Anthropic 52B (HH-RLHF research model)· Anthropic Anthropic HH-RLHF
How long does it take for concrete to reach maximum strength after it has been poured?
- User
Human: How long does it take for concrete to reach maximum strength after it has been poured?
- Assistant
Concrete can reach its maximum strength in anywhere from 24 to 48 hours, depending on the temperature and relative humidity, the mix of concrete, and the amount of water in the mix.
Other models, same or similar prompt
Responses were produced in different, uncontrolled contexts (system prompts, settings, prior turns). This is not a benchmark.