Crows Nest Manufacturing uses departmental cost driver rates to apply manufacturing overhead costs to products. Manufacturing overhead costs are applied on the basis of machine-hours in the Machining Department and on the basis of direct labour-hours in the Assembly Department. At the beginning of 2013, the following estimates were provided for the coming year:
Machining Assembly
Direct labour-hours
10.000 dlh
90 000 dlh
Machine-hours
100 000 mh 5000 mh
Direct labour cost
80000720 000
Manufacturing overhead costs 250000360 000
The accounting records of the company show the following data for Job #846: Machining Assembly
Direct labour-hours
100 dih 170 dlh
Machine-hours
270 mh 30 mh
Direct material cost
37002600
Direct labour cost
8001900
Required:
A - Compute the manufacturing overhead allocation rate for each department.
B - Compute the total cost of Job #846.
Provide possible reasons why Crows Nest Manufacturing uses two different cost-allocation rates.
Assistant
A - To compute the manufacturing overhead allocation rate for each department, we divide the manufacturing overhead costs for each department by the corresponding cost driver:
Machining Department:
Manufacturing Overhead Allocation Rate = Machining Department Manufacturing Overhead Costs / Machining Department Machine-Hours
= 2.50 per machine-hour
250,000/100,000machine−hours=
Assembly Department:
Manufacturing Overhead Allocation Rate = Assembly Department Manufacturing Overhead Costs / Assembly Department Direct Labour-Hours
= 360,000/90,000directlabour−hours=4.00 per direct labour-hour
B - To compute the total cost of Job #846, we sum up the direct material costs, direct labour costs, and the allocated manufacturing overhead costs for each department:
Machining Department:
Allocated Manufacturing Overhead Costs = Machining Department Machine-Hours x Machining Department Allocation Rate
= 270 machine-hours x 2.50permachine−hour=675
Assembly Department:
Allocated Manufacturing Overhead Costs = Assembly Department Direct Labour-Hours x Assembly Department Allocation Rate
= 170 direct labour-hours x 4.00perdirectlabour−hour=680
Total Cost of Job #846 = Direct Material Costs + Direct Labour Costs + Allocated Manufacturing Overhead Costs
= 3,700+800 + 675+2,600 + 1,900+680
= $10,355
C - Crows Nest Manufacturing uses two different cost-allocation rates because different departments may incur manufacturing overhead costs at different rates and have different cost drivers. The Machining Department incurs more manufacturing overhead costs in relation to machine-hours, while the Assembly Department incurs more manufacturing overhead costs in relation to direct labour-hours. Therefore, using separate cost-allocation rates allows for a more accurate allocation of manufacturing overhead costs to products based on the specific drivers in each department.