22 shirts take 1 hour to dry when laid out in the sun. How long do 43 shirts take?
- User
22 shirts take 1 hour to dry when laid out in the sun. How long do 43 shirts take?
Assistant
Since the drying of shirts is directly proportional to the number of shirts, we can set up a proportion:
22 shirts / 1 hour = 43 shirts / x hours
Cross-multiplying, we get:
22 * x = 43 * 1
Solving for x, we get:
x = (43 * 1) / 22
x = 1.95 hours
Therefore, it takes 1.95 hours to dry 43 shirts when laid out in the sun.
Other models, same or similar prompt
Responses were produced in different, uncontrolled contexts (system prompts, settings, prior turns). This is not a benchmark.