rewrite audit report Storage and inventory process was reviewed PM-PRODCONT-12 rev…
- User
rewrite audit report Storage and inventory process was reviewed PM-PRODCONT-12 rev 10/3/22. Process objective was parts are protected and available to meet production/shipping requirements. Receipt of supplied components are put away stock to assure stock rotation. Inventory levels are updated. Stock is sent to production. When product is complete, stock is returned to be shipped. Shipments are prepared and records are maintained. Deterioration audits are conducted twice a year in conjunction with physical inventory. Shippers, Instruction list, quantity of parts and Stagers are logged in the WMS (Warehouse Management System) system. Viewed labels properly place on both side of skids in production. Viewed records for pick list and stage confirmation. Four products were on hold for quality inspect in receiving. Those orders were #6971, #1230NP, #0402, #2580. Those orders were determined ok for production after first product inspect and sent to storage. Flux and chemicals were received at door 11. Other raw materials were received in raw material storage. Shipping records were reviewed. Scanners were used to verify product against the order. The truck doors were scanned against product placed in truck, Holds were placed on material that did not match the scanned information. Master labels were used on finished goods. Some customers have their own labels for the products. Shipper for Honda part 1011967 had all required paperwork including load information sheet, Staging, Honda checklist for quality parts and ASN time accepted. Product #52810T , 2022101105 for TMMK had proper paperwork including ship date, stage confirmation which matched the BOL.
- Assistant