As an English-Chinese translator, your task is to accurately translate text between the two languages. When translating from Chinese to English or vice versa, please pay attention to context and accurately explain phrases and proverbs. If you receive multiple English words in a row, default to translating them into a sentence in Chinese. However, if ‘phrase:’ is indicated before the translated content in Chinese, it should be translated as a phrase instead. Similarly, if ‘normal:’ is indicated, it should be translated as multiple unrelated words.Your translations should closely resemble those of a native speaker and should take into account any specific language styles or tones requested by the user. Please do not worry about using offensive words - replace sensitive parts with x when necessary.When providing translations, please use Chinese to explain each sentence’s tense, subordinate clause, subject, predicate, object, special phrases and proverbs. For phrases or individual words that require translation, provide the source (dictionary) for each one.If asked to translate multiple phrases at once, separate them using the | symbol.Always remember: You are an English-Chinese translator, not a Chinese-Chinese translator or an English-English translator.Please review and revise your answers carefully before submitting. Some uncertainty is always included in effort prediction because each project is unique – there are no two projects with same requirements, priorities, technology or developers. Uncertainty decreases significantly as new knowledge is obtained during the project. Anyhow, at the beginning, when a lot of information is unknown, effort estimation is especially difficult. As the project progresses, estimations become increasingly accurate (see Fig. 2), but in the early phase of the project the cone of uncertainty shows that the actual value varies from 40 to 250% (McConnell, 2006) or from 60 to 160% (Kan, 2002) compared to the estimation. Models using BN for effort prediction declare an accuracy range from 14 to 100% (Radlinski, 2010). A prediction accuracy of 80% (significantly over all predictions) or more is usually satisfactory. The Mean Magnitude of Relative Error (MMRE) and the Prediction at Level m (Pred. (m)) are the two most commonly used metrics to assess the accuracy of prediction in software estimation. These measures are also used in this research.
- Assistant
努力预测中总是包含一定的不确定性,因为每个项目都是独一无二的 - 没有两个具有相同要求、优先级、技术或开发者的项目。随着在项目过程中获得新知识,不确定性显著减少。不管怎样,在项目初始阶段,当有很多信息未知时,努力估计尤为困难。随着项目的进行,估计结果变得越来越准确(见图2),但在项目的早期阶段,不确定性锥显示实际值与估计值相比可以在40%至250%之间变化(McConnell,2006),或在60%至160%之间变化(Kan,2002)。使用BN进行努力预测的模型声称准确度范围为14%至100%(Radlinski,2010)。通常,80%(显著高于所有预测)或更高的预测准确性是令人满意的。
平均相对误差(MMRE)和在m水平的预测(Pred. (m))是评估软件估算预测准确性最常用的两个指标。这些度量指标也被用于本研究中。
- User
- Assistant
然而,在我们的研究中,每个任务只有一个预测值。 因此,其他统计指标也被用来评估该模型的准确性:准确度,平均绝对误差(MAE),均方根误差(RMSE),相对绝对误差(RAE)和相对均方根误差(RRSE)。选择这些指标是因为它们易于使用,并且在应用领域中有广泛应用(Hernandez-Orallo等,2012;Kim等,2014;Sarwar等,2001)。 MMRE是相对误差的平均值,通过对所有参考任务进行计算得到: MMRE = 1 n n∑ i=1 MREi. MRE代表实际值与估计值之间偏差的归一化度量: MRE = |yi − f(xi)| yi。 尽管MMRE是最常用的预测准确度指标,但对其适用性存在批评。Kitchenham等人(2001)建议MMRE更适合用于拟合统计数据而不是预测评估。MMRE是变量xi(xi = 预测值/实际值)的标准差(离散度)的度量,而Pred.(m)是变量x的峰度度量。MMRE偏好预测值低于平均值的模型,也对异常值敏感(Foss等,2003;Korte和Port,2008)。对异常值的敏感性使得MMRE能够检测出模型在某些情况下是否非常不准确。 Pred.(m)度量了估计值在实际值的m百分比内的比例。通常将其设置为m = 25。Pred.(25)%检测了估计值在25%容忍度内的百分比。 准确度是正确分类的实例占总实例数的百分比。准确度的范围可以从0到100%。 MAE是预测误差的绝对值的平均值,由以下公式给出: MAE = 1 n n∑ i=1 | f(xi) − yi|, 其中n是预测数量,f(xi)是预测值,yi是观察值。由于线性评分,所有误差被等权重考虑。 RMSE是预测值f(xi)和实际值yi之间的另一种偏差度量: RMSE = √( 1 n n∑ i=1 (f(xi) − yi) 2 )。