Franklin Manufacturing uses a job order costing system that charges overhead to jobs on…
- User
Franklin Manufacturing uses a job order costing system that charges overhead to jobs on the basis of direct labor cost. Franklin used the following cost predictions: overhead costs 695,000. At year-end, the company's records show that actual overhead costs for the year are 692,000. a. Determine the predetermined overhead rate for the year. b. Compute the amount of overapplied or underapplied overhead.
- Assistant
a. The predetermined overhead rate for the year can be calculated by dividing the estimated overhead costs by the estimated direct labor costs.
Predetermined overhead rate = Estimated overhead costs / Estimated direct labor costs = 695,000 ≈ 1.85
b. To calculate the amount of overapplied or underapplied overhead, we need to compare the actual overhead costs with the overhead applied based on the predetermined overhead rate.
Overapplied/Underapplied overhead = Actual overhead costs - Overhead applied = 1,278,800 - (1.85 * 1,278,800 - 400
Therefore, the amount of underapplied overhead is $400.