't know, for instance, that you're working on a desktop application. 0:49:33.710 --> 0:49:45.910 Will Lytle That's reasonably gonna be deployed once a quarter or maybe even once a year versus you're working on cloud native apps in AWS and you can see how both of those contexts would significantly change the type of data that we would see. 0:49:45.920 --> 0:49:50.450 Will Lytle So Plandek does not prescribe any sort of performance bases. 0:49:50.820 --> 0:49:53.720 Will Lytle I think my argument and the argument that I've made. 0:49:55.590 --> 0:49:58.500 Will Lytle Uh relation to the benchmarks. 0:49:58.590 --> 0:50:13.200 Will Lytle Otherwise high performance is a state of mind, which sounds like a cheesy thing to say, but the reality is is when you look at high performing teams, it's not that they are hitting metrics data points all the time, right? 0:50:13.620 --> 0:50:23.660 Will Lytle It's that they are aware of what these data points are and have the ability to react and remediate when they're starting to get off track on what their plans are. 0:50:23.730 --> 0:50:26.900 Will Lytle So high performance for me is as a team. 0:50:26.910 --> 0:50:33.760 Will Lytle I wanna be regular, you know, high performing team is one that is regularly engaged at the data, knows exactly what's dragging them down right. 0:50:33.770 --> 0:50:44.110 Will Lytle We can give you indicators, for instance, if this is a cloud native app, but I can tell you that you know the top 25% of Plandek clients are at the moment 17 hours. 0:50:44.160 --> 0:50:46.200 Will Lytle I think it's the number, right? 0:50:46.450 --> 0:50:54.10 Will Lytle So they will merge PR S within 17 hours and the top 50% I think is I have to look at the recent benchmarks that we're we've just done. 0:50:54.420 --> 0:51:5.270 Will Lytle I can tell you where that is, but what I can't tell you as to what extent some of these teams are working in certain ways that might slow them down fundamentally or as opposed to to other ways. 0:51:5.340 --> 0:51:7.270 Will Lytle So that's why we don't productize it as such. 0:51:7.280 --> 0:51:16.920 Will Lytle Because we don't have context and it's not fair because I think the minute you declare a team is low performing without having 100% confidence behind that tag. 0:51:17.860 --> 0:51:22.630 Will Lytle That tag then gets picked up by somebody else, and then other things happened which have nothing to do with the intended. 0:51:23.730 --> 0:51:26.310 Will Lytle Umm of this right? 0:51:26.580 --> 0:51:31.10 Will Lytle That's my view on it and it's a bit cheesy, but this is a perfect example of why that is the case. 0:51:32.90 --> 0:51:39.670 Will Lytle When you look at Hafiz, for instance, the difference between these two charts here demonstrates exactly what I mean by the context and why that's so important. 0:51:40.920 --> 0:51:51.100 Will Lytle So high performance is really something that you need to be driving at the team level, you know, and today is hopefully is a step in that direction of you know, this is how it working. 0:51:51.210 --> 0:51:53.240 Will Lytle This is the behaviors we're trying to drive. 0:51:53.250 --> 0:51:59.20 Will Lytle These are the metrics that help us measure where we are in that journey and when we get off course, we know we're off course. 0:51:59.30 --> 0:52:1.880 Will Lytle We have a conversation about being what's driving us being off course. 0:52:1.890 --> 0:52:14.950 Will Lytle We put some remedial actions and we get better because none of the high performing teams that teams that I would consider high performing, none of them do this well all the time like nobody does it well all the time. 0:52:14.960 --> 0:52:16.540 Will Lytle That's not a thing, right? 0:52:16.600 --> 0:52:27.670 Will Lytle It it's you know you will optimize for one behavior and you will inadvertently overcorrect and cause another problem and then you have to refocus on that and it's that's the thing about continuous improvement it's it's it's a never ending journey. 0:52:28.670 --> 0:52:32.390 Will Lytle So high performance is about being on that journey in a more sophisticated way as opposed to. 0:52:33.960 --> 0:52:37.340 Will Lytle Falling into particular benchmark or framework would be my argument. 0:52:43.310 --> 0:52:43.710 Will Lytle Umm. 0:52:49.200 --> 0:52:51.490 Will Lytle I think if you're not using live view, I was. 0:52:51.500 --> 0:52:56.40 Will Lytle I was with a client yesterday doing a A the meaning we were we're looking through. 0:52:56.50 --> 0:53:4.290 Will Lytle So it's there is a high correlation generally with performance and and interactions with live view, right, which is good to hear, it's good product feedback. 0:53:5.420 --> 0:53:13.100 Will Lytle I think with the last five minutes I'll spend talking a little bit about live view because I think if anything, this is probably the most important thing that you should be interacting with on a daily basis. 0:53:14.350 --> 0:53:16.520 Will Lytle Now live view what is live view. 0:53:16.530 --> 0:53:29.230 Will Lytle So everything we've looked at today is very much historically focused, right, looking at the past, learning some lessons and taking that forward right live view is about helping you monitor what's in flight right now, either through a Sprint or through an epic. 0:53:29.950 --> 0:53:41.20 Will Lytle And what it's doing is it's looking at your data and it's comparing it to how you have historically worked I and what it's trying to do is establish where there might potentially be some risks and how you're delivering. 0:53:41.150 --> 0:53:42.870 Will Lytle So if we look at this particular team here. 0:53:44.170 --> 0:53:51.280 Will Lytle Umm, you can see whether on the basis of story points or tickets, how they're distributed throughout the different status categories. 0:53:51.650 --> 0:53:57.180 Will Lytle You can update these and the reason I say that's important is because you can see here that there are tickets without a commit. 0:53:58.350 --> 0:54:3.610 Will Lytle What's in progress is based on what you what's configured as an in progress status in JIRA by default. 0:54:4.650 --> 0:54:8.960 Will Lytle So that means it will pick up things like Indesign if Indesign is a blue status. 0:54:9.510 --> 0:54:11.570 Will Lytle That said, you can just move it. 0:54:13.470 --> 0:54:14.120 Will Lytle And apply it. 0:54:17.180 --> 0:54:17.590 Will Lytle Right. 0:54:18.40 --> 0:54:22.390 Will Lytle Which then, if that was in one of those statuses, would actually move that over. 0:54:22.840 --> 0:54:29.630 Will Lytle But you can see here that one of its awaiting merge and one of its in test now interesting that they're waiting. 0:54:29.640 --> 0:54:40.960 Will Lytle Merge doesn't have a commit that would suggest to me that that commit about PR does not link to this ticket, which is why Plandek thinks that this ticket doesn't link to any code base. 0:54:41.20 --> 0:54:47.630 Will Lytle So that's a nice little hygiene flight for you, but the whole point with this for a team is really twofold. 0:54:48.180 --> 0:54:50.550 Will Lytle One is how? 0:54:50.560 --> 0:54:50.890 Will Lytle How? 0:54:50.900 --> 0:54:55.930 Will Lytle How how can we help you broaden understanding of risk when it comes to sprints? 0:54:56.60 --> 0:55:5.0 Will Lytle So what are the things that can happen that can potentially distract us or keep us from being a successful and accomplishing our goals right? 0:55:5.920 --> 0:55:15.550 Will Lytle There are five examples or 10 examples here of things that we think well, we know how statistically relevant in terms of a team success rate. 0:55:15.560 --> 0:55:19.190 Will Lytle So that left hand side will give you the overall quotient, which we can look at in a second. 0:55:19.420 --> 0:55:23.450 Will Lytle There's one day left, right, based on the current burn down. 0:55:23.520 --> 0:55:25.100 Will Lytle The team is on track, right? 0:55:25.500 --> 0:55:29.810 Will Lytle So, given where they are right now, they are on track to actually meet that goal. 0:55:29.900 --> 0:55:32.90 Will Lytle So if you do love a burn down, there you go. 0:55:32.340 --> 0:55:51.20 Will Lytle I think what's more interesting I think is like delayed pull requests and delayed PR's because this can show you specifically we'll look at waiting merge that this support issue has been awaiting merge for 9 days, which is above the normal threshold of one day compared to support issues of five story points in this workspace. 0:55:51.30 --> 0:55:54.880 Will Lytle So Plandek is looking at historically and it's looking at. 0:55:57.320 --> 0:56:6.130 Will Lytle Not only comparing support issues versus other support issues, but if they're story pointed, we'll also compare 5 pointers against other five pointers, which is where we come uh this one day. 0:56:6.280 --> 0:56:8.520 Will Lytle So it's all relative, right? 0:56:8.720 --> 0:56:13.480 Will Lytle You could acknowledge it when you've seen it, so if not linked to any development work, you could acknowledge it would hide it. 0:56:14.130 --> 0:56:24.180 Will Lytle Umm, you normally would be able to see the full trail, the audit trail as that moves through the different tools which you won't hear because it's not linked. 0:56:24.190 --> 0:56:27.560 Will Lytle Any development work which suggests that basically it's it's not linked. 0:56:28.50 --> 0:56:33.950 Will Lytle There's no link in the PR that commit to this ticket, but the idea here, and I won't go through all of these today. 0:56:34.880 --> 0:56:36.740 Will Lytle You can click the how does it work? 0:56:36.820 --> 0:56:40.610 Will Lytle This will give you kind of a high level understanding of the risk rating and so on. 0:56:41.100 --> 0:56:45.870 Will Lytle But if you click here in the bottom, there's a detailed explanation behind everything in my view. 0:56:45.980 --> 0:56:48.50 Will Lytle So you can see how the calculations are done. 0:56:48.480 --> 0:56:58.630 Will Lytle You can see how the different insights are weighted in terms of impact to those she different wedding groups, whether they're available for epics and for sprints. 0:57:0.530 --> 0:57:12.550 Will Lytle We'll show you the logic behind this Sprint burn down, which takes into consideration weekend days and gives you a great period of the start before establishing what the baseline is for where you should be, and it will tell you about all of the different insights. 0:57:12.560 --> 0:57:19.790 Will Lytle Here the idea behind it really is 1 to help teams think about risk more broadly when it comes to a Sprint, and also to then give them some insights. 0:57:20.490 --> 0:57:27.390 Will Lytle And our team, I know we're done now, so I'll, I'll leave it here, but what I'd recommend for for teams is to to use it. 0:57:27.430 --> 0:57:29.30 Will Lytle You know, there's one day left in the Sprint. 0:57:29.550 --> 0:57:33.710 Will Lytle So, you know, show me only the tickets that have insights against them. 0:57:33.980 --> 0:57:38.640 Will Lytle And I wanna all open at the moment not only three here. 0:57:38.650 --> 0:57:47.220 Will Lytle So you probably just go through them, but and maybe the start of the Sprint where there's more of these, you can actually use this to go one by one through your stand up, right. 0:57:47.450 --> 0:58:2.290 Will Lytle And you can each have a conversation about what's driving these and have their acknowledged the insights that they're move on or actually you do something about it in that session which will help you to then umm hopefully make a big difference in how you everything. 0:58:2.300 --> 0:58:6.50 Will Lytle So a pause because it is it is the hour. 0:58:8.640 --> 0:58:9.530 Will Lytle Was that helpful? 0:58:9.620 --> 0:58:10.280 Will Lytle Was that kind of what? 0:58:11.90 --> 0:58:12.100 Will Lytle What you're looking for today? 0:58:14.370 --> 0:58:17.620 Speaker 1 Yeah, 2 there's a question and a comment. 0:58:18.130 --> 0:58:19.500 Speaker 1 So SueAnn ends. 0:58:19.640 --> 0:58:29.930 Speaker 1 Asked if there's a way to undo what is committed to the start of the spring, we have the scenario where someone was cleaning a ticket and he accidentally got allocated to a Sprint. 0:58:31.750 --> 0:58:32.960 Will Lytle Uh, unfortunately, no. 0:58:34.290 --> 0:58:37.200 Will Lytle Because we we we can't understand the context of accident. 0:58:37.910 --> 0:58:39.530 Will Lytle Umm so. 0:58:42.480 --> 0:58:42.800 Will Lytle You. 0:58:42.570 --> 0:58:47.460 SueAnn See So the context here is that someone was cloning the ticket, so it really happened. 0:58:50.540 --> 0:58:50.640 SueAnn See Yeah. 0:58:49.80 --> 0:58:52.190 Will Lytle No, no, for sure, but we can't differentiate. 0:58:52.200 --> 0:58:52.410 Will Lytle What? 0:58:52.420 --> 0:58:52.630 Will Lytle What? 0:58:52.640 --> 0:58:52.890 Will Lytle What? 0:58:52.900 --> 0:58:56.740 Will Lytle What was the result of a cloning and an accident going into a Sprint versus not? 0:58:58.700 --> 0:59:2.650 Will Lytle You could delete the clone ticket and start again, right? 0:59:3.170 --> 0:59:4.860 Will Lytle I'm that will work. 0:59:5.810 --> 0:59:6.290 Will Lytle Umm. 0:59:6.70 --> 0:59:6.870 SueAnn See Umm. 0:59:7.20 --> 0:59:8.780 SueAnn See It umm. 0:59:6.430 --> 0:59:12.540 Will Lytle But once the ticket enters a Sprint, you essentially have committed the ticket to the Sprint, even if it's by accident. 0:59:12.550 --> 0:59:15.100 Will Lytle We don't know that it was by accident, which is why we then show it. 0:59:19.310 --> 0:59:21.120 SueAnn See OK, but this will mess up the metrics. 0:59:21.130 --> 0:59:27.550 SueAnn See I mean, even if there is a a, maybe something available to the admin that will help I guess. 0:59:35.980 --> 0:59:36.160 Will Lytle OK. 0:59:35.620 --> 0:59:42.990 Speaker 1 Well, I think, yeah, if it's accidentally created you can approach me so then or anyone else. 0:59:43.740 --> 0:59:47.590 Speaker 1 Yeah, we had a few occasions where it was mistakenly created. 0:59:54.910 --> 0:59:55.250 Speaker 1 Umm. 0:59:50.350 --> 0:59:58.620 SueAnn See No, in this case you have to unassign from the Sprint commit, so I don't think there is a way to do that in JIRA. 0:59:58.690 --> 0:59:59.280 SueAnn See I I'm not sure. 1:0:2.530 --> 1:0:3.180 Will Lytle Yeah, I mean you can. 1:0:4.360 --> 1:0:4.540 Speaker 1 Yeah. 1:0:5.830 --> 1:0:6.930 Speaker 1 Umm Yep. 1:0:3.190 --> 1:0:9.70 Will Lytle You can either delete the ticket that was accidentally created in the Sprint and start again so that it's not created in the Sprint. 1:0:9.860 --> 1:0:12.420 Will Lytle Umm, because Jerry will have the same problem right? 1:0:12.430 --> 1:0:14.870 Will Lytle There is gonna show you the same thing, which is that you added a ticket to the Sprint. 1:0:15.900 --> 1:0:16.410 Will Lytle Umm. 1:0:16.750 --> 1:0:19.440 Will Lytle So nobody knows any wiser that it was done by accident. 1:0:19.910 --> 1:0:30.280 Will Lytle The other thing you could use is potentially some labels, but I'm very reluctant to to suggest that as a way of excluding that can have other impacts as well. 1:0:30.930 --> 1:0:31.330 Will Lytle Umm. 1:0:34.580 --> 1:0:34.860 Speaker 1 OK. 1:0:34.920 --> 1:0:36.280 Will Lytle But that would, I think, the deletion. 1:0:36.290 --> 1:0:38.550 Will Lytle If you notice it's happened, just delete it and clone outside. 1:0:38.560 --> 1:0:39.800 Will Lytle It would be the easiest for mediation. 1:0:41.480 --> 1:0:41.700 Speaker 1 OK. 1:0:43.430 --> 1:0:43.970 Speaker 1 OK. 1:0:44.210 --> 1:0:53.940 Speaker 1 Second, by met behavioral tickets without commits for one of our teams, they often lead to data fixes as opposed to code fixes. 1:0:54.410 --> 1:0:56.540 Speaker 1 Suspect that's messing bit of metrics too. 1:0:57.150 --> 1:1:2.130 Speaker 1 Does that sound like a kind of some kind of exclusive exclusionary status? 1:1:7.80 --> 1:1:9.330 Will Lytle Umm, I'd have to look at it. 1:1:9.340 --> 1:1:15.760 Will Lytle I I would guess that either, umm, if you're in live view it's either because of the status mappings. 1:1:15.770 --> 1:1:19.590 Will Lytle I have the ticket is in progress but it's not in progress from a development perspective. 1:1:19.600 --> 1:1:26.10 Will Lytle So you can do what I did just a moment ago, which is say that that status is A to do status for the purpose of live view. 1:1:26.400 --> 1:1:30.130 Will Lytle So yes, it's technically in progress and design, but that's not meaning. 1:1:30.140 --> 1:1:31.70 Will Lytle It's in development. 1:1:31.760 --> 1:1:35.920 Will Lytle The other thing with the reference ability of course, is if you look at. 1:1:38.660 --> 1:1:39.60 Will Lytle Umm. 1:1:42.720 --> 1:1:43.140 Will Lytle Keyboard is. 1:1:56.800 --> 1:2:4.650 Will Lytle So that the the our logic of mappings, as long as we're gathering the JIRA data and which we obviously are in this case and as long as we're gathering the repo. 1:2:4.820 --> 1:2:10.370 Will Lytle So obviously, make sure that the repo is being gathered, because if it's not being gathered then that's gonna be the problem for as well. 1:2:10.780 --> 1:2:12.630 Will Lytle Plandek will look at the commit message. 1:2:12.960 --> 1:2:22.500 Will Lytle It will also look at the pull request title, the pull request description, the pull request comments, and we'll look for the ticket Key if we can map that ticket key to a ticket that we're gathering, we will link those two together. 1:2:23.370 --> 1:2:35.460 Will Lytle This logic worth works bidirectionally, which means if you have no links in your commits, but ultimately you put a ticket reference in the PR title, the commits will inherit that. 1:2:35.540 --> 1:2:45.660 Will Lytle If the commits are within that PR, and vice versa, if the PR contained, if the commit message contains the ticket reference but a PR doesn't, it will then apply that ticket. 1:2:45.670 --> 1:2:48.940 Will Lytle If the committee is in that PR, then that PR will also pick up the ticket reference. 1:2:48.950 --> 1:2:53.690 Will Lytle So we do quite a work bidirectionally with it, but with that being said, I would. 1:2:53.740 --> 1:3:0.10 Will Lytle I would first check this just to make sure that there's nothing goofy, goofy happening there. 1:3:0.160 --> 1:3:4.170 Will Lytle Secondly, just double check that the the pull requests are there. 1:3:4.380 --> 1:3:8.950 Will Lytle If there are commits that you do think, hey, this is linked to this ticket, here's an example of it. 1:3:9.0 --> 1:3:12.620 Will Lytle Show it to us and we'll we'll we can triage it, but it should pick up. 1:3:13.640 --> 1:3:16.670 Will Lytle Umm should pick up of it automatically. 1:3:23.590 --> 1:3:24.600 Speaker 1 Anymore questions? 1:3:30.370 --> 1:3:34.70 Speaker 1 It looks like there's no Yep thing has been helpful. 1:3:34.80 --> 1:3:35.550 Speaker 1 I think this personally for me. 1:3:36.340 --> 1:3:36.850 Speaker 1 Thanks. 1:3:36.980 --> 1:3:44.600 Speaker 1 Thanks again view for your sharing and yeah, hopefully we all learn quite a bit from this session today. 1:3:45.920 --> 1:3:46.920 Will Lytle Perfect. Lovely. 1:3:46.780 --> 1:3:47.90 Speaker 1 Right. 1:3:47.510 --> 1:3:48.60 Speaker 1 OK. 1:3:47.0 --> 1:3:48.270 Will Lytle Well, have a wonderful day. 1:3:48.700 --> 1:3:49.100 Will Lytle Speak soon. 1:3:48.140 --> 1:3:49.520 Speaker 1 OK, great. 1:3:49.690 --> 1:3:50.40 Speaker 1 OK. 1:3:50.50 --> 1:3:50.580 Speaker 1 Enjoy. 1:3:50.670 --> 1:3:51.860 Speaker 1 Enjoy the rest of your day, everyone. 1:3:51.870 --> 1:3:52.190 Speaker 1 Thank you. 1:3:52.870 --> 1:3:54.110 Matthew Frater Thank you very much and bye. 1:3:53.970 --> 1:3:54.780 Speaker 1 Alright, bye bye. 1:3:54.840 --> 1:3:55.410 Iris Tan Ai Lee Thank you. Bye.
- Assistant
In the meeting, Will Lytle discusses various aspects of using data analytics for Agile and Scrum methodologies. The focus is on how teams can use data to track performance, identify potential issues, and improve predictability. Will emphasizes the importance of a collaborative conversation and encourages attendees to share any specific use cases or challenges they have so that he can provide more relevant examples.
Key points discussed in the meeting include:
- Sprint predictability and how understanding team capacity and velocity can help plan and execute work more consistently.