翻译接下来发的英文片段成中文
Jump to turn (8)
- 1翻译接下来发的英文片段成中文
- 2Abstract-Signal timing is the technique which traffic engineers use to determine
- 3接着翻译
- 4To develop critical gap and follow up-time forIndian road condition to take into
- 5韦伯斯特信号配时法有什么缺点?
- 6接着上面的问题 韦伯斯特一般适用于多长的信号周期
- 7翻译下列英文至中文
- 8A fixed-time traffic control system is widely used to manage the traffic flow at
- User
翻译接下来发的英文片段成中文
- Assistant
Sure, please provide the English paragraph for translation.
- User
Abstract-Signal timing is the technique which traffic engineers use to determine who has the right-of-way at anintersection. Signal timing involves deciding how much green time the traffic lights shall provide at an intersectionapproach. How long the pedestrian walk signal should be, and many numerous other factors. The design of traffic signalnowadays has become an important factor for major intersections of towns and cities.Traffic signal controls the movementof traffic and not only reduces accidents but enables the road safety users to effectively use the area of road at intersection.Traffic volume studies are conducted to determine the number,movements,, and classifications of roadway vehicles at agiven location. These data can help to identify critical flow time periods,determine the influence of large vehicles orpedestrians on vehicle traffic flow, or document traffic volume trends. The length of the sampling period depends in thetype of count being taken and the intended use of the data recorded. Webster method is a rational approach for signaldesign. The design is simple and is totally based on formulas laid down by Webster, in this method, the total cycle of thesignal is determined which forms a total least delay occurring at signal.