gpt-3.5-turbo-0125· OpenAI
WildChat-4.8M (AI2)
please correct the garmmar: • Sullage tank: - IC to check the minimum requirement. - AP…
- User
please correct the garmmar: • Sullage tank:
- IC to check the minimum requirement.
- AP propose tank top bottom to adjust up 100mm for the volume to be increased.
- Assistant
• Sullage tank:
- IC is to check the minimum requirements.
- AP proposes raising the tank top bottom by up to 100mm in order to increase the volume.
- User
please correct the grammar: • Main engine exhaust proposal. Sketches to be ready today for verification. Sitting outboard side transom Fr 0-1, above waterline for the location of exhaust.
- Assistant
• Main engine exhaust proposal: Sketches need to be ready today for verification. The exhaust is to be located on the outboard side transom Fr 0-1, above the waterline.
- User
please correct the grammar: Hello Jorge, I have requested the milestone billing on Seacat one. Is the invoice ready for signing?
- Assistant
Hello Jorge,
I have requested milestone billing for Seacat one. Is the invoice ready for signing?