pecialPlastic company aims to organize a new production system as the typical job shop…
- User
pecialPlastic company aims to organize a new production system as the typical job shop layout. Three different departments (M1, M2, M3) will be designed and installed, which will serve to produce at least four product families (A, B, C, D). We have the following information: (in brackets the processing times) Product A is realized with a production process, visiting M1 (10 min/piece), M2 (10 min/piece) and M3 (5 min/piece) Product B is realized with a production process, visiting M1 (5 min/piece) and M2 (5 min/piece) Product C is realized with a production process, visiting M1 (5 min/piece) and M3 (10 min/piece) Product D is realized with a production process, visiting M1 (5 min/piece), M2 (10 min/piece) Annual Demand is equal to 50000 pieces/year for product A, 50000 pieces/year for product B, 50000 pieces/year for product C, 50000 pieces/year for product D. The production system will work maximum 300 days/year. M1 and M3 will work with 2 shifts/day (8 hours/shift), while M2 could work with 2 or 3 shifts/day (8 hours/shift). In the design, you should use the following coefficients: • M1, M2 and M3 consider a human coefficient (HC) of 0.95 and an Availability (A) of 0.9. • For each change of production, setups could last 2 hours in M1, M2 and M3. • The scheduling efficiency (SE) must be set equal to 0.80. • There are no scraps (information to be used for defining SR) and there are no other coefficients. • It is expected to produce average batches of 5000 pieces (regardless of the type of product). In your design, maximum expected machine saturation should be fixed to 95%. True False The number of machines needed for department M1 is less than 4 The number of machines needed for department M3 is less than 3 The saturation of department M2 when it is working on three shifts is lower than 80% The number of machines needed for department M2 when it is working on two shifts is more than 6 The saturation of department M2, when it is working on two shifts, is higher than when it is working on three shifts. The yearly workload of department M1 ranges between 22000 and 23000 hours The needed number of hours dedicated to setup in the department M3 is between 30 and 35 hours The number of lots for product A is between 9 and 12
Other models, same or similar prompt
Responses were produced in different, uncontrolled contexts (system prompts, settings, prior turns). This is not a benchmark.