Conklin Company manufactures several different products. In its traditional costing…
- User
Conklin Company manufactures several different products. In its traditional costing system, overhead costs are allocated based on a predetermined rate using direct labor hours as the basis. The company recently switched to an activity-based costing system using different cost drivers for each of their two activities. Information is as follows:
Estimated Activity
Predetermined Overhead Rate
Labor hours:
100,000
$12 per labor hour
Number of designs:
6,000
$32 per design
Job #63E required 22 labor hours and 3 designs. What would be the overhead allocated to Job #63E under the traditional costing system?
42.24 264.00 $484.00
- Assistant
To calculate the overhead allocated to Job #63E under the traditional costing system, we need to calculate the total overhead cost based on the predetermined rate for labor hours and the predetermined rate for the number of designs.
Overhead allocated for labor hours = Labor hours x Predetermined overhead rate for labor hours = 22 labor hours x 264.00