Consider a car project and develop the WBS to the work package level, then subdivide one…
- User
Consider a car project and develop the WBS to the work package level, then subdivide one of the work package into a number of activities for time planning.
- Assistant
-
Project initiation 1.1 Develop project charter 1.2 Identify stakeholders 1.3 Conduct market research
-
Design 2.1 Develop car concept 2.2 Define technical specifications 2.3 Create design sketches 2.4 Develop detailed 2D and 3D CAD design
-
Engineering 3.1 Validate material and components 3.2 Develop prototype parts 3.3 Build and test prototype 3.4 Refine engineering designs
-
Manufacturing 4.1 Develop manufacturing process 4.2 Establish production facilities 4.3 Train staff 4.4 Produce pilot run
-
Quality control 5.1 Develop quality control plan 5.2 Inspect components 5.3 Verify assembly process 5.4 Conduct performance testing 5.5 Perform final inspection
-
Marketing and sales 6.1 Develop marketing strategy 6.2 Create promotional materials 6.3 Launch promotional events 6.4 Set up sales channels
-