I would like to report the project status colloquially, including the content: "Project…
- User
I would like to report the project status colloquially, including the content: "Project status from Red to yellow", "NTAP agreed the workaround for [BZ#6559]&[BZ#6576] and JDS shipped partial P1B systems to NTAP on 8/23 (POR ETD: 8/21). JDS to prepare the rework instructions to NTAP for the remaining P1B systems rework at JWX.", "Defect Status: BZ#6559 System powered down during system stress and PSU went into standby mode. → NTAP released SFPGA 0.7 and BMC released beta FW on 8/25. Dev. is working on verification with new SFPGA and beta BMC. BZ#6576 System hangs during AC power cycle stress. → IC vendor Renesas provided new VR FW on 8/25 and Dev. is working on VR FW verification. BZ#6605 I226 stress test failed. → The issue is under investigation by Dev. BZ#6609 Error message "IA32 Exception Type - 0D(#GP - General Protection)" found at POST during AC power cycle. → The issue is under investigation by Dev."
- Assistant
Here's a colloquial report on the project status:
"The project status has gone from red to yellow. Some progress has been made and some challenges still remain.
Recently, NTAP agreed on a workaround for two bugs, namely BZ#6559 and BZ#6576. Additionally, JDS has shipped partially reworked P1B systems to NTAP on 8/23 (POR estimated time of delivery was 8/21). Now, JDS is preparing rework instructions for the remaining P1B systems at JWX.
Let's take a look at the defect status:
-
BZ#6559 (Severity 1): The system powered down during system stress and the PSU went into standby mode. To address this, NTAP released SFPGA 0.7 and BMC released beta FW on 8/25. Development is currently working on verifying the new SFPGA and beta BMC.
-
BZ#6576 (Severity 1): The system hangs during AC power cycle stress. In response, IC vendor Renesas provided new VR FW on 8/25, and the development team is currently working on verifying this VR FW.
-