-
Technical Collaboration: Assumes that internal engineering teams are available and willing to collaborate on the project. This may not be the case if the teams are overwhelmed with other tasks or not aligned with the objectives of the project.
-
Code Refactoring: Assumes that the existing code is modifiable and does not have any dependencies that could interfere with the refactoring process. If the code is poorly structured or has many dependencies, refactoring could be more difficult or even impossible.
-
Performance and Scalability: Assumes that the performance and scalability issues can be identified and resolved through refactoring. If the issues are deeply rooted in the system design or other factors, they may not be easily resolved.
-
Establishment of a Foundation: Assumes that the technical ecosystem will support the new foundation. If the ecosystem is complex or constantly changing, it may be difficult to establish a stable foundation.
-
Validation of MA Components: Assumes that all components of MA requiring validation can be identified. If some components are overlooked or not well-documented, they may not be validated properly.
-
Validation with Quality and CSV Teams: Assumes that these teams have the necessary skills and resources to perform the validation. If they lack expertise or resources, the validation may not be thorough or accurate.
-
Development of a Validation Framework: Assumes that a suitable framework can be developed for validating dynamic AI systems and static document decomposition systems. If these systems are too complex or have unique validation requirements, a suitable framework may not be feasible.
-
Online Training Materials: Assumes that the necessary content and resources are available for creating comprehensive training materials. If the necessary resources are not available, the training materials may not be as comprehensive as desired.
-
Execution of Trainings: Assumes that the trainings can be executed as planned. If there are scheduling conflicts or other issues, the trainings may not be executed as planned.
-
Support Team: Assumes that a team is available to provide support during and after the trainings. If there are not enough resources for a support team, participants