make method statement and risk assessment for
sockets with relocation of existing power sockets
including conduits cable all accessories. All
sockets shall be with baby safe coverings
32 Installation client issued LED recessed spot lights
in the Gypsum false ceiling including conduits,
Cable, DBs, and all accessories
33 Installation of client supplied out door LED flood
lights on existing poles, walls, including cable
laying switches automatic controls
34 Supply and installation of (4 Power + 6 Data )
sockets with relocation of existing power sockets
including conduits cable all accessories. All
sockets shall be with baby safe coverings
35 Supply and installation of (2 Power + 2 Data )
sockets wit for 5 TV Units, including conduits
cable all accessories. All sockets shall be with baby
36 Supply and installation of (1 Power + 1 Data )
sockets wit for Printer, Scanner, Schrader, Kiosk
including conduits cable all accessories. All
sockets shall be with baby safe coverings
37 Supply and installation of Power and Data cables
including conduits with all accessories for Access
control for all Doors
38 Supply and installation of Industrial Switches and
Outdoor cables, including conduits with all
accessories
39 Modification of existing DB's according to new
electrical power points and lights.
40 Supply and installation of floor boxes 2 Power
points ,Conducting and cabling
Nos 20.00 388.78 7,775.60
41 Single control switches for all 3 bed rooms at First
floor including conduits cable all accessories
42 Modification of existing LV Panels as per
additional load requirements (100 KW) with all
cables and required accessories.
Excavation, Interlock stone removal and
reinstallation. 80cm dept excavation. 20cm sand
bed, cable laying, 20cm sand bed, warning type,
back filling and interlock stone reinstallation. "
44 Supply and installation of SMDB 200 Amps 8 way
SMDB
Lots 1.00 7,985.61 7,985.61
45 Installation of 100 A 3 pole isolator Nos 4.00 1,669.64 6,678.56
46 Supply and laying 4C X 25 CU/ XLPE/ PVC and 1CX
16 CU/ ECC/ PVC from SMDB to isolator including
GI tray work
Mtr 15.00 494.48 7,417.20
47 Glanding and termination Lots 1.00 1,565.77 1,565.77
48 Power allocation including cabling for new A/C
units including external(Portacabin & Screening
area)
49 Electrical drawing preparation approvals from
ADDC including consultancy
Additional scope
50 Supply and installation of external cabling works
for ANBR maintenance including excavation
backfilling , supply and laying 50 MM HDPE
conduiting (EXCAVATION UPTO 80 CM FROM
FDL), Supply and installation of power provision
for motorized gate from the villa complex
51 Trunking and conduiting of additional camera
points internal and external
52 Shifting switches & sockets, Thermostats inside
the 3 Bedrooms to be removed and fixed Outside.
53 supply and installation of electrical power points
54 Supply and installation of eleand conduiting works for turnstile gates
electrical power points
and conduiting works for full HD camera at
screening area
55 Supply and Installation of Self Contained
Emergency Light 2W
56 Labelling of all switches and sockets (for its use).