With the details below. * Example of demonstrated most or all of the positive indicators…
- User
With the details below.
- Example of demonstrated most or all of the positive indicators related to the skills assessed. Strong examples/evidence provided
- Please provide actual work example / case study / with the value of cost / percentage
- You can include other methodologies, international standards, UK regulatory, UK legal compliance, any relevant resources
- working as a Engineering Project Manager
Positive Indicators • Focusses on what matters to stakeholders • Is seen as trusted and reliable by stakeholders and is listened to as a result • Influences effectively through building strong relationships • Assesses through feedback whether stakeholder needs have been met • Focuses on delivering outcomes with measurable benefits for stakeholders
Details: As a Project Manager, I was responsible for managing the Shell Draugen umbilical Installation Project, this is a construction of umbilical from onshore to offshore Draugen Oil Field platform at North Sea.
During the construction phase, I discovered discrepancies in the safety reports submitted by a major subcontractor which didn’t align with Construction Design Management (CDM 2015) regulation. The reports, crucial for ensuring compliance with SHEQ regulations, were filled with inconsistencies and potential hazards overlooked. This raised concerns about their commitment to safety and transparency, jeopardizing trust and potentially delaying project milestones.
Inconsistencies in the safety reports such as: Incomplete Hazard Identification, Inaccurate Risk Assessment, Missing Safety Controls, Contradictory Compliance Statements.
please answer the questions: Stakeholder Management Give me an example of when you have influenced a key stakeholder. • What was the situation? • Who did you need to influence? • What was your approach? • What objections did you face? • How did you overcome them? • What was the outcome?
please create or hypnotise an actual work example using Construction Design Management (CDM 2015) regulation.
Assistant
Here is a potential example work case study addressing the questions:
Situation: As the Project Manager for the Shell Draugen umbilical installation project, I discovered numerous inconsistencies and safety issues in the reports submitted by one of our major subcontractors who was responsible for high risk construction activities. This raised serious concerns about their commitment to safety and compliance with Construction Design Management (CDM 2015) regulations.
Key stakeholder to influence: The Managing Director of the subcontractor company who was ultimately responsible for the quality of reports and compliance.
My approach: I scheduled a meeting with the Managing Director to discuss my findings in the reports. Rather than accusing or demanding changes, I took an informative approach to build understanding. I walked through specific examples of inconsistencies and potential hazards that were overlooked. I emphasized my role is ensuring the project meets all legal and safety requirements to protect workers.
Objections faced:
The Managing Director was defensive and tried to downplay the issues. He claimed it was an administrative error and that their safety processes were solid. He resisted any impact to project timelines or budgets to address the problems.Overcoming objections: I acknowledged the pressure to keep timelines and budgets but stressed the legal and ethical importance of safety. I provided evidence from similar past incidents to illustrate how oversight could lead to serious consequences. I proposed a joint review of their processes to find efficiencies rather than delays. I assured open communication to resolve issues collaboratively.
Outcome:
The Managing Director reluctantly agreed to the process review. No major delays or costs resulted. The improved reports strengthened trust and transparency. The subcontractor was ultimately able to demonstrate improved safety practices. Potential hazards were addressed before construction began, avoiding future non-compliance issues or incidents.