Parramatta Companv has two departments. X and V. Overhead is applied based on direct labour cost in Department X and machine-hours in Department V. The following additional information is available:
Budgeted Amounts
Direct labour cost
Factory overhead
Machine-hours
Department X
Department Y
18000051650005225000180.000
51.000 mh
40.000 mh
Actual data for Job #10
Department K
Desartment Y
Direct materials requisitioned 10000516000Directlabourcost11000
54000
5000 mh
3000 mh
Machine-hours
Required:
A - Compute the budgeted factory overhead rate for Department&
B - Compute the budgeted factory overhead rate for Denatment
C What is the total overhead cost of Job #10?
D - IF Job #10 consists of 50 units of product what is the unit cost or ins, it
Assistant
A - To compute the budgeted factory overhead rate for Department X, divide the budgeted factory overhead by the budgeted direct labor cost:
Budgeted factory overhead rate for Department X = Budgeted factory overhead for Department X / Budgeted direct labor cost for Department X
= 180,000/516,000
= $0.349
B - To compute the budgeted factory overhead rate for Department Y, divide the budgeted factory overhead by the budgeted machine-hours:
User
Kirkland Company manufactures a part for use in its production of hats When 10
000 items are produced, the costs per unit are:
Direct materials
6.00 per unit. The plant facilities could be used to manufacture another item at a savings of 1.00 per unit of fixed manufacturing overhead on the original item would be eliminated. Required:
A - What is the relevant per unit cost for the original part?
B - Which alternative is best for Kirkland Company? By how much?
Assistant
A - The relevant per unit cost for the original part can be calculated by subtracting the savings from the cost of the original part:
Relevant per unit cost for the original part = Total cost per unit - Savings per unit
= (0.60+3.00 + 1.20+1.60) - 6.40 - 5.40
Budgeted factory overhead rate for Department Y = Budgeted factory overhead for Department Y / Budgeted machine-hours for Department Y
= 5,225,000/40,000mh=130.625 per mh
C - To calculate the total overhead cost of Job #10, multiply the actual machine-hours for Department X by the budgeted factory overhead rate for Department X, and add it to the actual machine-hours for Department Y multiplied by the budgeted factory overhead rate for Department Y:
Total overhead cost of Job #10 = (Actual machine-hours for Department X * Budgeted factory overhead rate for Department X) + (Actual machine-hours for Department Y * Budgeted factory overhead rate for Department Y)
= (5,000 mh * 0.349)+(3,000mh∗130.625)
= 1,745+391,875
= $393,620
D - To calculate the unit cost of Job #10, divide the total overhead cost of Job #10 by the number of units:
Unit cost of Job #10 = Total overhead cost of Job #10 / Number of units
= 393,620/50units=7,872.40
B - To determine which alternative is best for Kirkland Company, we need to compare the cost of manufacturing the part in-house to the cost of purchasing it from Mike Company.
Option 1: Manufacturing in-house
Cost per unit = 5.40Totalcost=5.40 * 10,000 units = $54,000
Option 2: Purchasing from Mike Company
Cost per unit = 6.00Totalcost=6.00 * 10,000 units = $60,000
The best alternative for Kirkland Company is to manufacture the part in-house, as it would result in a cost savings of 6,000(60,000 - $54,000).