Skip to content
TheChatArchiveThe Chat Archive
gpt-3.5-turbo-0613· OpenAIAi2 WildChat-4.8M (AI2)

根据一下内容写一份可量化的okr KR1:货品链路治理并完成优化提升专项落地 DB-es不同步等问题 WHC&货品双向同步链路 - KA1:…

  1. User

    根据一下内容写一份可量化的okr KR1:货品链路治理并完成优化提升专项落地 DB-es不同步等问题 WHC&货品双向同步链路

    • KA1: 解决whc采集数据回传到货品后先生效后审批,拒绝审批后数据被覆盖,造成数据不一致问题
    • KA2:解决抖音超市行业货品的重量信息写入商品失败问题
    • KA3:解决货品的变更下发whc失败造成的不一致问题 KR2:ES数据写入链路专题治理
    • KA1:优化直连ES写入导致的超时问题
    • KA2:优化货主下存在大量货品更新易超时引起的数据不一致问题
    • KA3:货主数据和DB数据缺少一致性核对能力且缺少补偿能力
  2. Assistant

    KR1: Improve and optimize the governance of the product supply chain and successfully implement the optimization project.

    Key Result 1: Resolve the issue of data inconsistency caused by WHC data being overridden after approval rejection.

    • Key Action 1: Fix the bug where WHC data is applied before approval and rejected approvals overwrite the data in the product system.
    • Key Action 2: Implement a solution to ensure that rejected approvals do not result in data inconsistency.

    Key Result 2: Solve the problem of weight information not being written into the product system for products in the Douyin supermarket industry.

    • Key Action 1: Identify and fix the issue preventing the successful writing of weight information into the product system for products in the Douyin supermarket industry.

    Key Result 3: Resolve the inconsistency issue caused by failed distribution of product changes to WHC.

    • Key Action 1: Identify and fix the issue causing the failure in distributing product changes to WHC, resulting in data inconsistency.

    KR2: Governance of the ES data writing link.

    Key Result 1: Optimize the direct ES writing process to prevent timeouts.

    • Key Action 1: Identify and resolve the underlying causes leading to timeouts during the direct ES writing process.

    Key Result 2: Address the issue of data inconsistency caused by a high number of product updates from the shipper resulting in timeouts.

    • Key Action 1: Optimize the system to handle a large volume of product updates from the shipper, avoiding timeouts and ensuring data consistency.

    Key Result 3: Enhance consistency checking and compensation abilities between shipper data and DB data.

    • Key Action 1: Develop a mechanism to regularly check and ensure consistency between shipper data and DB data.
    • Key Action 2: Implement a compensation process to rectify any discrepancies found between shipper data and DB data.