what does this mean: Requirement to Obtain Approval. An Owner must obtain approval from…
- User
what does this mean: Requirement to Obtain Approval. An Owner must obtain approval from the Review Entity for the construction, reconstruction, or alteration of any Improvement located in the Community, including the installation of solar energy systems and the addition or placement of accessory buildings, or to alter the topography or natural or existing surface drainage of the Community, or to install, plant, alter, or maintain any landscaping exposed to streets or open areas, or to install any utility line (wire or conduit) on or over any Lot prior to the commencement of such work. The requirement applies to the construction, reconstruction, or alteration of any Improvements located within any Community Use Area. If such work does not constitute a material change in the design or color of original construction or Improvements already approved in accordance with this Declaration, it shall be sufficient for an Owner to notify the Review Entity in writing before commencing the work, and prior approval shall not be required unless the Review Entity determines that such work constitutes a material change. An Owner must also obtain approval from the Review Entity of the content of any Subordinate Restrictions that the Owner intends to record. Approval is not required for any work done or for any Subordinate Restrictions to be recorded by or for Declarant or by or for the MHCSD.
- Assistant
This passage indicates that in order to make any construction, reconstruction, or alteration to any property within the community, including installing solar energy systems, adding accessory buildings, changing the landscape, or installing utility lines, the owner must obtain approval from the Review Entity before starting the work. This requirement also applies to any improvements within the Community Use Area.
However, if the proposed work does not significantly change the design or color of the original construction or improvements that have already been approved, the owner only needs to inform the Review Entity in writing before starting, and prior approval may not be necessary unless the Review Entity deems it to be a significant change.
Additionally, if the owner plans to create any Subordinate Restrictions and record them, they must also seek approval from the Review Entity. However, approval is not required if the work or Subordinate Restrictions are being done by the Declarant (developer) or the MHCSD (presumably a homeowners' association or governing entity).
- User
Make this more convincing: I would like to add a small pond in front of my home door. When standing in front of my home, the front door is located on the right side of the house, which the front door is not visible from the street. The requested pond would also not be visible from the street because it is in ground, and I live in a cul-de-sac.
To comply with state law on digging, 8-1-1 was contacted and all utility companies were notified and responded with clear (no-conflict) to existing utility lines.
To comply with MHCSD CC&R’s, I am writing to seek approval before starting the construction of this pond.
- Assistant
Dear Review Entity,
I hope this letter finds you well. I am writing to formally request approval for a small pond that I would like to add in front of my home's entrance.
Firstly, I would like to highlight that the front door of my house is located on the right side, making it invisible from the street. Moreover, the requested pond will be situated in-ground and will not be visible from the street due to my residence being located in a cul-de-sac. This ensures that the addition of the pond will not disrupt the overall aesthetics of the community or any views from the public domain.
In accordance with state laws and safety regulations, I have taken the necessary steps to ensure that this construction project adheres to all necessary guidelines. Specifically, I have contacted the utility companies through the designated 8-1-1 hotline to perform location checks. As a result, all utility companies have responded with clear (no-conflict) confirmation, indicating that the proposed pond will not interfere with any existing utility lines.