A nuclide of deuterium and a nuclide of tritium undergo nuclear fusion. (i) Each fusion…
- User
A nuclide of deuterium and a nuclide of tritium undergo nuclear fusion. (i) Each fusion reaction releases 2.8×10 J of energy. Calculate the rate, in kg s , at which tritium must be fused to produce a power output of 250 MW.
- Assistant
To calculate the rate at which tritium must be fused, we need to first convert the power output to energy per second.
1 MW = 10^6 W 250 MW = 250 x 10^6 W
So, the power output is 250 x 10^6 W.
We are given that each fusion reaction releases 2.8 x 10 J of energy.
To calculate the rate at which tritium must be fused, we can use the formula:
Rate = Power output / Energy per fusion reaction
Rate = (250 x 10^6 W) / (2.8 x 10 J)
Now, we need to convert the energy from joules to electronvolts (eV) to match the units of the fusion reaction energy.
1 eV = 1.6 x 10^-19 J
So, the energy per fusion reaction in eV is: