  1. User

    Create a JSON structure containing the following fields: "inspectionStatus" (classified as "complete" or "failed"), "comments" (free text), "workDone" (restricted to "trim/cut" or "remove/fell"), "workOutstanding" (described as "trim/cut" or "fell/remove"), "FRCIssued" (boolean, cannot be true when "inspectionStatus" is "complete"), "treeQuantity" (integer), "species," and "followUpDate" (specified as an interval in days, months, or years). Note that there can be multiple rows of data. the data is: there are 7 acer trimmed but require felling not meeting required clearance FRC issued follow up in 10 days failed. 17 pohutakawa trees felled and clearance is met complete

  2. Assistant

    Here's an example JSON structure that meets the requirements you specified:

    [
      {
        "inspectionStatus": "failed",
        "comments": "There are 7 acer trees that require felling as they have been trimmed but do not meet the required clearance. FRC has been issued and a follow-up is required in 10 days.",
        "workDone": "trim/cut",
        "workOutstanding": "fell/remove",
        "FRCIssued": true,
        "treeQuantity": 7,
        "species": "acer",
        "followUpDate": "10 days"
      },
      {
        "inspectionStatus": "complete",
        "comments": "17 pohutakawa trees have been felled and clearance has been met.",
        "workDone": "remove/fell",
        "workOutstanding": "",
        "FRCIssued": false,
        "treeQuantity": 17,
        "species": "pohutakawa",
        "followUpDate": ""
      }
    ]
    

    This JSON structure contains two rows of data, each with their own set of properties. The first row represents an inspection where the acer trees have been trimmed but do not meet the required clearance, so the inspection has failed. The second row represents an inspection where the pohutakawa trees have been felled and clearance has been met, so the inspection has been completed successfully.